Proximal Orbit Science Team (POST) Summary

Slides:



Advertisements
Similar presentations
{Customer} Divisions Plan {Date} – {Version} Salesforce.com.
Advertisements

Chandra User’s Committee Meeting (4/15/08) P. Slane (Chandra Mission Planning) Constraint Classifications and the Chandra Long-Term Schedule.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
Orbital Operations – 2 Rendezvous & Proximity Operations
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
CIRSGSFC April 2004 dej-1 CIRS Instrument Overview CIRS Team Meeting Observatoire de Paris - Meudon April 26 – CIRS Instrument Group presented.
Chandra X-Ray Observatory CXC Paul Plucinsky EPI Cal Update on ACIS Operations I.New Patch for ACIS Flight SW II.Control of the ACIS FP temperature.
Cassini ISS Robert West ISS Deputy Team Leader JPL.
NASA Cassini Spacecraft Technology Report Nicole Iwaki ITMG
Agenda Teams Responsibilities Timeline Homework and next steps.
Science & Music Project Overview Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 Phase 7 Phase 8 Final Notes All phases will be completed over the course.
COMT 3911 Satellite Basics COMT 391 Wireless. COMT 3912 Satellite Components Satellite Subsystems –Telemetry, Tracking, and Control –Electrical Power.
1 HRSA Division of Independent Review The Review Process Regional AIDS Education and Training Centers HRSA Toni Thomas, MPA Lead Review Administrator.
1 Proximal +/- 1 hr Priorities June 5, 2014 RPWS Team Science Priorities (+/- 1 hr) W. Kurth and D. A. Gurnett For the RPWS Team Cassini PSG Telecon 5.
Summary of Findings Government Parking District SAC January 23, Downtown Parking Advisory Committee Government Parking District Report Rick Williams.
MSDWT Teacher Evaluation Information.  The primary evaluator will assign the final rating  The primary evaluator will take the lead on any Performance.
Running Head and Cover Page write-a-cover-page-in-apa-style cover-apa-style.html.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
Jan 2008 LMSSC - 1 SWEA Plume Impingements Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission.
06/28/10UVIS TEAM MEETING OPERATIONS UPDATE UVIS TEAM MEETING OPERATIONS UPDATE 1.
Balance of Energy on Earth Yumna Sarah Maria. The global energy balance is the balance between incoming energy from the sun and outgoing heat from the.
Titan and Saturn reports June, TOST agenda.
UVIS Team Meeting Berlin 2009 Saturn and Titan Planning Bob West Working with Don Shemansky.
The Education System In Bulgaria
Aero-Space Education Squadron Aerospace EducationTeam Civil Air Patrol
Practice Experience 101 Boot Camp
Tour Re-planning and Upcoming Observations
Introduction to the Marzano Teacher Evaluation Model for USD 259
Lunar Trajectories.
WEQ OASIS Subcommittee
Voluntary Contributions
Course Changes for semester 2?
Session 30 Transition to the Certification Phase of Training
Welcome to the Nevada Test Administration Training and Q&A Session
Sarah M. Milkovich UVIS Team Meeting, Pasadena 8 January 2009
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
RTWT and Science Planning Report
Science & Music Project
Take GOOD notes, because you must do this perfectly to get credit!!!
Kletskous Magnetic Stabilization
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
XM Status, Priorities and Plans, XXM Activities Icy Satellite Science
Launch and On-orbit Checkout
XM Status, Priorities and Plans Icy Satellites
Enceladus Plume Simulations
UVIS TEAM MEETING OPERATIONS UPDATE
Shawn M. Brooks – UVIS Investigation Scientist
BASIC ORBIT MECHANICS.
XM Status, Priorities and Plans, XXM Activities Icy Satellite Science
Equitable Services Sections 1117 and 8501 of the Elementary and Secondary Education Act (ESEA), as amended by the Every Student Succeeds Act (ESSA),
Shawn M. Brooks – UVIS Investigation Scientist
Modified Schedule Today
Setting ABC in Scallop A15 Summary of updated ACL section since Feb SSC meeting August 11, 2009.
Upcoming Events Cassini Equinox Mission
UVIS Saturn EUVFUV Data Analysis
for Instructors and Roster Contacts
Evaluation Information
Project Name - Testing Iteration 1 UAT Kick-off
Gravitational radiation from known radio pulsars using LIGO data
for Instructors and Roster Contacts
A Quick Carl D. Perkins Act Update
Titan Flyby Altitude – Tour Updates Upcoming Observations in 2006
Team A Propulsion 1/16/01.
Faculty Center for Instructors
Basic preconditions The next round of population and housing censuses is scheduled for the start of the new decade (2021), both in the EU and in the partner.
The Deorbiting of GOCE – A Spacecraft Operations Perspective
UVIS TEAM MEETING OPERATIONS UPDATE
Presentation transcript:

