Efficient procurement of extended reserve Industry briefing

Slides:



Advertisements
Similar presentations
Reliability Center Data Request Task Force Report WECC Board Meeting April 2009.
Advertisements

Modular and Portable Buildings Association Current and Future Energy Efficiency (Building Regulations Part L2) Key drivers.
Review of industry code governance 26 March 2010.
CIP Version 5 Update OC Meeting November 7, 2013.
Government Framework for Campaign Advertising and Related Services 23 November, 2007.
WRA 453 Grant & Proposal Writing Fall 2005 Bill Hart-Davidson Session 9: Proposals - criteria for evalaution; P2 Guidelines.
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
Reliable Power Reliable Markets Reliable People Rule 6.6 Recommendation Update January 29, 2009.
REPORT TO GRPE 68 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document No. GRPE (68 th GRPE, 9-10 January, 2014,
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
MyFloridaMarketPlace Roundtable January 21, :00 a.m. – 12:00 p.m. MyFloridaMarketPlace.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
Presentation to Community Reference Group Thursday 7 February 2013 Patterson Lakes Community Centre.
Issue 2 - Quarter 2 (2001) After identifying that a need has been required for several years to update the current rudimentary assignment model used for.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
State of Kansas Financial Management System Needs Assessment Validation Steering Committee Meeting October 25, 2006.
WORKSHOP 1 EXTENDED RESERVE (AUFLS) Afternoon session - design of the operational phase 2 & 3 September 2015.
Serving the people of Cumbria Do not use fonts other than Arial for your presentations Commissioning, Procurement & Contract Management Staff Engagement.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
2010 Legislative Highlights For Redevelopment (Community Development and Urban Renewal) J. Craig Smith Kyle C. Fielding S mith | H artvigsen, PLLC 215.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Extended Reserve Selection Methodology Workshop 2 Default values and proposed payment mechanism 1.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Selecting Extended Reserve Emily Calvert, Energy Analyst 1.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
PRODML SIG Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston.
PUBLIC PROCUREMENT ACHIEVEMENTS IN 2013 CHAPTER 1: INCREASING OF THE NUMBER OF PROCEDURES AND CONTRACTING AUTHORITIES CARRYING OUT PROCUREMENT PROCEDURES.
Efficient procurement of extended reserve Workshop 3 – operational management 28 April Auckland Clive Bull – Strata Energy Consulting.
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
Draft 2015 electricity distribution price-path reset Briefing for financial market analysts 4 July 2014 Sue Begg Commerce Commission.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Extended Reserve Technical Requirements Schedule (TRS) Presenters: Justin Blass, Project Manager Gillian Rodger, Power System Analysis Kevin Wronski, Compliance.
Power of choice – embedded networks information session
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
The role & function of the Office of Government Commerce (OGC) in developing the UK public procurement system, the role of OGC’s Procurement Policy Unit.
Pre-Proposal Conference
Stakeholder Consultation
Welcome to the Green.Arkansas.gov Question & Answer Session
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
Question and answer session
Code Governance Review UNC Modification Proposals
PROGRAM CONSULTATIVE FORUM Meeting pack
KORRR INFORMAL STAKEHOLDER WORKSHOP
Large Projects proposed approach
Program Control Services – Overview
OFFICE OF THE CITY CLERK SEPTEMBER 22, 2014 CITY COUNCIL MEETING RESCIND RESOLUTION NO AND ADOPT A RESOLUTION ESTABLISHING THE RULES GOVERNING.
Draft extended reserve selection methodology
Data provision changes
Noel Reardon Auckland Regional Council
CANNABIS CONTROL COMMISSION
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
APPA – Term 3 Breakfast Session
IEEE Task Group G Adopted Agenda for January 2001 Session
CSS Update for CoMC 19th September 2018
Engagement on the Comprehensive Funding Agreement
Submission Title: f Task Group Mid-Week Report for Atlanta, Georgia
Rebecca Hailes For 15 March 2018
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Agenda Introductions Overview Presentation
CANNABIS CONTROL COMMISSION
Options for the Development of a Demand Side Response Mechanism
CUSC Amendment Panel Recommendation
Generic Revenue Driver Methodology
Industry Governance Group 14th August 2013
Energy Storage Roadmap & Flexibility Roadmap Information Session
Legislative Update: SB 2224 and SB 322 October 1, 2019.
Presentation transcript:

Efficient procurement of extended reserve Industry briefing 31 October 2016—Wellington 3 November 2016—Auckland Clive Bull—Strata Energy Consulting

welcome housekeeping—exits, bathrooms introductions—Electricity Authority, Transpower (system operator) and NZX (extended reserve manager)

Today’s Briefing currently consulting on draft technical requirements schedule and draft selection methodology— consultation papers published on Transpower and NZX websites written submissions—due by 5 pm on Tuesday 29 November 2016 neither the service providers nor the Authority have fixed or final views on the matters being consulted on today’s purpose— overview the consultation documents and answer questions help you to better understand the proposals and inform submissions implementation focus—we are not in a position to negotiate decisions the Authority Board has already made regarding policy

the process to date 2014 Code amendment for new extended reserve provisions System reliability Selection efficiency System Operator— reviewed AUFLS system performance published a technical requirements report in 2013 concluded improvements could be made, considered options and recommended a 4-block NI AUFLS scheme—10/10/6/6, min. & max. The Authority— reviewed the way that AUFLS load is procured concluded a centralised selection process would deliver additional efficiency benefits amended the Code (c. 2014) appointed ERM

old vs new AUFLS—system security mechanism—quickly sheds blocks of load old AUFLS new AUFLS a minimum aggregate percentage obligation per distributor— 16%+16% distributors self-select the load & self-manage under-frequency relays—usually at distribution feeder level SO sets new technical requirements NI asset owners provide load data ERM centrally selects DUs from aggregated data ER providers— writes implementation plan for SO approval fit, test, commission, arm provide regular data updates ERM PPR & flexible re-solve

Today’s agenda 10:15 am (now)—technical requirements schedule (system operator) 11:30 am—selection methodology (extended reserve manager) 12:45 pm—lunch break 1:15 pm—data provision process (extended reserve manager) 1:45 pm—implementation planning (system operator) aim to wrap up by 2:30 pm Auckland session times