Westar Energy Transmission Operations: An Update on Regional and Local Transmission Activity June 22, 2010 Presented to Attendees of Westars Transmission.
Advertisements

10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
The Midwest ISO from a Transmission Owner Perspective.
Business Practices Subcommittee Update August 17, 2010.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
STATUS UPDATE 3/12/2010 Proposed Changes to RCM. Goals Align RCM incentives with institutional goals Identify source of central strategic funds Simplify.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
SPP.org 11. SPP Delivery Point Addition (DPA) Process Effective May 1, 2010.
Highway-Byway Cost Allocation: What it Offers MISO January 2010 Presented to the Organization of MISO States CARP and the Midwest ISO RECB Task Force Meeting.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
The Transmission Imperative November 3, 2011 Jay Caspary.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Entergy Arkansas, Inc. Transition Plan Technical Conference #2 July 15, 2010.
OSC Meeting April 27, Transmission Cost Allocation Overview.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
1 Westar Energy’s 2013 Annual Transmission Revenue Requirement Meeting October 30, 2012.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
Updated 1/28/2011.
Cost Allocation Proposals associated with MISO Transmission Expansion WIEG Board Meeting May 6, 2010 WIEG Board Meeting May 6, 2010 Presented by: Kavita.
Standards Review Subcommittee Update August 17, 2010.
Tariff Change Recommendations to the Commercial Practices Committee From the Regional Tariff Working Group April 9, 2001.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
Cost Allocation for 2009 STEP, Appendix B: Comparison of Highway/Byway/Local v. Currently Effective Cost Allocation Methods 1/21/2010.
Generator Prioritization Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
1 Entergy Transmission Planning Summit Transmission Planning Process Doug Powell New Orleans, LA July 8, 2004.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
1.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
Rate Design Proposal for SPP: Integrated Transmission Plan and Priority Projects Mike Proctor CAWG May 27, 2009.
Tariff Changes Proposed by Integrated System (IS) 2/20/2014 Carl A. Monroe EXEC VP & COO.
Parking Lot Item 19. BPS Bert Bressers 10/31/2011 Firm rights of resources that have a Firm priority to what load (Sink area granularity)
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
FERC Order 1000 Transmission Planning and Cost Allocation Key Points of Seminole Electric Cooperative, Inc.’s Proposal FRCC Regional Stakeholder Meeting.
1 Westar Energy’s 2012 Annual Transmission Revenue Requirement Meeting October 25, 2011.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
2016 Annual Attachment O Stakeholder Meeting Ameren Missouri
Kenneth Silver Los Angeles Department of Water & Power
Mountain West Transmission Group
Barrilla Junction Area Transmission Improvements Project
TAC Report to the ERCOT Board
Hurricane Rita.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Clarification of the Resident Load Definition
Location, Location, Location
Pseudo-tie business procedure
PRC-006-RFC-01 Automatic Under Frequency Load Shedding Requirements
Rates & Regulatory Updates
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Westar Formula Rate and your bill
FERC NOI on Incentive Rates
2014 Annual Attachment O Stakeholder Meeting Ameren Missouri
Transmission Pricing & Regional Electric Markets
Mountain West Transmission Group Panel Discussion
CAWG Teleconference – January 5, 2011
Standards Review Subcommittee Update
Pseudo-tie business procedure
Offshore Wind Transmission:
Presentation transcript:

T.O. Highway/Byway Recommendations Dennis Reed, Westar Jake Langthorn, OG&E May 21, 2009 11/10/2018

Disclaimer Prepared for the May 27, 2009 CAWG meeting Not vetted with full TO group Does not necessarily represent the views of all TOs 11/10/2018

Current OATT Has 3 buckets of cost recovery Regional Zonal Direct Assigned All Methods of Cost recovery use these 3 buckets Base Plan Funding can use all three. 11/10/2018

Existing Cost Recovery Facilities built prior to 2006 : 100% Zonal Transmission upgrades built on or after Jan 1, 2006 Reliability Upgrades: BPF-33% Regional, 67% Zonal Zonal Reliability Upgrades: 100% Zonal Upgrades for Service Requests: Default to direct assigned, but can qualify for BPF Special allocation for upgrades related to wind generators Upgrades for Generation Interconnection: Direct Assigned to Generator Economic Upgrades: Direct assigned to Sponsor unless part of a Balanced Portfolio, then 100% Regional 11/10/2018

Highway/Byway Structure Highway: Regional Cost Recovery 345kV and above Byway: Zonal Cost Recovery 100 kV and below Outstanding question: What to do with the facilities between 100 kV and 345 kV? There are multiple ties between various B.A.s and Pricing Zones inside SPP at 115 kV, 138 kV and 230 kV. Do we allocate the facilities by function? only put tie facilities into the highway Bright line at some other level? Some other methodology? 11/10/2018

Allocating Costs For New Upgrades Existing Facilities All facilities as of a set point in time Cost allocations for those facilities will remain the same New Facilities Modify BPF to HWBW: Eliminate the 1/3, 2/3 split and allocate upgrade cost either to Highway or Byway depending on criteria Maintain Safe Harbor limits Direct assign costs in excess of Safe Harbor 11/10/2018

Allocation of Cost of New Upgrades ITP Upgrades NERC Reliability: HWBW Service Upgrades: Direct Assigned unless for DR, then HWBW with Safe Harbor [see next slide] Economic: HWBW Question: Do we keep the Balanced Portfolio or does this type of upgrade go away? Zonal Reliability: Byway Generation Interconnection Interconnection Facilities: Direct Assigned Other network upgrades? Can be addressed in ITP process Requested Upgrades: Sponsored or Direct Assigned unless incorporated with the ITP upgrades 11/10/2018

Service Upgrades PTP Requests NITS Requests Costs direct assigned to customer If Request is for a new Designated Resource serving load in the SPP: HWBW NITS Requests Upgrades in host zone: HWBW Upgrades in other zones: If Highway – Goes to Highway If Zonal, gets Direct assigned to NITS customer (“and” pricing) Related to a new DR (w/safe harbor): HWBW 11/10/2018

Other Related Issues Through and Out Rates PtP revenue allocation Go to System Average Rate? PtP revenue allocation Maintain allocation of revenues to TOs or try and split the revenue between customers and TOs Existing Facilities Do we maintain the current cost allocation forever? Or, do we transition to HWBW rates? Transition period to new Cost Allocation Going to HWBW FERC position regarding existing facilities?? May have an opinion. 11/10/2018

Why this approach? Simplifies the accounting for both TOs and SPP May Minimize Regulatory Concern Minimizes Changes to the Tariff Leaves in place most of the compromises made over the past 10 years on certain issues Quicker to implement and probably get through FERC Minimizes Rate impacts to customers 11/10/2018

Schedule MAKE THE OCT 27 DATE!!! 11/10/2018