Mechanical Polishing of 1.3 GHz Niobium Cavities

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Latest Design of ILC ( RDR). 1.3 GHz technology developed by TESLA Collaboration, R&D from 1992 to reduce the cost per MeV by a factor of 20 from current.
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Surface Preparation of superconducting cavities and industrial Production Experience Dietrich Bloess International Workshop on Thin Films applied to superconducting.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
U.S. Plan for Cavity Production Bob Kephart ALCPG09/GDE Sep 30, 2009.
Curtis Crawford, Georg H. Hoffstaetter Cornell University Laboratory for Elementary-Particle Physics Optimization of f 9-cell Vertical Electro Polishing.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
Electropolishing on MICE 201 cavity at LBNL Tianhuan Luo, Universtiy of Mississippi For 805 MHz modular cavity review at SLAC, Oct 2012.
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
C.Cooper Argonne HPR Contamination. C.Cooper Problem Upon removal of the filter that is at the bottom of the spray nozzle for the Argonne HPR System a.
9-cell cavity coordination CM Ginsburg 15 Mar
Aliaksandr Navitski,* Eckhard Elsen, Brian Foster, Felix Schlander, Lea Steder, Marc Wenskat, Sebastian Aderhold, J. Schaffran, U. Cornett, G. Falley,
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
1 Guided Cavity Repair with Laser, E ‐ Beam and Grinding Genfa Wu Recent cavity processing statistics indicate that the development of RF superconductivity.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Summary of STF-EP facility at KEK.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Vertical Electro-Polishing activities at CEA Saclay
Motivation Vertical Electro-Polishing for high gradient cavity R&D.
Electropolishing of Dressed ILC 9-cell Cavity
Condition of electron beam welding toward a high gradient application
ILC-SCRF Test Facilities considerations
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
New Cavity Techniques and Future Prospects
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
Peng Sha Institute of High Energy Physics, CAS
Activities of Cavity Fabrication Facility at KEK
ELLIPTICAL SCRF CAVITIES
Superconducting Cavities: Development/Production
Some History of Electropolishing of Niobium 1970 – 1990
Effort Torwards Improving Large Scale Production for SC Cavities
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
R&D Activity for Field Emission and Vertical EP
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
Quality control study with single-cell cavities
TTC topical-meeting on CW SRF 2013
LCLS-II High Q0 Cavities: Lessons Learned
TTC Meeting, 28 February - 2 March, 2011, Milan
Quench Studies in Single and Multicell N-Doped Cavities
Presentation transcript:

Mechanical Polishing of 1.3 GHz Niobium Cavities TESLA Technology Collaboration Meeting February 28 – March 3, 2011 Milano, Italy TTC Milano, 2011 10/11/2018 C Cooper

Centrifugal Barrel Polishing (CBP) CBP is a mechanical polishing process in which the inside of the cavity is filled with abrasive material and then rotated at high speeds. Main Shaft up to 115 RPM Individual Barrels 115 RPM in opposite direction to main shaft TTC Milano, 2011 10/11/2018 C Cooper

Why do CBP? Uniform Surface Finish Smooth Surface Finish Pit ACC015 Why do CBP? Uniform Surface Finish Remove weld beads and associated defects created from E-beam welding. Smooth Surface Finish (Ra) on the order of 10s of nanometers. Best by EP alone is around 100 nanometers. Environmentally Friendly. Most likely will still require a small amount of chemistry(on the order of 5-10 microns compared to 120 microns for EP) Potential for cheaper installed & operating cost Repair of pit defects that chemistry can’t remove Simple Technology Should prove to be a very repeatable process Easy transfer to industry Weld Bead ACC015 No Pit After CBP Final Finish TB1AES005 Weld Bead TTC Milano, 2011 10/11/2018 C Cooper

Location of Centrifugal Barrel Polisher – IB4 Industrial Center Building CDF Industrial Building #4 (ICPA) TTC Milano, 2011 10/11/2018 C Cooper

General Layout of Integrated Cavity Processing Apparatus & CBP Electropolishing Tool & Associated Equipment Centrifugal Barrel Polishing High Pressure Rinse & Clean Assembly Area 1000 C Vacuum Furnace N TTC Milano, 2011 10/11/2018 C Cooper