Proximal Orbit Science Team (POST) Summary M. Evans Thursday Feb 12th 2015 v2

Option 9 https://cassini.jpl.nasa.gov/projscimtg/fprox/POST_option_9_141210.pdf https://cassini.jpl.nasa.gov/projscimtg/fprox/option9_portrait_141210.pdf

The POST Periods The POST period times are absolute (not epoch relative) and will not change POST_periods_option_9_141210.pdf

Option 9 (141210). Description and Liens Rev 271 – This is a designated “cool” orbit. See the section on Cool Orbits. Observe Saturn polar regions inbound/outbound for CIRS/VIMS when their respective radiators are cooler (In approximately the 1-2 hrs from periapse periods). ISS does the PDT design for the entire -/+ 2 hrs period including the HGA to RAM period. Rev 272 – MAG to roll about an axis other than Z (i.e. X or Y). CDA to be consulted about secondary orientation/roll phase at RPX. MAG requests that periapse be done under RCS control. Will be using RCS for central 5 hrs. Rev 273 – RSS gravity pass, XBAND to Earth primary. MAG Range 1 calibration - rolling for 5 hours during the inbound portion (periapse -11:40 to -06:40). MAG Range 2&3 calibration – rolling for 5 hours centered on periapse. CDA to be consulted about secondary orientation/roll phase at RPX. Rev 274 – RSS gravity pass. XBAND to Earth primary. CDA to be consulted about secondary orientation. Rev 275 – RSS gravity pass. XBAND to Earth primary. CDA to be consulted about secondary orientation. Rev 276 – RADAR Rings on the inbound portion which then hands of at RPX -10 mins at HGA to RAM. At RPX +10 mins ISS Rings picks up at HGA to RAM. Coordination required regarding the choice of secondary for the HGA to RAM period. Rev 277 – ISS Rings on the inbound portion which then hands of at RPX -10 mins at HGA to RAM. At RPX +10 mins RADAR Rings picks up at HGA to RAM. Coordination required regarding the choice of secondary for the HGA to RAM period.

Rev 278 – RSS gravity pass. XBAND to Earth primary Rev 278 – RSS gravity pass. XBAND to Earth primary. CDA to be consulted about secondary orientation. Rev 279 – Joint INMS/CDA. NEG_X to RAM with secondary chosen for CDA. Rev 280 – RSS gravity pass. XBAND to Earth primary. CDA to be consulted about secondary orientation. Rev 281 – This is a designated “cool” orbit. See section on Cool Orbits. Observe Saturn polar regions inbound/outbound for CIRS/VIMS when their respective radiators are cooler. (In approximately the 1-2 hrs from periapse periods). ISS does the PDT design for the entire -/+ 2 hrs period including the HGA to RAM period. Rev 282 – UVIS Rings on the inbound portion which then hands of at RPX -10 mins at HGA to RAM. At RPX +10 mins RADAR Rings picks up at HGA to RAM. Coordination required regarding the choice of secondary for the HGA to RAM period. Rev 283 – Joint INMS/CDA. POS_X to COROT with secondary chosen for CDA. Rev 284 – RSS gravity pass, XBAND to Earth primary. MAG Range 1 calibration - rolling for 5 hours during the inbound portion (periapse -11:40 to -06:40). MAG Range 2&3 calibration – rolling for 5 hours centered on periapse. CDA to be consulted about secondary orientation and roll phase at RPX. Rev 285 – MAG to roll about an axis other than Z (i.e. X or Y). CDA to be consulted about orientation choice/roll phase at RPX. MAG requests that periapse be done under RCS control. Will be using RCS for central 5 hrs. Rev 286 – This is a designated “cold” orbit. See section on Cold Orbits. POST has explicitly allocated the time from periapse -1hr to periapse +7 hrs for auroral/Enceladus studies. VIMS and CIRS will negotiate the exact division of the time. The allowable heating in each of the VIMS/CIRS periods is subject to negotiation.

