Buy American and the American Recovery and Reinvestment Act of 2009 (ARRA)

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

1eere.energy.gov Recovery Act Buy American Overview Benjamin Goldstein Buy American Coordinator for EERE Andrea Poniecki (202)
Buy American Waivers David Chin & Katie Connors. Dollars in Thousands Total: $7.2 Billion EPAs Stimulus Investments (Nationally)
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
FHWA Construction Updates David D. Platz, PE, PTOE Construction and Contract Administration Engineer US DOT - FHWA Wisconsin Division, Madison, WI FHWA.
Contract and Grant Provisions and Administration Section 105 (Page 30) Title I The Act.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
OMB Circular A133 Audits of States, Local Governments, and Non-Profit Organizations 1 Departmental Research Administrators Training Track.
Session 8 Implementing PPPs
Presented by: Kathryn Hodges, NH
1 Guidance for the American Recovery and Reinvestment Act of 2009 By David G. Bullock, Partner Macias Gini & O’Connell LLP.
LOCAL REVOLVING LOAN FUND (RLF). Page 2 Local Revolving Loan Funds Indications that HUD and GAO will heavily monitor and audit the RLF activities HUD.
Section 3 Steed Robinson – Office of Community Development  9/4/2014.
Section 1201c Reporting: Training Webinars for FTA Grant Recipients February 2, 3, and 5, 2010.
Marcy Mealy Procurement Specialist CDBG Program
Department of Transportation Support Services Branch ODOT Procurement Office Intergovernmental Agreements 455 Airport Rd. SE, Bldg K Salem, OR
OVERSIGHT & COMPLIANCE BRANCH (OCB) INVOICE PAYMENTS February 16,
Circular A-110 Everything You Didn’t Want to Know.
DIVISION OF RESEARCH Utilization of Minority-Owned and Women- Owned Business Enterprises in EPA Sponsored Projects Fall 2009 Kimberly Klatt Research Compliance.
ISO 9001 Interpretation : Exclusions
Washington Metropolitan Area District Office SBA.
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
ARRA Grants & Procurements American Recovery Reinvestment Act Training.
Statutory Violations Identification Procedure Avoidance CCIT Presentation – July 20, 2011 (rev 3/17/14)
U.S. Small Business Administration
Overall Considerations
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
2014 CDBG Applicants' Workshop Section 3 Overview (see also DCA Policy– Appendix R)
1 Amy Williams, Senior Procurement Analyst February 5, 2008 Defense Acquisition Regulations System
FAR Part 2 Definitions of Words and Terms. FAR Scope of part (a)This part – (1) Defines words and terms that are frequently used in the FAR; (2)
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
Big “A” Acquisition Conference May 4-5, 2011
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Buy American Provisions of ARRA 2009 State CDBG Recipients Workshop.
Buy American Trying to Make Sense out of the ARRA Buy American Requirement.
FAR Part 31 Contract Cost Principles and Procedures.
Don Mansfield Professor of Contract Management Defense Acquisition University.
FAR Part 10 Market Research. FAR Part 10 - Prescribes policies and procedures for conducting Market Research.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
By Rachel Coleman.  “ The head of any federal agency having direct or indirect jurisdiction over a proposed federal or federally assisted undertaking.
1 The American Recovery and Reinvestment Act of 2009 (ARRA) California Department of Public Health Safe Drinking Water State Revolving Fund.
The Administration’s Small Business Agenda Contract Bundling: A Strategy for Increasing Federal Contracting Opportunities for Small Business.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
1 Amy Williams, Senior Procurement Analyst Friday, October 26, 2007 Defense Acquisition Regulations System
Animal Raising Claims in the Labeling of Meat and Poultry Products October 14, 2008 United States Department of Agriculture Food Safety and Inspection.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
Small Purchase of Professional Service Providers Administrative Rule R
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
UNDERSTANDING THE BUY AMERICAN PROVISION for PROCUREMENT Ronna SeGraves, MS, RD, LD May 2016.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
General Operations Limitation on Use of Funds Termination of Assistance Other Program Requirements.
Sub-recipient Monitoring and Contractor Determination
Final Rule for Preventive Controls for Human Food
FAR Part 2 - Definitions of Words and Terms
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
The Administration’s Small Business Agenda
Cost or pricing data John Cancellara 7 March 2018.
Virtual Network Meeting: Consolidated Application
Demystifying Article 15A – MWBE Requirements
Presentation Title Goes Here
Equitable Services Sections 1117 and 8501 of the Elementary and Secondary Education Act (ESEA), as amended by the Every Student Succeeds Act (ESSA),
Working Session on American Iron and Steel (AIS) Requirements for the Clean Water and Drinking Water State Revolving Funds WWEMA 109th Annual Meeting.
Implementing Equitable Services Requirements
Buy America and Utility Work
Implementing the MWBE Program for the Aviation Capital Grant Program
Presentation transcript:

