Fast Roaming Study Group Closing Report May 2004 January 2002 doc.: IEEE 802.11-02/xxxr0 May 2004 Fast Roaming Study Group Closing Report May 2004 Reports from ad-hoc groups: Milestones for TGr - (04/0517) Current BSS-Transition architecture and process - (04/0503) Application types and BSS-transition requirements - (04/0579) Key requirements - (04/0516) Clint Chaplin, FR SG Chair John Doe, His Company
Presentations WIEN Study Group Vision (04/0607) May 2004 Presentations WIEN Study Group Vision (04/0607) What is an ESS? (04/0614) Use of EAPOL-Key messages during pre-auth (04/0542) Multiple concurrent associations as a means of doing fast roaming (04/0549) Pre-keying (04/0476) Tentative association (04/0606) Quick scan mechanism for fast BSS transition (04/0487) Clint Chaplin, FR SG Chair
Output Scope clarification (04/608) Functional requirements (04/617) May 2004 Output Scope clarification (04/608) Functional requirements (04/617) Preliminary timeline Minutes (04/520) Clint Chaplin, FR SG Chair
Goals for July for Fast Roam SG May 2004 Goals for July for Fast Roam SG None! Clint Chaplin, FR SG Chair
May 2004 Goals for July for TGr Define selection criteria and performance data to be included in formal proposal Finish defining formal scope and requirements Call for formal proposals (with normative text) to be presented no later than November 2004 and to be posted and WG notified at least 30 days before presentation Clint Chaplin, FR SG Chair
Teleconference Authorization May 2004 Teleconference Authorization Move to authorize teleconferences to be held by TGr no more than once every two weeks starting no earlier than May 29, 2004, and prior to July 31th, 2004. Moved: Jesse Walker/Bob Love Vote: 24/0/0 Clint Chaplin, FR SG Chair
Teleconference Announcement May 2004 Teleconference Announcement Announce teleconferences to be held by TGr June 1 at noon PDT (June 1st 15:00 IEEE) June 15 at noon London time (June 15th 07:00 IEEE) June 29 at noon Tokyo time (June 28th 23:00 IEEE) Clint Chaplin, FR SG Chair