BEEP Integrated Design Process for Energy Efficient Buildings

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Building Energy Efficiency By Doug Horn. Agenda Introduction Why Focus on Buildings? ecoEnergy Retrofit Homes Program Energy Efficiency Measures Renewable.
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
By: R.M. Chitranshi. ECBC With the background of high energy saving potential and its benefits bridging the gap between demand and supply, reducing environmental.
Pathway to Net-Zero Energy Commercial Buildings Gregory B. Stark, P.E. National Renewable Energy Laboratory UNL Net-Zero Energy Workshop.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
Wayne Howatt 01. Welcome The Climate Challenge Director, Dearle & Henderson for Scottish FHE Institutions.
1 OEE Programs oee.nrcan.gc.ca Auto Smart. 2 Office of Energy Efficiency Natural Resources Canada (NRCan) created the Office of Energy Efficiency (OEE)
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
High-Performance Building Design Presented By: Hend Mohamed Ibrahim By:Ross A. Leventhal May 2001.
Promoting Energy Efficiency In Buildings in Developing countries.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
ENERGY EFFICIENCY IN INDUSTRY: TRENDS AND PROGRAMS IN AUSTRIA.
WHAT NEEDS TO BE COMMISSIONED IN ZERO ENERGY BUILDINGS 1 What needs to be Commissioned in Zero Energy Buildings? Jorge Torres Coto.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
MODEL HOME 2020_PAA/December2010 SERVICECENTER. MODEL HOME 2020_PAA/December2010 MODEL HOME 2020 VELUX has launched the project Model Home It is.
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
Concept of Energy Efficiency. Buildings, as they are designed and used, contribute to serious environmental problems because of excessive consumption.
Ripley Rasmus AIA LEED AP
Presentation to: COMPANY NAME January 2010 Green Merseyside Sustainability Event Presentation for:
Alice Goh, Building & Construction Authority.
By Igor Tchoulba Programme Officer UNDP Belarus. Duration - 5 years Budget – USD 4.9 mln Donors: GEF, UNDP National agencies: Department on Energy Efficiency.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Energy efficiency in buildings Monga Mehlwana Tuesday, 05 October 2010.
CHINA’S PROJECTS PROPOSALS FOR SESSION 2 Sun Yang Department of International Cooperation National Energy Administration, China
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
The Greening of the Rooftop Module 4 Green Building Rating Systems What Are They? How Do They Work?
Predesign Conceptual Design Design Development Detailed Design & Documentation Construction Operations and Maintenance.
Federal Aviation Administration NextGen Environmental Management System (EMS)
Energy Design of Buildings using Thermal Mass Cement Association of Canada July 2006.
1 Improvement of Industrial Energy Efficiency in Nigeria Presented by UNIDO.
Fundamentals of LEED v4 for
Energy Consumption Calculations Group 4a. Contents 1.Introduction 2.Methods 3.Tools 4.Country specific variations a.Finland b.Other Nordic countries c.Italy.
The Christman Company - Green MSU’s Greening the Supply Chain Conference April 21, 2014.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 7: Lighting and daylighting.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Chapter 27 Green Building and Certification Programs.
Chapter 8 - Integrative Process
Green Materials for building construction  Materials or products that Minimize resource use  Materials or products with Low environmental impact  Materials.
 Welcome & introduction  Health & safety  Mobile ‘phones  Agenda.
The importance of process in high performance building design.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Best HVAC Training in Chennai
Architecture Supported by:
Incorporating Renewable Power in U.S. Airports
Student Activities Centralized Training
Fort Stanwix National Monument Energy Audit Contract
Building Environmental Systems
‘Sustainability Matters – it’s the future of your business’
BIM EXECUTION PLANNING PROCESS
Training programs in IngREes project
Enercare Zero Net Energy Building Controls
Green Building and Sustainable Architecture
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Introduction Basic Requirements for a facade:
BIM EXECUTION PLANNING PROCESS
LEED BD+C – Integrative Process
ZERO ENERGY HOMES (ZEH)
Green Building and Sustainable Architecture
Concept of Energy Efficiency
Funded by the European Union
WESTERN REGIONAL WORKSHOP
2 GREEN PRACTICES IN NEW HOME DESIGN TEMPLATE 1.
The European Union’s programme for India
Green Building and Sustainable Architecture
FIVE PROJECT PHASES.
Synergies between NDCs & SDGs; Integration into National Planning
Customer Value Proposition
Presentation transcript:

