NE Region Annual Utility Conference January 23, 2014 Kirk Fredrichs Wisconsin Division Office Assistant Division Administrator Federal Highway Administration.

Slides:



Advertisements
Similar presentations
WELCOME BUDGET MANAGERS AND CHIEF FISCAL OFFICERS
Advertisements

Transparency Act Subaward Reporting and Executive Compensation September 10, 2010.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA)
DESIGN BUILD NATIONAL PERSPECTIVE by Dwight Horne FHWA.
Guidance on New CEs Emergency Repair Projects Operational Right-of-Way Limited Federal Funds EUM – March questions to:
Briefing to the Select Committee on Security and Constitutional Development 11 February
1eere.energy.gov Recovery Act Buy American Overview Benjamin Goldstein Buy American Coordinator for EERE Andrea Poniecki (202)
Buy American and the American Recovery and Reinvestment Act of 2009 (ARRA)
Buy America Policy for Utility Relocations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
FHWA Construction Updates David D. Platz, PE, PTOE Construction and Contract Administration Engineer US DOT - FHWA Wisconsin Division, Madison, WI FHWA.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
A Procedure for Major Consulting Services Contracts February 8, 2008.
Opportunities Exist to Strengthen FHWAs Coordination Guidance and Oversight of the Tribal Transportation Program October 30, 2013.
TITLE VI OVERVIEW Office of Employee Services Todd Sadler Director Karen Kienast Civil Rights Team Lead Nikita Rainey Title VI specialist Steve Kerber.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.
FAR Part 44: Subcontracting Policies & Procedures February 5, 2012.
Unified Carrier Registration (UCR) Update August 24, 2006.
1 Case Title: Training for Contractor Personnel Interacting with Detainees (DFARS Case 2005-D007)  Type:Final Rule Published 9/8/06 -Received one response.
Moving Ahead for Progress in the 21 st Century (MAP-21) – ROW Impacts Dianna Nausley, HQ RES Assistant Program Administrator Washington State Department.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Chapter 56 Workgroup Orientation Session The Road to Chapter 60 June 30, 2007.
1 Case Title: Combating Trafficking in Persons ( Implementation of Section 3(b) of the Trafficking Victims Protection Reauthorization Act of 2003) (FAR.
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Real Estate Workshop May 19 – 21, 2014 Office of Program Management Mamie Smith-Fisher.
Office of Business Development Training
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Value Engineering at FHWA
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
Compliance with the WTO Technical Barriers to Trade Agreement and Steps Toward Developing Good Regulatory Practices Bryan O’Byrne Trade Compliance Center.
1 Amy Williams, Senior Procurement Analyst February 5, 2008 Defense Acquisition Regulations System
The American Recovery and Reinvestment Act of 2009 (ARRA) Federal Highway Administration Wisconsin Division January, 2010 Jason P. Spilak, PE, ARRA Engineer.
Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended (URA) 49 CFR Part 24.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Buy American Provisions of ARRA 2009 State CDBG Recipients Workshop.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Contractor Alternate Design Serving the Public’s Best Interest.
WYDOT CLEARING UTILITIES Keri Bohlmann, P.E. Utilities & DSS Supervisor.
1 Amy Williams, Senior Procurement Analyst March 25, 2008 Defense Acquisition Regulations System
1 Amy Williams, Senior Procurement Analyst Friday, October 26, 2007 Defense Acquisition Regulations System
Briefing to the Portfolio Committee on Police 21 August
HANDOUT 2017 FSTIP Development Workshop Federal Statewide Transportation Improvement Program Requirements Wade Hobbs Federal Highway Administration California.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
TIBC Meeting Rapid City, SD Bob Sparrow Designated Federal Official – Tribal Transportation Self-Governance Office, FHWA/USDOT July 14, 2016.
AASHTO 2016 NTPEP Annual Meeting May 9, 2016
2017 ACEA Annual Conference
TTP Update COLT Meeting Rapid City, SD Bob Sparrow
Acceptance Process for Manufactured Products by Certification:
Buy America Good morning All:
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Utility Considerations on Transportation Projects
Working Session on American Iron and Steel (AIS) Requirements for the Clean Water and Drinking Water State Revolving Funds WWEMA 109th Annual Meeting.
Buy America and Utility Work
What is OAL? The Office of Administrative Law (OAL) ensures that agency regulations are clear, necessary, legally valid, and available to the public. OAL.
Contract Support Costs
Type: Final Rule Published 9/8/06
INDOT UTILITIES AND RAILROAD DIVISION
Presentation transcript:

NE Region Annual Utility Conference January 23, 2014 Kirk Fredrichs Wisconsin Division Office Assistant Division Administrator Federal Highway Administration

Topics for Discussion Buy America General Provisions MAP-21 Changes to Buy America Manufactured Products Buy America Waiver Process Questions?

Buy America General Provisions All Manufacturing Processes must take place domestically (initial melting, bending, drilling, machining, etc.) Includes coatings on these materials Minimal use of iron and steel (0.1% total contract value or $2500, whichever is greater) allowed before Buy America requirements take effect Waiver Requests Must demonstrate use is not in the Public Interest Insufficient domestic supply of satisfactory quality 23 USC 313 & 23 CFR Applies to all Federal-aid construction projects Iron & Steel only (permanently incorporated)

BUY AMERICA vs. BUY AMERICAN Requirement StatuteApplicabilityCoverageThreshold Buy America USC CFR Federal-aid Contracts Iron and steel products only 0.1% of Total Contract or $2500 Buy American FAR 41 USC 10a-10d 48 CFR 25 Direct Fed. Govt. contracts All materials except the 100 specified Specifically identified in NAFTA & other trade agmts

MAP-21 (Section 1518) On July 6, 2012 President Obama signed into law MAP-21, which took effect on October 1, 2012 MAP-21 widened the scope of Buy America requirements to all eligible contracts for assistance under the scope of the NEPA determination (if at least one contract within the same NEPA determination is funded with Federal funds). Scope of NEPA Document defines the project itself Project (1) vs. Project Contracts (Many)

SEC Buy America Provisions Section 313 of Title 23, United States Code, is amended by adding at the end the following: ``(g) Application to Highway Programs - The requirements under this section shall apply to all contracts eligible for assistance under this chapter for a project carried out within the scope of the applicable finding, determination, or decision under the National Environmental Policy Act of 1969 (42 U.S.C et seq.), regardless of the funding source of such contracts, if at least 1 contract for the project is funded with amounts made available to carry out this title.

MAP-21 Section 1518 – A Closer Look shall apply to all contracts eligible for assistance Does not explicitly exclude utility and railroad contracts from Buy America. if at least one contract for the project is Title 23 funded Does not explicitly restrict this trigger to only construction contracts. NOTE: The application of Buy America to utility & railroad work can significantly affect the cost estimate for the project

MAP-21 Buy America Summary Applies to all Federal-aid eligible construction contracts covered under the NEPA determination, including: Highway and bridge construction Railroad work Utility work (if eligible under State law) Triggered by: Use of Federal-aid for any contract under the NEPA determination, including: Design Environmental evaluation Right-of-Way Construction NOTE: The application of Buy America to utility & railroad work can significantly affect the cost estimate for the project

FHWAs Interpretations of Buy America & MAP-21 FHWAs December 20, 2012 letter to AASHTO MAP-21 Buy America Q&A on website cfm cfm Clarifies our interpretation of the Section 1518 Buy America provisions in MAP-21 General Buy America Q&A on website _qa.cfm (Best Source of Information!) _qa.cfm

Utility Relocation Contracts and Agreements Utility relocation projects are covered under Buy America (including those that are not funded by FHWA) unless the State law prohibits payments for utility relocation. FHWA memo of July 11, provided reasonable time for utilities to take the necessary to comply (through December 31, 2013).

Manufactured Products under Buy America Manufactured Product Definition "a good brought to the construction site for incorporation into the project that has been processed into a specific form or shape or combined with other raw material to create a material that has different properties than the properties of the individual raw materials. (2 CFR ) Bending, extruding, drilling, coating, etc. Defined in December 21, 2012 Memo from FHWA (Mr. John Baxter).