Buy American and the American Recovery and Reinvestment Act of 2009 (ARRA)

Buy American Requirement Section 1605(a) of ARRA requires assistance recipients to use domestic iron, steel, and manufactured goods that are produced in the US. This is the expected means of compliance. Section 1605(b) provides for a waiver of this requirement under circumstances identified and limited in that provision Section 1605(d) provides that this requirement must be implemented consistent with US obligations under international agreements

SRF Assistance Recipients Should Seek First to Comply with §1605(a) Must in good faith (where applicable, design the project and) solicit bids for construction with American made iron, steel, and manufactured goods (I/S/MG) Should include ARRAs Buy American terms in any RFPs or bid solicitations

Recipients comply with Buy American a number of ways Exclusively procure iron, steel, and manufactured goods that meet the definition of being manufactured in the United States (This is the presumed pathway of compliance) Any non-domestically manufactured items are covered by a categorical (national) waiver Project specific waiver for any non domestically manufactured items not covered by a categorical (national) waiver

Waiver Determination Agency head may provide a waiver if finds that: Applying Buy American is inconsistent with public interest (§1605(b)(1)) US iron, steel, and manufactured goods are not produced in sufficient and reasonably available quantities or of satisfactory quality (§1605(b)(2)) Inclusion of US iron, steel, and manufactured goods will increase cost of overall project by > 25% (§1605(b)(3))

National Waivers

Refinancing Waiver Basis: Public Interest For projects with debt obligations incurred on or after October 1, 2008 and prior to February 17, 2009 that are refinanced by the SRF using ARRA funds Justified by specific ARRA provision that makes eligible projects initially financed within an in anticipation of ARRA window

Refinancing Waiver Congressionally-defined window: On or after Oct. 1 = in anticipation of ARRA Prior to Feb. 17 = in good faith and without fair notice as to the existence and statutory scope of any Buy American requirement To qualify, must have debt obligations … incurred within the window Does not include self-financing or incurring costs alone Might include certain other types of funding agreements if the commitments of both parties are tantamount to a debt obligation incurred

Bid Waiver Basis: Public Interest For projects that solicited bids on or after October 1, 2008 and prior to February 17, 2009 To have waiver cover a project, potential assistance recipients must also show verifiable basis on which they believed it was reasonable and prudent to solicit bids for these projects Verifiable basis must show solicitation undertaken in specific anticipation of timely funding (from ARRA or other source)

Bid Waiver Rationale for applying both ends of ARRA window is the same as with refinancing Begins when bid solicitations can properly be considered in anticipation of ARRA Limited to time before ARRA signing gave fair notice as to Buy American requirement This waiver does not apply to projects that solicited bids after ARRA signing on Feb. 17 Waiver is intended to recognize appropriateness of proactive steps States took to encourage SRF projects readiness for expeditious construction

De Minimis Waiver Basis: Public Interest For de minimis incidental components of projects, where they comprise no more than 5 percent of the total cost of the materials used in and incorporated into a project 5% of total materials cost determined from research conducted by EPA

