Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or.

Slides:



Advertisements
Similar presentations
TapRooT® Summit – Mining
Advertisements

Replacement of the Queens Approach Bronx-Whitestone Bridge
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
1 Loran-C Maintenance Support Presentation at the 31 st Annual Convention and Technical Symposium of the International Loran Association October 28, 2002.
HOUSTON, TEXAS1 Protection of DOT Regulated Pipelines During Construction and Repair Activities ENGINEERING SERVICES LP HOUSTON, TEXAS Engineering Specification.
1 1 Pre Bid Conference JGB Lobby Level Meeting Room December 12, :00 am IFB FQ12210 Rehabilitation of Parking Garages at Vienna (South), Southern.
Concrete Fooring & Roofing System
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 3, 2014|3:00PM -5:00PM | ROOM 1E-113.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Subpart R Steel Erection
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Safety : Scaffolds Introduction to Industrial Technology Spring 2014
WESLEYAN P BID PACKAGE #19
Chapter 3: Scaffold Safety
1 WELCOME TO PRE-PROPOSAL CONFERENCE ON RFP FOR REI SERVICES CONTRACT HBCR00A FOR COMPONENT REHABILITATION OF TWELVE BRIDGES CITYWIDE NYC DEPARTMENT OF.
Reconstruction of the Eads Bridge Highway Deck
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager October 6, 2011 Briefing on: DC CLEAN RIVERS PROJECT Anacostia River.
GA Tech Safety and Health Consultation Program FALL PROTECTION.
Metro in Washington DC Presented by: –Leslie Burton –Patrycja Padlo –Michael Santangelo.
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Fall Protection in the Roofing Industry
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
Runway 16L-34R Overlay RFQ Presentation. AGENDA Review of the RFQ Process Overview of the 16L/34R Overlay Overview of Section 4 - Scope of Work Review.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Garage Project Presentation Accu-Crete 2/28/2016.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Engineered Security Systems, Inc. Access Control Systems CCTV Systems Asset Protection Systems Fire Alarm Systems Laptop Protection Systems Burglar Alarm.
White Pigeon Community Schools
The Central Avenue Connector Trail
Project Purpose and Objective
Center City Connector 101.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Bill Good Chief Operations Officer
Gasunie is one of the biggest gas infrastructure companies in Europe
US26: Cornelius Pass Rd -185th Ave
Washington Metropolitan Area Transit Authority (WMATA)
How to Survive OSHA’s Steel Erection Standard
Construction Management & Inspection
الســقالات 29 CFR CFR تشير الإحصائيات بأن أكثر من 3 مليون عامل يعملون فى السقالات كل عام. كذلك تشير الإحصائيات إلى إصابة ما يزيد عن.
Washington Metropolitan Area Transit Authority (WMATA)
25th Avenue Grade Separation
25th Avenue Grade Separation
Illinois Waterway 2020 Consolidated Closure
Silver Line Department of Transportation
Minuteman Vocational Technical Regional High School Progress
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
ABC Company ABC Chemical Complex Engineering Specification
Presentation transcript:

Safety Tip FQ18086 RHODE ISLAND AVENUE METRO STATION TRACK DECK AND PRE-CAST PANEL REHABILITATION Please use full fall Protection gear when using 6’ or higher scaffolding during construction.

Technical Presentation Project Location: Project is at the Rhode Island Station on the Red Metrorail line. Station Address: 919 Rhode Island Avenue NE  Washington, DC 20018 Station Type: Aerial Structure Station, Center Platform.

Technical Presentation

Technical Presentation Work Limits: Work is within the station platform limits and extends to cross Rhode Island Ave as per drawings (B04-G-003) .

Technical Presentation Staging & Storing : All staging area shall be secured and ensure public safety Reference to staging area limits in Dwg. B04-G-004. South Parking entry way leading to fenced areas shall remain accessible all times. “No Parking” as indicated below:

Technical Presentation Staging & Storing : All staging area shall be secured and ensure public safety Bus bay along the wall. Pedestrians safety requirements apply

Technical Presentation Staging & Storing : All staging area shall be secured and ensure public safety. Equipment staging spots shall be coordinated with WMATA COR.

Technical Presentation Scope Of Work highlights: Track Bed concrete spall repair. Precast Concrete ceiling panels replacement. Spall repair at Beam Bearing. Lighting fixtures replacement. Expansion joints Replacement. Apply protective coating to track deck surface.

Technical Presentation Track Bed concrete Spall Repair: Multiple types or repair to Track Deck Type A Edge repair Type B overhead spall repair Type D concrete top surface

Technical Presentation Precast concrete ceiling panels replacement: WMATA provides portion of ceiling panel materials.

Technical Presentation Precast concrete ceiling panels replacement:

Technical Presentation Spall repair at Beam Bearing: Track 1 & 2 girders shall be jacked to repair the beams bearings.

Technical Presentation Apply Track Deck Protective coat.

Technical Presentation Access to the work area during the shutdown period (from July 21 to Sep. 2, 2018). WMATA’s Department of Track and Structures (TRST) will be performing rail re-profiling of the IB and OB tracks at Rhode Island Avenue Station. The contractor will not be permitted to work on the track bed of a track at the same time as TRST. It is estimated that TRST will require up to 22 days to perform their work on each track. The Contractor will be required to coordinate activities with COR/TRST in a manner that will result in the completion of the work required by both the Contractor and TRST within the 44 day shutdown period. Contractor and its subs will need to coordinate the work with WMATA COR, specially when the track deck beam bearing repairs and jacking girder beams are performed.

Permits Contractor is responsible to obtain Required DDOT & DCRA Permits prior to initiation of work. Road Closure permit: To perform the contract work at the station arial structure portion over Rhode Island Ave will require to obtain lane closure permit from DDOT. Noise permit: Since the project is surrounded by a residential area, contractor is required to obtain noise permit from Department of Consumer and Regulatory Affairs (DCRA) to continue work during night time, after 11:00 pm.

Scaffolding/Fall Protection: Contractor would need to build up or suspend scaffolding across Rhode Island Ave to reach the concrete ceiling panels. Contractor requires to complete installation of scaffolding at least one week prior to the shutdown

For Information Only: Scaffolding and fall protection Subcontractors or other companies can be used by prime contractor: Scaffold resources Tel: 240-478-9598 (Mark Hill). Safeway Group Tel: 800-582-9391 Scaffolding Solution Tel: 800-295-9445

Questions ?!!

We will meet on site 1:30 pm at the station kiosk for site visit