Chapter 7 AVANT EXPANSION
North Avant Expansion 325 328 Bring 325 and 328 in on clicks
#325 #328
The effect of 325 and 328 on production North Avant Expansion 55 BOPD x 850 BWPD Add in production text box “ 4 Hz Wells” The effect of 325 and 328 on production
North Avant Expansion 8 36 325 328 Bring 8 and 36 in on clicks
#8 #36
The effect of 36 on production North Avant Expansion 85 BOPD x 1200 BWPD Add to production text box 6 Hz Wells The effect of 36 on production
North Avant Expansion 36 8 325 328
#8 Re-Drill
Production after re-drilling 8 North Avant Expansion 110 BOPD x 1500 BWPD Add to text box 6 HZ Wells Production after re-drilling 8
Avant Expansion Conclusion 2 new vertical wells: Re-drilled horizontal 4 old wells (95+ years): Plugged back and drilled horizontal 1 old well: Plugged back and re-drilled horizontal
Workshop Summary Team approach Understand depositional environment Computer model reservoir to determine economics of horizontal wells Determine completion requirements Design horizontal drilling program to satisfy completion requirements