Step-by-step assembly instructions

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Step-by-step assembly instructions
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Click on this image to open the full PDF document.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Fluid Power Challenge: Workshop Day
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Tiffany Victorian assembly instructions By Laser Dollhouse Designs.
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
Pneumatic Clamp Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Fluid Power Challenge: Workshop Day PRESENTERS:. Fluid Power Workshop Day INSERT DATE HERE Fluid Power Challenge Day INSERT DATE HERE Discovering Fluid.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
Day and Night by M.C. Escher
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Step-by-step assembly instructions
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Investigating Fluid Power Rig Operating instructions (c) 2012 Mechanical Kits Ltd.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
Up and Over Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
What’s in the Box?
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Build A Motor You must follow the directions step-by-step!
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Fluid Power Challenge: Workshop Day
Fluid Power Challenge Introduction & Hints
25th Annual 7th and 8th Grade Battery Car Challenge
Investigating Fluid Power Rig
Hand-cranked Windmill Assembly Instructions
Workshop Rotating Platform
Workshop Rotating Platform
Step-by-step assembly instructions
Workshop Rotating Platform
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hot-Air Balloons.
Origami & Kirigami “3-D Tactile Geometry”.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Workshop Rotating Platform
Crumble PowerPoint 4.
Assembly instructions for M-K all bolt together hoppercone kit.
Mitsy Kit Instructions and Tips
Step-by-step assembly instructions
Step-by-step assembly instructions
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Step-by-Step Assembly Instructions – Cube Version
What’s in the Box?
Rocket Stability Building a Test Rocket LabRat Scientific © 2018.
Step-by-step assembly instructions
Step-by-step assembly instructions
Building an Experiment Cart
Building a Tissue Paper Hot Air Balloon
Presentation transcript:

Step-by-step assembly instructions Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association

Contents of the Lifter Kit Wooden pieces (⅜” cross-section): 8 X 3⅝”; 4 X 3¼”; 4 X 8”; 2 X 3¼”; 2 X 1½”; 3 X 1” Green corner gussets: 2 cards Syringes, 20cc: 2 (1 has a hole in the plunger) Plastic Tubing: 1 length Wooden dowel, 3/16” diam.: 2 X 5”; 1 X 3” Axle Holders: 16 Syringe Holder: 1 Mini-washers: 8 Stirring Sticks: 2 Plus a small piece of sandpaper (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association First, make a cube 4”³ To make a 4”cube you will need 8 X 3⅝” pieces and 4 X 3¼’ pieces. First make two squares using 4 X 3⅝” pieces for each. These images show the steps involved in making the cube. See next slide. Glue corners on one (1) side only (c) 2010 National Fluid Power Association

Just in case you need help making the cube (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Add 4 X 3¼” pieces as uprights. Notice how a “double-sized” green triangle is used to secure the corners Double-sized green gussets (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Add to the cube to make the structure for the Lifter. Glue two 8” pieces to one side of the cube. Reinforce by gluing two strips 4” X ¾” on the side – cut these from the green card (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue two 3¼” pieces between the 8” uprights and reinforce with four green gussets or triangles (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue an axle holder onto the outside of the top of the cube as shown. Mark the center of the axle holder and mark 2½” from the edge furthest from the uprights. Glue the axle holder into position checking it is horizontal and parallel to the 3¼” piece you glued in last  2½”  (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue two more axle holders on the inside edges to reinforce. Make sure the holes line up (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue an axle holder onto the outside of so that the centre of the hole is 1 ½” from the top of the upright and the hole points towards the cube. Once horizontal and perpendicular to the uprights glue two more axle holders on the inside (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue together three 1” pieces using glue between the pieces. Glue two axle holders to opposite sides and trim. This is the platform that will hold the acting syringe. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Cut out a rectangular piece from the green card and glue to the base of the platform (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Once everything is dry, test in the structure using the 5”axle and ensure smooth rotations (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Make the arm by connecting two 8” pieces and two 1 ½” pieces. Use 8 corner gussets – four on each side. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association On this 8” by 2 ¼” frame glue an axle holder in place so that its smallest angle touches the corner of the frame. Use a 5” axle to align and glue another axle holder on the outside of the opposite side. Test that the 5”axle sits across the frame parallel to the shortest end (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Glue another axle holder in place so that its smallest angle touches the other smallest angle of the first axle holder glued to the frame. In the same way and using the 3” axle, align and glue in place another axle holder on the outside of the opposite side. Follow by aligning and gluing in place two more axle holders on the inside of the frame. The four axle holders must allow for a smooth rotation by the 3 “axle. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association There are a number of steps in assembling the mechanism. The first is to identify the syringe that has a hole drilled in its plunger. The 3” axle fits through this hole and should turn in it. The axle and plunger fit between the double axle holders on the 8” arm and the outside, protruding, axle is secured using a mini-washer on each end. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Strip the backing from the white piston syringe holder and press it firmly onto the green card on the platform (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Place the barrel of the syringe into the clip so that the clip aligns with the ’15’ mark or thereabouts. Be careful to orientate the barrel as shown (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Mount the syringe platform onto the structure so the lip points toward the 8” uprights and the barrel is above the axle. Secure with four mini-washers, two securing the syringe platform and two securing the axle ends on the outside of the structure. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association Carefully insert the plunger into the barrel of the syringe until the holes at the end align with the holes in the axle holders glued to the 8” uprights on the structure. Once aligned, carefully insert the axle through all six holes. The axle is secured with a mini-washer at each end. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association To operate the mechanism attach the length of plastic tubing to the end of the acting syringe that is now housed in the structure. The other syringe should be fully extended before it is connected to the other end of the tubing. Gently push the plunger down. This syringe drives the acting syringe. (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association LIFTER - open (c) 2010 National Fluid Power Association

(c) 2010 National Fluid Power Association LIFTER - closed (c) 2010 National Fluid Power Association