GRAPES-3 Detector Development

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
15th Dec, 2007DAE-SNP07 S.S.Upadhya1 Electronics and Data Acquisition system for prototype INO-ICAL detector A.Behere1, V.B.Chandratre1, S.D.Kalmani2,
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Multi-TeV  -ray Astronomy with GRAPES-3 Pravata K Mohanty On behalf of the GRAPE-3 collaboration Tata Institute of Fundamental Research, Mumbai Workshop.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Silicon Photomultiplier Development at GRAPES-3 K.C.Ravindran T.I.F.R, OOTY WAPP 2010 Worshop On behalf of GRAPES-3 Collaboration.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
R & D Status report on INO Naba K Mondal Tata Institute of Fundamental Research Tata Institute of Fundamental Research Mumbai, India.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
LHCb Outer Tracker Electronics 40MHz Upgrade
Work on Muon System TDR - in progress Word -> Latex ?
DAQ ACQUISITION FOR THE dE/dX DETECTOR
ETD PID meeting We had many presentations dedicated to the PM test .
ATUL JAIN (CRL-TIFR, Ooty) on behalf of GRAPES-3 Collaboration
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
GRAPES-3: Status of ROOT Based Monitoring and Analysis
Recent R&D Milestones at GRAPES-3
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
New LED driver Preliminary tests
ETD meeting Electronic design for the barrel : Front end chip and TDC
SHiP straw tracker prototype tests
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
PADME L0 Trigger Processor
Silicon Lab Bonn Physikalisches Institut Universität Bonn
INO TRIDAS presentations
News on second coordinate readout
Hideyuki Sakamoto CM22, RAL 19/10/08
Hellenic Open University
Christophe Beigbeder/ ETD PID meeting
Conceptual design of TOF and beam test results
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Han Jifeng BESIII MUON GROUP IHEP, CAS
Commodity Flash ADC-FPGA Based Electronics for an
On behalf of CEPC calorimeter working group
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Collaboration between Hall C and Hall D
PID meeting Mechanical implementation Electronics architecture
ZDD status BESIII Collaboration Meeting, September 2012
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

GRAPES-3 Detector Development Past, Present & Future Atul Jain on behalf of GRAPES-3 collaboration , Cosmic Ray Laboratory, Ooty DHEP, Annual Meeting - 7 April,2016

Scintillation Detector 11/10/2018 GRAPES-3 3712 400 Muon Detector Scintillation Detector ScDet 35 Hz 50 KHz Monitoring EAS DAQ EAS TRIGGER MUON EAS DAQ MUON ANGLE DAQ Weather Data Sc_RATE 1 GB Sc_MAIN 15 GB Mu_ MAIN 1 GB Mu_ANGLE 4 GB PRE ANALYSIS Monitoring Performance Compression of data Conversion to ROOT SMS Alert GRAPES-3 Computer Cluster (Poster by Hari) 2

Plastic Scintillator Detector ( Poster by V. Jhansi & Meeran Zuberi )

High performance plastic scintillation detectors - 400 Spread over an area - 25,000 m2

Plastic Scintillator Casting

Proportional Counter Gas Mixture Total 3712 nos Total Area 560 m2 11/10/2018 Gas Mixture 90% Ar +10% CH4 Total 3712 nos Total Area 560 m2 Absorber 2.4 m Threshold E = 1 GeV Proportional Counter

Inside view of Muon Supermodule at GRAPES-3 11/10/2018

4 3 4 3 1 2 1 2 Proportional Counter - 3712 nos Total area - 560 m2

Expansion of Muon Detectors (Talk by P.K.Mohanty) Proposal to double the area of Muon Detectors 560m2  1130m2 3712nos  7488nos Fabrication of PRC’s in Final Production Mode ( Poster by Kaviti Ramesh) Target – 3776 nos (Status as on 4 April 2016 ) Fabrication - 1059 nos Helium Leak Test - 1034 nos MCA Test - 1008 nos Final Test Bench - 512 nos Installed in Field - 59 nos

Test Bench 1 (16x8=128 PRC) Test Bench 3 Test Bench 2 Test Bench 4 Test Bench 5

1 2 3 4 5 6 7 8

PRC’s Placed for Layer-0 PRC New Area with Counters 4 1 PRC’s Placed for Layer-0 2 3 5 8 6 7

PRC Mobile Test Bench

Amplifier and Discriminator for PRC (Poster by Kaviti Ramesh) Proportional counter’s base PCB Dimensions: 72 cm X 8 cm -Single layer PCB -Houses Eight Channels - Taken care of EMI/EMC -Powers all the Channels -Can with stand 5 KV -Provides connectivity to DAQ PC