Rev 287 – Joint INMS/CDA. POS_X to COROT with secondary chosen for CDA. Rev 288 – INMS. POS_X to COROT secondary should be NEG_Z to Saturn for RADAR Saturn. Rev 289 – This is a designated “cold” orbit. See section on Cold Orbits. Since the periapse altitude is so low atmospheric drag and heating become a consideration. Its possible that constraints imposed by aerodynamic heating will prevent this orbit being truly cold and that it will be “cool” instead. This periapse will be made as cool as is practical. CIRS & VIMS observations are permitted but may be prevented by the necessity of adopting a non-science minimal heating (both aerodynamic and radiative) pointing profile. Rev 290 – RADAR. NEG_Z to Saturn. Secondary chosen for INMS (POS_X to COROT) Rev 291 – INMS. POS_X to COROT secondary should be NEG_Z to Saturn for RADAR Saturn. Rev 292 – INMS. POS_X to COROT secondary should be NEG_Y to Saturn for ISS Saturn.

Cold Orbits The rev 286 & 289 periapses have been designated by POST as “cold orbits”. At no time during the POST period may the CIRS radiator delta_T be more than 3K -- this restriction is superseded if M. Flasar approves a CIRS radiator heating profile that covers the entire POST period. At no time during the POST period may the VIMS radiator delta_T be more than TBD* -- this restriction is superseded if R. Brown approves a VIMS radiator heating profile that covers the entire POST period (*will be set once the new VIMS thermal code is available). POST 286 – only VIMS Prime Saturn and CIRS Prime Enceladus observations my be integrated by the TWT in this period POST 289 – During the S/PIE process POST recommends that any VIMS/CIRS Saturn/Rings PIEs have precedence in the ~6 hrs immediately following the POST period. No additional restrictions placed on integration. These requirements will likely affect the choice of inbound observations prior to the POST period. Heating during both the pre-POST TWT time and the pre-periapse POST time can be significant if using an ORS to Saturn science orientation. The POST cold orbit requirement has priority over a PIE and may prevent the PIE from being integrated as desired

Cool Orbits The rev 271 & 281 periapses have been designated by POST as “cool orbits”. At no time during the POST period may the CIRS radiator delta_T be more than 6K -- this restriction is superseded if M. Flasar approves a CIRS radiator heating profile that covers the entire POST period. At no time during the POST period may the VIMS radiator delta_T be more than TBD* -- this restriction is superseded if R. Brown approves a VIMS radiator heating profile that covers the entire POST period (*will be set once the new VIMS thermal code is available). POST 271 & 281 – During the S/PIE process POST recommends that any VIMS/CIRS Saturn/Rings PIEs have precedence in the ~6 hrs immediately following the POST period. No additional restrictions placed on integration. These requirements could affect the choice of inbound observations prior to the POST period. The POST cool orbit requirement has priority over a PIE and may prevent the PIE from being integrated as desired

Periapse passages to be performed using RCS Due to the spacecraft being close to or in the atmosphere it is a requirement that the final five periapses, 288-292, be performed using RCS. MAG has requested that the two periapses when it is performing non-Z axis calibration rolls, 272 & 285, also be done using RCS. Summary

Spacecraft orientations at the start and end of the POST periods The TWTs allocated the segments that include the POST periods will have to hand-off/pick up at the start/end of the POST allocated blocks of time at the desired pointings of the POST observations i.e. the TWTs are responsible for the turns to/from the POST observation attitudes in “their” time.

Remaining Issues Concerns regarding rev 289. Our ability to achieve a “Cold Orbit” remains in doubt. Fallback position if we’re reduced to 1 cold orbit? Give 286 to INMS and then make one of the earlier INMS periapses a cold orbit instead (which one?) is an option. CDA has an interest in the secondary orientations in eleven revs. 272-275 278-280 283-285 & 287. They have yet to sign off on the designs for a number of revs (which revs?) MIMI has an in interest in the orientations for all revs. They need to analyse all 22 designs in order to determine if their requirements have been met. If they haven’t some rework may be necessary. VIMS heating model. When this becomes available the current designs need to be run through it. If heating turns out to be unacceptable POST allocations may need to be reworked All current designs to be run through CIRS heating model to identify additional serendipitous cool/cold orbits. Status of period immediately following the rev 289 POST period i.e. periapse +1 hr to ~+7 hrs. The expectation is that VIMS/CIRS rings/atmospheres observations will be made. Do we leave this to the TWT allocated the segment or provide some formal guidance? Should PIE hours be used for CIRS/VIMS rings/Saturn during this time? Exact timings of the 20 minute duration HGA to RAM dust hazard periods that are required in revs 271, 276, 277, 281 and 282. The CIMS entries are a little confused. Do we need to go down to the second level or is rounding to the nearest minute O.K.?