De Minimis Waiver Assistance recipients would determine and retain relevant documentation Assistance recipients would include in reports to the State: Types/categories of items to which this waiver is applied total cost for each type/category calculations of the total cost of materials used to determine the dollar value of goods to which they have applied the waiver

If ARRA-Funded Project Is Covered By Categorical Waiver No need to apply for an individual waiver Documentation that a project is covered by a categorical waiver MUST include all elements required by the waiver Maintain documents in project files

Project Waivers

Many waiver applications may be based on Availability considerations U.S. iron, steel, and manufactured goods are not produced in sufficient and reasonably available quantities or of satisfactory quality (§1605(b)(2)) – The Agencys April 28, 2009 memorandum defines reasonably available quantity as: Quantity will be available at the time needed and place needed, and in the proper form or specification as specified in the project plans and design.

Basis on which an recipient could apply for an Availability waiver A Recipient May Apply to EPA for a Waiver from the Buy American Requirements on the basis of Availability if, based upon the responses to a bid solicitation, the Assistance Agreement Recipient has determined that: Only Non-U.S. Manufactured – Iron – Steel or – Manufactured Good(s) Meet the Project Specifications (e.g.): – Performance – Physical Characteristics – Timeliness of Delivery

What is a Manufactured Good? A good brought to the construction site for incorporation into the building or work that has been processed into a specific form and shape, or combined with other raw material to create a material that has different properties than the properties of the individual raw materials There is no requirement with regard to the origin of components or subcomponents in manufactured goods used in the project, as long as the manufacturing occurs in the United States. ~OMB Guidance [§ , (a)(2)(ii)]

Substantial Transformation Defined In the case of a manufactured good that consists in whole or in part of materials from another country, has been substantially transformed in the United States into a new and different manufactured good distinct from the materials from which it was transformed. This OMB Guidance term [§ ] for international agreements applies to few SRF recipients EPA believes it provides important guidance on this issue, rooted in well-established legal interpretations

The Substantial Transformation Analysis Determination of whether substantial transformation has occurred is always case-by- case under questions/criteria No good satisfies substantial transformation test by … having merely undergone [a] simple combining or packaging operation. Assembly operations which are minimal or simple, as opposed to complex or meaningful, will generally not result in a substantial transformation.

Can Substantial Transformation Occur On-site? OMB manufactured good definition: a good brought to the construction site suggests that only construction occurs onsite, and test is as to origin of goods as they arrive onsite However, established interpretations of substantial transformation test provide that manufacturing occurs in the U.S. wherever the test is met in the U.S. Can reconcile these by maintaining the distinctions made in each test

Substantial Transformation May Occur On-site IF… Manufacturer brings all components of the good to the site and always does so in normal course of business Ensures that this is not an attempt to game BA rules Manufacturer does all the work onsite May use sub for this only if manufacturer does so already in the normal course of business Case is strongest if the transformative work must be done onsite (e.g., work includes adjustments, calibration, etc required to meet performance spec)

Applying Substantial Transformation Analysis: Assistance Recipients Role SRF assistance recipients are responsible to comply with §1605 (applies to project) Statutory expectation is that recipients will Buy American (§1605(a)) to comply – in OMB Guidance, waivers are exceptions Recipients, in conjunction with consultants, contractors, and others, are responsible to decide if products are US-made per §1605(a)

Applying Substantial Transformation Analysis: EPA Role EPA does not make substantial transformation (ST) or US/foreign origin determinations EPA §1605 role is to review waiver requests when recipient believes it cannot comply by buying US-made good, and do compliance oversight

State Buy American Role Ensure recipients have adequate documentation in project files to demonstrate all applicable means of BA compliance For US-made goods: verification of US production (as stated in sample certification point 2 in EPA 4/28/09 BA memo) For items covered by a categorical (e.g., nationwide) waiver: the documentation must include all elements specified in and required by the waiver for an item or project to be covered For any component that has been granted a waiver: FR notice of project specific waiver