Manufactured Products If domestically-produced steel or iron ingots are shipped overseas for any manufacturing process and then returned to U.S., the resulting product does not conform with the Buy America requirement. Enforcement of Buy America provisions is a State responsibility. Work with WisDOT concerning questions on applicability concerning manufactured products WisDOT Form DT2249 developed

Manufactured Products Subject to Buy America December 21, 2012 Memo determined that Buy America applies if: Product is manufactured predominantly of steel or iron (at least 90% steel or iron content by weight when delivered to job site) Products subject to Buy America include: Most steel and iron products Guardrail, posts, end sections, terminals, cables Fencing and fence posts Pipe, conduit, manhole covers, risers Mast arms, poles, structural members, luminaires Reinforcing steel, wire mesh, strands, cables, etc.

Manufactured Products Exempt from Buy America Exemptions from Buy America include: Miscellaneous steel or iron components, subcomponents and hardware necessary to: Encase, assemble and construct the components listed in the previous slide Examples include: Cabinets, covers, shelves, clamps, fittings, sleeves Washers, bolts, nuts, screws, tie wire, spacers, chairs, lifting hooks Faucets, door hinges, etc. Manufactured Products not predominantly steel or iron

Buy America Waiver Process 1 State DOT identifies need for a waiver during preliminary engineering phase, submits request to FHWA Division Office Starts FHWA process 2 Review and recommendation by FHWA Division Office Days/Weeks 3 Submittal to FHWA HQ office / conducts nationwide search Days/Weeks 4 Post waiver notice on website for 15-day comment period. Start coordination with industry and Dept. of Commerce Manufacturing Extension Partnership (MEP) 2-3 Weeks 5 Notification from MEP on domestic supplier scouting results. Coordination of MEP findings between Division/State DOT Weeks 6 Coordination and FR publication by FHWA HQ /OST Weeks 7 Final notice publication in Federal Register/Approval 2-3 Weeks Total time neededSeveral months

Buy America Waivers Two Nationwide Waivers (Approved by FHWA Rule Making) Specific Ferryboat parts in February 1994 Pig iron, scrap, raw alloy materials, pelletized or reduced iron ore in August 1994 Project Waivers General Requirements Must comply with 23 CFR (c)(1) public interest / unavailable domestically Consider re-design with domestic Requires HQ review and Consideration March 13, 2008 memorandum Includes a 15 day information public review & comment period. Required to publish in the Federal Register one day before effective Could add 6 plus weeks to the approval process

Waiver Request Submittal Waiver request must include: Federal-aid/ARRA project number Project description Project cost Waiver item cost Brief description of the items function Country of origin for the product Reason for the waiver Re-design analysis using domestic product

Buy America Waiver Process Waiver process is initiated by contracting agency (WisDOT) if it believes waiver is warranted under provisions of 23 CFR (c). WisDOT submits waiver request to FHWA Division in advance of need (preferably during preliminary engineering stage). Division reviews the waiver for sufficiency and forwards to Headquarters with recommendations FHWA posts the waiver for 15-day comment period

Buy America Waiver Process (continued) FHWA HQ coordinates with appropriate industry associations (NSBA, AISI, and AISC) Provide summary of findings and justifications for the waiver. Submits an intent to issue a waiver for the product to the Chief Counsel, then to Secretary for publication in Federal Register. Final Federal Register publication constitutes approval of the waiver. Process may take considerable time to complete (maybe 60 days)

Buy America Certifications No required format by FHWA Step by Step Summary certifications Paperwork traceable to product delivered Documents chain of custody Not acceptable from Prime Contractor Must be by a Responsible & Knowledgeable party Discretion for certification format between FHWA Division Office and State DOT WisDOT Form DT2249 and DT2249a

Successful Practices DOTs should consider Buy America waivers during preliminary engineering phase to avoid delays during construction, and explore the use of alternate domestic products as much as possible. DOTs consider Buy America waivers in their risk assessment and development of the Federal-aid program. DOTs have adequate material certification procedures in their program to ensure compliance.

Thank you. Questions?