Centrifugal Barrel Polisher & Rinse Station Processed so far: Two 9- Cell Tesla Type Cavities Eight 1-Cell Tesla Type Cavities Two 1-Cell 3.9 GHz Cavities Currently Processing: 2 9-Cell Tesla Type Cavities Concurrently Probably Next for Processing: 4 9-Cell Tesla Type Cavities with Pits 1 Single-Cell Tesla Type Cavity 2 Coupon Cavities & hopefully 1 re-entrant cavity TTC Milano, 2011 10/11/2018 C Cooper

Cavity Preparation TTC Milano, 2011 10/11/2018

9 Cell Cavity Tumbling HOM Can Must Be Protected or the Antenna Would be Destroyed. Caps are Made From Niobium to Avoid Contamination. TTC Milano, 2011 10/11/2018 C Cooper

Current Media Step 1 Step 2 Step 3 Step 4 Step 5 Cutting, Time as needed Step 2 Intermediate Polishing, 12 hours Step 3 Intermediate Polishing, 15 hours Step 4 Intermediate Polishing, 20 hours Step 5 Final Polishing, 40 hours + Soap & Ultrapure Water + Soap & Ultrapure Water Water + 400 Mesh Alumina Water + 800 Mesh Alumina Removal Rate – 11 um / hr Removal Rate – 3 um / hr Removal rate of final 3 steps is hard to measure, but not nearly as much as 1st 2 steps TTC Milano, 2011 10/11/2018 C Cooper

Results- Mirror Like Surface Single Cell Polished to Mirror Finish Ra = 0.0139 µm +/- 0.00216 µm Rz = 0.139 µm +/- 0.0242 µm Typical finish achieved by fine polishing. Notice reflection of graph paper and writing TTC Milano, 2011 10/11/2018 C Cooper

Results – ACC001 After CBP & 40 Micron EP EP Alone ACC001 Quality Factor Gradient, MV/m First cavity processed with colloidal silica tested worse that processing by EP because the first polishing step was 5 hours instead of 12, leaving imbedded media in the cavity ACC001 - Magnified TTC Milano, 2011 10/11/2018 C Cooper

Results AES005 ACC001 - 40 Micron EP AES005 After CBP Quality Factor AES001 – 10 Micron EP Gradient, MV/m It is probable that the contamination layer is more than 10 microns deep and more EP is needed for AES005. TTC Milano, 2011 10/11/2018 C Cooper AES005 After 10 Microns EP

Results – Pit Repair Before CBP After CBP and 40 microns Ep Had a large (~200micron) pit in cell 3 – previously processed and tested at JLab to 19 MV/m TTC Milano, 2011 10/11/2018 C Cooper

Results - Single Cell Cavity ACC004 TTC Milano, 2011 10/11/2018 C Cooper

Results - Single Cell Cavity NR6 Red Trend is NR6 CBPed with 40 micron EP Green Trend is NR6 BCPed Blue Trend is ACC004 NR6 and ACC004 have similar Q vs. E trends until 30 MV/m and were processed with completely different medias. NR6 was tested after tumbling and reached as high as any of the other 6 single cell cavities from Niowave/Roark from that lot. Weld bead was successfully removed but surface shows general pitting after processing. TTC Milano, 2011 10/11/2018 C Cooper

Results RRCAT2 Single Cell Performance Blue – Tumbling Red - EP Irregular weld Voids in weld by x-ray After Processing Still Large Areas of Weld Bead Not Removed TTC Milano, 2011 10/11/2018 C Cooper

Conclusions & Future Plans Preliminary R&D on CBP has identified a process that can yield mirror like finishes Between 40 and 20 microns of material still need to be removed by chemistry. Further work need to be done to perfect the CBP procedure. Future Plans Use coupon cavity to fine tune CBP process. Hopefully process re-entrant cavity to mirror finish in collaboration with Cornell. Correlate Ra to cavity performance. Evaluate amount of chemistry needed after CBP. Prepare single cell cavities for thin film studies. Examine processing 650MHz cavities TTC Milano, 2011 10/11/2018 C Cooper

Future Plans - Coupon Cavity With the use of coupon cavities perfect process. Use Surface Profilometry and SEM/EDS to determine the average surface roughness and chemical contamination present after each step. TTC Milano, 2011 10/11/2018 C Cooper

Acknowledgements Cavity Testing Centrifugal Barrel Polishing Operation Joe Ozelis Centrifugal Barrel Polishing Operation Dave Burk George Steuer Baseline Cavity Processing Brent Stone Jim Folkie Damon Bice Optical Inspection Evgeny Toropov Dmitri Sergatskov Kenji Saito for communications and information about the CBP process. Camille Ginsburg for help in general. TTC Milano, 2011 10/11/2018 C Cooper