Ground Segment for WSO/UV

Slides:



Advertisements
Similar presentations
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
Advertisements

Presentation to Francisco Barreiro.- Engineering Director, Aerosp. Div. Moscow 30th June 2006.
GLAST LAT Project ISOC 5/17/2004 – Seth Digel1 ISOC Lessons Learned RFA09 Issue –No writeup on lessons learned from visits to other instrument/mission.
7M701 1 Software Engineering Object-oriented Design Sommerville, Ian (2001) Software Engineering, 6 th edition: Chapter 12 )
DLR IPY Data Portfolio: TerraSAR-X High Resolution SAR Data from Space Erhard Diedrich Head of Division International Ground Segment DLR – German Remote.
Slide 1 Sterling Software Peter Sharer Sterling Software.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Author: Lornet LD team Reuse freely – Just quote Cognitive Science Education Science Software Engineering The basis.
The Preparatory Phase Proposal a first draft to be discussed.
Object-Oriented Design Yonsei University 2 nd Semester, 2014 Woo-Cheol Kim.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
Mission Operation (MO) Services SM&C-MIA Joint Meeting ESTEC, 27 October 2009 Mario Merri, ESA.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
GENIUS. WP600 Support Activities Participants: University of Barcelona: 6PM CESCA (Center for Scientific and Academic Services of Catalonia): 24PM University.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
The roots of innovation Future and Emerging Technologies (FET) Future and Emerging Technologies (FET) The roots of innovation Proactive initiative on:
Eye-Sat : an astronomy student nanosatellite CCSDS meeting, March 23, 2015.
WIC meeting in Moscow Maohai Huang, NOAC Status of Chinese Participation in WSO/UV Maohai Huang National Astronomical Observatories, CAS On behalf.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
Space Operations as a Guide for a Real-World Scheduling Competition Eduardo Romero Marcelo Oglietti
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
GRID Overview Internet2 Member Meeting Spring 2003 Sandra Redman Information Technology and Systems Center and Information Technology Research Center National.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
Scalable Systems Software for Terascale Computer Centers Coordinator: Al Geist Participating Organizations ORNL ANL LBNL.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
WP6 Technical Work J Lauterjung GFZ Potsdam. Objective The main objective is the development of a novel and efficient e- infrastructure concept addressing.
1 PDS MC Requirements Process March 29, 2007 (v2).
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
Damian Gordon.  This module will serve as an introduction to Operating Systems.  It provides an overview of the major components of a computer system.
Ground Control AERSP 401A. Ground System’s Basic Elements Mission Elements –Control the space segment or handle mission data, and includes: Ground Stations.
Exploitation of ISS Scientific data EGI-Aparsen Workshop March Science Park– Amsterdam – The Netherlands Cooperative ISS Research data Conservation.
IPDA Architecture Project International Planetary Data Alliance IPDA Architecture Project Report.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
Centre of Excellence in Physics at Extreme Scales Richard Kenway.
Bob Jones EGEE Technical Director
Mission Operation (MO) Services
USNA Next Generation Ground Station
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
I&T&C Organization Chart
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
Systems Architecture WG: Charter and Work Plan
Authors: Maria de Fatima Mattiello-Francisco Ana Maria Ambrosio
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
Enterprise Algorithm Change Process
EuroVO-DCA Support to Data Centres from non-partner countries Enrique Solano INTA- Spanish VO EuroVO-DCA WP6 coordinator.
Russian Regional Center for LHC Data Analysis
ECT data sharing plan Which products do you intend to make available for use by other teams in their data analysis? When will these products be available?
The RSP Archive System RSP Archive Concept Review 28 September 2017
Exploitation of ISS Scientific data - sustainability
EU Institution Board 1 representative of each participating institute
SPICE Introduction October 2007.
International Civil Aviation Organization
Protocol Architectures
WSO/UV MOC and SOC Technical Definition Decisions to be made
Site classifications, definitions, and updates to Landnet
Systems Engineering Management
OBJECT-ORIENTED APPROACH TO OFFICIAL STATISTICS
Telecommunications and Networking
Launch and On-orbit Checkout
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
Ph.D Status Report: A part of WEBSYS Project
User Support The Help-Desk Tool
EVLA Operations Jim Ulvestad
Integration & Test Instrument Operations Coordination
Web Service Security support in the SSE Toolbox
Presentation transcript:

Ground Segment for WSO/UV BASELINE Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 MENU BASIC CONCEPTS WORK-PACKAGES DISTRIBUTION FUNDAMENTAL QUESTIONS Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 BASIC CONCEPTS The proposed ground segment for the WSO/UV has been defined as a fully distributed architecture composed of modular layers: Each layer contains components with identical functionality providing a concrete added value to the next layer in the hierarchy. The principles behind this layered architecture are very similar to the Open Systems Interconnection Reference Model. The layered design of the ground segment is the concrete form of implementing the international collaboration. According to this guideline, each layer shares architecture, technology, operational procedures and knowledge to provide homogeneous services to the next layer in the model. Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 Ground station layer: Comprises the network of primary and backup ground stations. Control centre layer: Includes the control centres co-located with a ground station, under the coordination of the mission control centre. Science centre layer: Comprises the science operations centre and the different national/regional science centres. End user layer: The science users. Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 WORK PACKAGES Ground segment Baseline Definition Data Handling Infrastructure on the ground Communications Infrastructure Ground Stations Space-Ground I/F Mission Operations Concept GS data base estructure, definition & requirements Specification (Catalog, Archive, Data dissemination) Validation/ Simulation Facility MOC SOC Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 WP Name Responsable 3000 Ground Segment (GS base line definition) TCP (coordinator) 3100 Space-Ground I/F (Down link requirements specification) TCP 3110 Requirements for Comand & Control 3120 Requirements for Scientific Data 3200 Data handling infrastructure on ground GMV 3300 Communications infrastructure (GS Comms. Subnet) 3400 Ground Stations 3500 MOC GMV (coordinator) 3510 Flight Dynamics 3520 Flight Control (SCC) 3530 Mission scheduling (MCC) 3540 Mission/Operations data archive requirements 3550 On-board software maintenance system 3600 SOC – soporte a INASAN (responsable internacional) 3610 SOC User funtionalities 3620 SOC Project funtionalities 3630 SOC Science funtionalities 3640 Science related data archive requirements INTA 3650 Spanish National Science Center UCM 3700 GS data base estructure, definition & requirements Specification (Catalog, Archive, Data dissemination) 3800 Validation/Simulation facility NTE 3900 Mission Operations Concept UCM (coordinator) Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006

WSO/WIC Meeting - Moscow 2006 SOME QUESTIONS: Do you agree with these work packages? Which is the minimum antenna set-up and the participants in the ground segment?, do they agree to go through qualification tests (and pay for them)? Distributed MOC with a Russian prime?, only Russian MOC from launch until nominal orbit reached? How are Russian, Chinese and Spanish technologies interact? What about SOC?, Instruments SOCs? Could we agree in a common phase A/B study? Ana I Gómez de Castro WSO/WIC Meeting - Moscow 2006