Version Control Master Data

Slides:



Advertisements
Similar presentations
Tutorial EBSCOadmin User Groups support.ebsco.com.
Advertisements

Introduction SAP Material Planning Dr. Djamal Ziani King Saud University.
High Lights of SAP Business One for Manufacturing.
New Features Adaptive Suite.
Accelerated Computer Technologies Company Overview.
13 APS. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
David Warne Independent Manufacturing Consultant.
2013.  Modify QuickBooks Preferences  Customize QuickBooks Menus and Windows  Customize the Icon Bar and Display Settings  Use the Item List and Other.
WEB Apps Product Info. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
Enhancements From R6, R7.x to R9 Enterprise Product Data Management (EPDM) David Kemp
| See the possibilities… Item Template Basics.
Giving Yourself Options – Using Oracle Assemble To Order (ATO) Bob Collins, CFPIM, CIRM SSI North America Chicago, IL August 15, 2003.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
iProcurement Features & Functions The Department of Procurement & Contracts.
 SAP AG 2007 Production Maintaining bills of material (BOM) Production process Contents:
Midwest User Group September 23, 2013 Grand Rapids, MI Paul Rubin Strategic Information Group Advanced Repetitive vs. Work Orders The Great Debate.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Welcome! User Conference 2011 Presenter: Jeff Weaver.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Retail Graph Version Release on 13/03/2014.
PestPac Software. Pay On Commission Commission can be paid on Production, Receipt, or Up-Front. Production: Commission will be paid when work is completed/an.
Authored by Frank Hamelly, Microsoft MVP Regional Chapters.
Chapter 2 Page ref. Chapter 2 Customizing QuickBooks 53.
McGraw-Hill/Irwin Introduction to QuickBooks Pro, 2004 © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 11 Customizing QuickBooks.
Complete Distribution Operations Automation
Production Contents: Maintaining bills of material (BOM)
Production Software Production Production.
Introduction to the new robust security system from SCC.
HR Operations-2.
Production: Product Costing Planning
Using Item Attributes in a Make-to-Order Environment
Material Requirements Planning (MRP)
Facility Inventory Old Facilities Modern Facilities Classroom Size
Dynamics GP Manufacturing
Single Sample Registration
Control Center: Order Status
22-INTEGRATION HUB
Production Contents: Maintaining bills of material物料清單(BOM)
Corporate Risk Registers
EzyAccounting An Accounting Software An Accounting Software By: Delicate Software Solutions Dubai, Manage Your Business… Not Just Accounts.
Complete Management of your Entire Backflow Program
Maintenance module Martin Heigl CTO
New Features of Security Management 11
Oracle Configurator Cycle
The Production Process
13 APS
06 Master Data – Item
09 Calculation
Enhancement Notification Release 5.4
07 Master Data – Tools
NextGen Utility Billing
Reserved for Intro Picture
Material Requirements Planning (MRP)
To the OASIS Work in Progress Online Training Course
What’s New in Universal Access for ADP Workforce Now
Resource groups
External Production Daniela Narváez Quality Control
Lesson Nine: Epic Appointment Scheduling Referrals Reports
DA0492 BOM /Route Supersessions & Alts.
Product Training Jobs Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Lesson Nine: Epic Appointment Scheduling Referrals Reports
All Right Reserved © JiJi Technologies Pvt Ltd
Lesson Nine: Epic Appointment Scheduling Referrals Reports
Introducing Scenario Network Data Editing and Enterprise GIS
Better Management of Instructors
Ticketing system design review
Tour - session 3 Calendars, Work Centers and Routings
All Right Reserved © JiJi Technologies Pvt Ltd
LO090 Product Data Management LO090 PDM-Overview PDM Overview LO 090
Presentation transcript:

Version Control Master Data Daniela Narváez Quality Control Daniela.narvaez@beasgroup.com

Version Control Master Data Version Control Functionality Version & Status Management BOM & Routing Management Version Control Reports

Version Control Functionality Version control is a new functionality from beas that allows to define one or more item structure (BOM and routing) for one finished good or assembly item Benefits Enhancements in master data management: flexibility in usage of several Bill of Materials or Routings for one Finished Good or Assembly Version control scope: at the moment, version control can only apply for manual Work Order management. MRP process is out of scope at the moment Version control reports: accessibility for detailed information within versions and comparisons of variances between versions

