Pinole-Hercules Water Pollution Control Plant Upgrade Project

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Visalia WCP Trickling Filter Upgrade Project 1994/1995 Trickling Filters, Pump Station and Flow Control Box Modifications.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
Capital Improvement Program City of Snoqualmie Public Works Department.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Eura DeHart Environmental Scientist Sewage Sludge Hauling Registration and Reporting Requirements.
Results of BOC’s Fog (Fats,Oils,Grease) Reduction Program at a WWTP-62 MGD (234,696 m 3 /Day)
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Presentation Overview
Muon Campus AIP Review MC-1 Building GPP Update Russ Alber FESS Engineering January 23, 2013.
Wastewater Treatment & Collection System Improvements.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
Construction OF AMMONIA REMOVAL UPGRADES FOR FIRST BROAD RIVER WWTP
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
NYWEA ENERGY SPECIALTY CONFERENCE November 20, 2014 Towards Net-Zero Energy in Wastewater Treatment Demonstration of ClearCove’s Enhanced Primary Treatment.
Waste Water Treatment Denis MOTA. Overview Waste water Treatment Treatment in LYON  Pierre Bénite.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Wastewater Department Staff Report Gravity Thickener and pumps  Replacement of both thickener pumps, valves, controls, grinder and electrical system.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Water and Waste Department 2016 CAPITAL WORKS CONSTRUCTION PROGRAM Presentation to Manitoba Heavy Construction Association April 20,
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Environmental Protection Division January 29, 2013 BCC Public Hearing Solid Waste Management Facility Permit Renewal Request Hubbard Construction Company.
Welcome to American-Bath Wastewater Treatment Plant.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
WATER – WASTEWATER TREATMENT EXPERIENCE
TVRWRF 23 MGD Expansion Disinfection System Conversion
WATER – WASTEWATER TREATMENT EXPERIENCE
Filter Rehabilitation and Seismic Upgrades – Construction Update
Bond Oversight Committee
Sun City Lift Station Odor Control Improvements
Hays County Commissioners Court
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
San Luis Potosi – New plant April 24th 2015
Optimising Sludge Dewatering – Benefits from Shared Water Services
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Wastewater Facilities Upgrade Project
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
SBSA.
Harbour Island Force Main Replacement
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
The Project Overview and Status Report
Presentation transcript:

Pinole-Hercules Water Pollution Control Plant Upgrade Project Update to Pinole-Hercules Wastewater Subcommittee March 2, 2017 Pinole-Hercules Water Pollution Control Plant Upgrade Project

Headworks and Grit Removal The base and walls of the new headworks structure have been poured and the synthetic coating is being installed and sealed. The grit structure base is completed and the wall elevations are being formed and poured. Work for these structures is 32% complete

Influent Pipe The influent sewer from both Pinole and Hercules have been excavated and are under construction.

Electrical Work in Progress The Electrical building slab has been poured and is ready for masonry wall construction to begin

The solids handling facilities The walls for the new solids handing building and sludge thickener are now being constructed.

Site prior to start of construction

Project south end in February 2017 Influent sewer New electrical building Grit structure Headworks structure

Project north end in February 2017 Solids handling facility Gravity sludge thickener

Original schedule and cost breakdown Substantial Completion Final Completion

Progress/Payments Billings for Work through January 2017 total $10,409,656

Baseline Overview of Schedule Work Activities Pre-construction Construction Permits Headworks and Solids Handling Secondary Treatment Secondary Clarifier 1 and Chlorine Contact Basin Facility Start-up Submit Shutdown Requests Civil/Site Work, Yard pipe, Ductbank Temporary Bypass Piping and Pumping Temporary Bypass Piping and Pumping Testing and Commissioning Prepare Submittals Headworks and Grit Facilities Aeration Basins Yard Piping and Ductbanks Demobilization period Submittal Review and Approval Primary Clarifiers 1 & 2 RAS/WAS Pumping Station Chlorine Contact Basin Material Fabrication and Delivery Electrical Building Secondary Clarifier 2 Public Works Building Outfall Pipeline Blower Building Sodium Hydroxide Area Influent Sewer Primary Clarifier 3 Digester Gas Burner Solids Handling Facility Maintenance Building Secondary Clarifier 1 Testing and Commissioning Testing and Commissioning Miscellaneous site work

Current Status of Work Activities Pre-construction Construction Permits Headworks and Solids Handling Secondary Treatment Secondary Clarifier 1 and Chlorine Contact Basin Facility Start-up Submit Shutdown Requests Civil/Site Work, Yard pipe, Ductbank Temporary Bypass Piping and Pumping Temporary Bypass Piping and Pumping Testing and Commissioning Prepare Submittals Headworks and Grit Facilities Aeration Basins Yard Piping and Ductbanks Demobilization period Submittal Review and Approval Electrical Building RAS/WAS Pumping Station Chlorine Contact Basin Material Fabrication and Delivery Outfall Pipeline Secondary Clarifier 2 Public Works Building Influent Sewer Blower Building Sodium Hydroxide Area Solids Handling Facility Primary Clarifier 3 Digester Gas Burner Work in Progress Primary Clarifiers 1 & 2 Completed Testing and Commissioning Maintenance Building Secondary Clarifier 1 Testing and Commissioning Miscellaneous site work

Change Orders Executed To Date Number Subject Cost 1 Temporary Public Restrooms and Wash Station during construction $ 21,271.00 2 New AC Road along the Northeast Side of the Plant for Continued County Access $ 32,363.00 3 Credit for Deleting Two Duck Bill Check Valves at Aeration Basins $(12,018.00) 4 Revised Davis Bacon wage determination $ 0.00 5 Concrete Scanning for Existing Primary Clarifiers $ 2,320.00 6 Headworks - Concrete Fillets and Fills Modifications $ 22,893.60 7 RTU Modifications to Control Plant Instrumentation $ 21,621.00 8 Replace Carbon Steel Low Pressure Air Piping with Stainless Steel $ 77,431.00 9 Install Polymer System Progressive Cavity Pumps in-Lieu of Specified Peristaltic Pumps $ 3,299.00 10 Relocate Headworks and Ferric Chloride Storage Facilities 11 Re-route natural gas line around MH-1 $ (1,705.00) TOTAL CHANGE ORDERS TO DATE $167,475.60 Executed change orders total 1.6 percent of work completed to date

Potential Change Order Requests Currently In Review Number Subject 1 Demolish and Replace Approximately 50 feet of Existing Asbestos Cement 24-inch Effluent line 2 Reroute Existing Utilities at Surge Tank 3 Remove and Dispose Asbestos Cement Pipe at Mixed Liquor Flow Split Box Area 4 Add Electric Hoist at Influent Pumps 5 Credit for Deletion of Headworks Water Stop and Influent Pump Pads 6 Credit for Deletion of Grit Handling Water Stop 7 Influent pump piping and hatch modifications 8 Credit for switch from precision cut to split face block on building 9 Guard rail modifications at headworks and aeration basin 10 Electrical conduit and wire modifications

Schedule Actual Notice to Proceed Substantial Completion Date May 11, 2016 Substantial Completion Date October 28, 2018 Final Completion Date December 26, 2018