If 1,2 or 3 is "yes" then ST has occurred Questions for Determining Whether Substantial Transformation Has Occurred in the US QuestionYesNo 1. Were all of the components of the manufactured good manufactured in the United States, and were all of the components assembled into the final product in the US? (If the answer is yes, then this is clearly manufactured in the US, and the inquiry is complete) 2. Was there a change in character or use of the good or the components in America? (These questions are asked about the finished good as a whole, not about each individual component) [Questions 2.a., 2.b., and 2.c. shown on next slide] 3. Was(/were) the process(es) performed in the US (including but not limited to assembly) complex and meaningful? [Questions 3.a., 3.b., 3.c., 3.d, and 3.e. shown on later slide]

If a, b or c is "yes", then ST has occurred To Answer Question 2, Ask the Following: QuestionYesNo 2. Was there a change in character or use of the good or the components in America? (These questions are asked about the finished good as a whole, not about each individual component) a. Was there a change in the physical and/or chemical properties or characteristics designed to alter the functionality of the good? b. Did the manufacturing or processing operation result in a change of a product(s) with one use into a product with a different use? c. Did the manufacturing or processing operation result in the narrowing of the range of possible uses of a multi-use product?

If at least 2 answers are "yes", then ST occurred To Answer Question 3, Ask the Following: QuestionYesNo 3. Was(/were) the process(es) performed in the US (including but not limited to assembly) complex and meaningful? a. Did the process(es) take a substantial amount of time? b. Was(/were) the process(es) costly? c. Did the process(es) require particular high level skills? d. Did the process(es) require a number of different operations? e. Was substantial value added in the process(es)?

NOT Substantial Transformation Cosmetic or surface changes (e.g., painting, lacquering, or cleaning) Simply cutting a material to length or width (e.g., cutting steel pipe to particular length) If all pieces are shipped by one company with the intent of providing all components necessary to be assembled into a functional good (e.g., pump station)

Availability Waivers What if a good is produced by both US and non-US manufacturers, but the assistance recipient has reason for concern that the US-produced good may not be available in a sufficient quantity and in a timely manner as to meet the expeditious construction and other timing requirements of ARRA? Availability waivers can be justified if assistance recipient provides adequate documentation of: Good-faith efforts to seek and inability to obtain firm and satisfactory commitment by any US producer to deliver a sufficient quantity of the good in a timely manner as specified in construction documents for project Firm and satisfactory commitment by a non-US producer for timely delivery of a sufficient quantity

Limited US Sourcing Issues & Availability Waivers A large number of manufactured goods are needed for any ARRA funded SRF project These goods differ greatly in the: Extent to which they are US-manufactured, and Presence or absence of competition as among US producers ARRA requirements Contract or construction provision makes timing crucial To complete construction expeditiously to create economic stimulus (Sec. 1602) These requirements properly enable assistance recipients to demand timely delivery, as essential feature of availability

Limited US Sourcing Issues & Availability Waivers Buy American provisions may properly increase demand for goods manufactured by domestic monopoly producers with a relatively small share of the current US market, as no waiver is required for their use EPA expects that access to availability waivers will minimize potential for monopolistic or unfair trade practices by balancing this against ARRAs clear imperative for expeditious construction This balanced approach offers US producers a fair opportunity for a realistic, timely increase in production, while enabling assistance recipients and contractors to obtain necessary goods for construction within ARRAs expeditious time frames

Buy American Waiver Process SRF assistance recipient (or State on recipients behalf) requests waiver State SRF Program may participate in preparation or review of requests 5-Step process for reviewing individual case waivers (where approved) 1.Once Region finds request package is complete, initial technical review by contractor/evaluation by Regional office 2.Coordination with Cross-Agency Working Group 3.OARM Concurrence (after RA tentative approval) 4.Signature by Regional Administrator 5.Publication in Federal Register

How to submit a request Waiver applicants should submit requests accompanied by all necessary documentation to their Regional EPA Office Via Formal review period starts once EPA finds request package is complete

Questions? Sheryl Parsons, SRF Coordinator