Version Control Functionality Version control is a new functionality from beas that allows to define one or more item structure (BOM and routing) for one finished good or assembly item Standard Scenario Version 1 Version 2 Item A Item A.1 Item A Raw Material A Raw Material B Raw Material C Raw Material A Raw Material B Raw Material D Same Item, different BOM (*) Raw Material A Raw Material B Raw Material C Raw Material A Raw Material B Raw Material D BOM1 BOM2 BOM1 BOM2 Before After Only one version can be active BOM and routing are bound to the product, there is a 1:1 linkage between them. In the product, a version number can be stored. The version is assigned to the item and to the BOM and/or routing Features: Firm connection to Routing Firm connection to BOM Firm connection to Version No multiple use of BOM No multiple use of Routing (*) Also applies for Routing

Version Control Functionality Version control is a new functionality from beas that allows to define one or more item structure (BOM and routing) for one finished good or assembly item Standard Scenario Version 1 Version 1 Item A Item B Item A Item B Different Item, same BOM or Routing BOM1 BOM2 BOM1 BOM2 Not linked to any version ROU1 ROU1 ROU1 ROU1 Before After Only one version can be active BOM and routing can be created and managed independent of the product. BOM and routing can be assigned to any products (Multiple use) Features: Changeable link to Routing Changeable link to BOM Changeable link to Version Multiple use of BOM Multiple use of Routing

Version Control Functionality Version control is a new functionality from beas that allows to define one or more item structure (BOM and routing) for one finished good or assembly item Separated Bill Of Materials Scenario Version 1 Version 2 Item A Item A.1 Item A Same Item, different BOM or Routing BOM1 BOM2 BOM1 BOM2 Not linked to any version ROU1 ROU2 ROU1 ROU2 Before After Only one version can be active BOM and routing are linked to the product via version. BOM and routing are managed separately, they can be assigned to any version. The BOM and routing tabs on Item master data will disappear This is the most flexible option, but also most complex to be managed Features: Changeable link to Routing Changeable link to BOM Changeable link to Version Multiple use of BOM Multiple use of Routing

Version Control Master Data Version Control Functionality Version & Status Management BOM & Routing Management Version Control Reports

Version Control Management Item Master Data The version is created directly on the item master data from item structure You can define the type of administration per item: Default = ID of BOM and routing are the same as the item ID. This means the BOM and routing is linked to the item by version Extended view = like default, but in structure view the BOM / routings are displayed per version. This setting affects only the display. Separate BOM = Item ID, BOM ID and routing ID can be different. In item version you store, which BOM is to use for the item and for the version. In the BOM you define, which routing to use

Version Control Management Item Master Data The version is created directly on the item master data from item structure

Version Control Management Version Master Data In the screen, the user can create, edit or view the version The system will have some default status to select or the user can create his own status

Version Control Management Version Master Data The user can define the range of time the version will be used according to the business process. This applies when a raw material from the BOM is promotional and will be out for only a month

Version Control Management Status Master Data The status brings the option to filter the usage of the version within beas processes. It declares if the version will apply on the sales order creation, work orders and processes of issues and receipts

Version Control Master Data Version Control Functionality Version & Status Management BOM & Routing Management Version Control Reports

Version Control Management Bill of Material Master Data The version is created directly on the item master data from item structure You can define the type of administration per item: Simple Item i-version control Different Version in one bom – list or routing list. You can set per position, if the entry is active for this i-version

Version Control Management Routing Master Data The version is created directly on the item master data from item structure You can define the type of administration per item: Simple Item i-version control Different Version in one bom – list or routing list. You can set per position, if the entry is active for this i-version

Version Control Management Separate BOM Master Data On the version master data, when selecting “Separate Bill of Material”, there will be two new fields where you can assign an specific BOM (recipe) or routing You must define the bill of material or routing on the specific master data: The system allows to duplicate bill of materials and routings and create several according to the business requirements When you assign the BOM and/or routing, that master data is not assigned directly to the version, in other words, each raw material is independent from the version The routing will be assign on the BOM screen

Version Control Management Duplicate BOM Master Data The system allows to duplicate a bill of material and edit according to the business scenarios

Version Control Master Data Version Control Functionality Version & Status Management BOM & Routing Management Version Control Reports

Version Control Reports List of Differences The system shows differences between BOM: New positions Positions changes

Version Control Reports Structure Report The structure shows all levels from the item, going through sub-assembly and raw material. Also the routing within each level The system shows the complete structure from the item according to the version requested and routing if needed