Proportional counter Performance (Poster by Anuj Chandra) Old Amplifier Board New Amplifier Board Mu Ar Fe Zn Ar_peak : 3.0 keV Fe_peak : 6.4 keV Zn_peak : 8.6 keV Mu_peak : 20.0 keV

EAS Scintillator DAQ TRIG & GATE Level-0 Trigger HV Distribution GRAPES HV Distribution GRAPES Amplifier & Discriminator GRAPES Pulse Fan-out GRAPES EAS Trigger GRAPES Level-1 Trigger GRAPES ARRAY OF DETECTORS Clear 400…........721 EAS Trigger GRAPES Master Controller GRAPES Real Time Clock ADC CAEN GRAPES GRAPES-3 HPTDC GRAPES CAMAC Controller GRAPES Memory Buffer PCI Interface Clear GPS Receiver Meinberg GATE TRIG WAPP-2008

(Poster by Pankaj Rakshe) EAS Scintillator DAQ TRIG & GATE Level-0 Trigger GRAPES HV Distribution & HV Monitoring GRAPES Amplifier & Discriminator GRAPES Pulse Fan-out GRAPES EAS Trigger GRAPES Level-1 Trigger GRAPES ARRAY OF DETECTORS Clear 400…........721 EAS Trigger GRAPES Master Controller GRAPES Real Time Clock ADC CAEN GRAPES GRAPES-3 HPTDC GRAPES CAMAC Controller GRAPES USB Interface Board (Poster by Pankaj Rakshe) Clear GPS Receiver Meinberg GATE TRIG WAPP-2008

EAS Scintillator DAQ TRIG & GATE HV Distribution & HV Monitoring GRAPES Amplifier & Discriminator GRAPES FPGA Based Programmable TriggerLogic GRAPES Pulse Fan-out GRAPES GRAPES ARRAY OF DETECTORS Clear 400…........721 EAS Trigger ADC CAEN GRAPES GRAPES-3 HPTDC FPGA Based Integrated CAMAC DAQ Master Controller Real Time Clock CAMAC Controller USB Interface GRAPES Clear GATE TRIG WAPP-2008

Muon DAQ Mu_Main Card (ISA) RAM Amplifier Proportional RAM Control & Counter Amplifier & Discriminator RAM Card RAM Control Card PWA & CRM Card (ISA) Pulse Latch Card Module Control Card Interface Card (PCI) WAPP-2008

Muon DAQ Mu_Main Card (ISA) RAM Amplifier Proportional RAM Control & Counter Amplifier & Discriminator RAM Card RAM Control Card PWA & CRM Card (USB) (Poster by Kaviti Ramesh) Pulse Latch Card Module Control Card Interface ( TCP/IP) (Poster by Pankaj Rakshe) WAPP-2008

Muon DAQ FPGA Based Integrated Muon DAQ RAM Amplifier Proportional RAM Card Pulse Latch Card RAM Control Card Module Control Card Mu_Main Common Control Card PWA & CRM PC interface with TCP/IP Proportional Counter Amplifier & Discriminator RAM Control Card WAPP-2008

Projects and Training at CRL, Ooty CRL, TIFR and VIIT Collaboration (2011-2016 ) - 242 Project students CRL,TIFR and other Colleges/University - 27 Project students Training of students and faculty from collaboration on aspects of Detector Fabrication and Signal Processing ( ~ 30 members) Setting up experiments for M.Sc students at Bose Institute , Kolkatta, Dayalbag Educational Institute, Agra

Building Blocks

Assembling building blocks for new applications FPGA based Pulse Width Analyser with USB interface for 64 channel FPGA based Mobile Test Bench for 8 channel TCP/IP interface board for Muon DAQ system FPGA based muon tracker Programmable temperature controller and DAQ for heating PRC bed USB interface board for Sc_main DAQ system USB interface board for Sc_Rate DAQ system High Voltage Monitoring system with USB interface. FPGA based Programmable Logic Unit with Scalar and USB interface FPGA based Muon Life Time measurement with USB interface

Future Steps FPGA based integrated CAMAC DAQ FPGA based Programmable Trigger Logic FPGA based Muon DAQ system Front End and Back End Electronics for 7488 PRCs

National Science Day 28 Feb 2016 – 601nos Public Lecture on 27 Jan 2016 – 1161nos Students visit to GRAPES-3 (2015) – 840nos

THANKS http://grapes-3.tifr.res.in

Back

Back