BEEP Integrated Design Process for Energy Efficient Buildings

Why environmental sustainability depends on Energy Efficient Buildings? Globally, buildings use about 40% of energy and they emit approximately 1/3rd of GHG emissions In India, buildings account for 1/3rd of the electricity consumption By 2047, buildings will become the highest consumer of electricity But…. Energy sources are limited Burning more fossil fuels to generate energy means increased GHG emissions & higher global temperatures Source: Ministry of Statistics & Programme Implementation, 2018 Indo-Swiss Building Energy Efficiency Project

Energy Efficient Building and Thermal Comfort?? Thermally comfortable buildings are necessary to maintain the health and well-being of the occupants But, only 5% of Indians have access to cooling- though this number is increasing. 75% of a person’s time is spent inside buildings What is needed? Provide thermal comfort with reduced energy use. Indo-Swiss Building Energy Efficiency Project

BEEP Integrated Design Process & Charrettes Indo-Swiss Building Energy Efficiency Project

Conventional Design Process Concept design Schematic design Design development Construction drawings Construction Commissioning Client Architect… Structural Engineer HVAC Engineer Green/Energy Consultant….. Project manager Contractor…. Indo-Swiss Building Energy Efficiency Project

Integrated design- What do you integrate? Tier 2: Active Systems Tier 1: Passive Design Tier 3: Renewables Tier 0: Site & Building Design Solar thermal Climate analysis Building orientation Building shape Landscaping Heat gains Natural ventilation Window orientation Shading Daylight Materials Cooling Heating Fans Lighting Solar PV Solar thermal Wind…etc. Solar PV Wind Engineer Dominated Integration of: Multiple design professionals Multiple aspects of building design and construction Architect Dominated Source: Adapted from Lechner, Norbert: Heating, Cooling, Lighting : Sustainable Design Methods for Architects Indo-Swiss Building Energy Efficiency Project

Integrated Design Process Experience shows: Cost-effective and energy efficient design (25-40% energy savings at no/ marginal cost increase) is possible if the architect, engineer and client work together in a Design Charrette/Workshop during the early design phase. More savings are achieved when the architects and engineers continued to work together in the design phase. Concept design Schematic design Design development Construction drawings Construction Commissioning Client Architect Structural Engineer HVAC Engineer Green/Energy Consultant….. Energy saving potential Efforts / Costs Timing for Design Charrette Indo-Swiss Building Energy Efficiency Project

Why Integrated Design? Better thermal comfort Achieve sustainability with no additional investment Reduced energy use Reduced equipment size Attract better tenants / occupants Reduced operation & maintenance cost Indo-Swiss Building Energy Efficiency Project

Stages of an Integrated Design Process Conducting a charrette Charette preparation Follow-up, checks & commissioning Concept design Schematic design Design development Construction drawings Construction Commissioning Indo-Swiss Building Energy Efficiency Project

What is a Charrette? The word “Charrette” is a French word, originally meaning a cart. It has evolved to mean a collection of ideas or a session of intense brainstorming. This happened in the 19th century, when students of L’ecole des Beaux Arts in Paris would ride in the cart sent to retrieve their final art and architecture projects, frantically working together to complete or improve these projects. Today it implies an intensely focused activity intended to build consensus among participants and develop specific design goals. Indo-Swiss Building Energy Efficiency Project

Who participates in a charrette? Client Owner Promoter Building operator, Facilities / O&M etc. Users Building operator, Facilities / O&M etc. Design Team Architect HVAC consultant Electrical consultant Green Building Consultant etc. Landscape designer Interior designer Building execution team Project manager Construction manager Contractor Indo-Swiss Building Energy Efficiency Project

Stages of an Integrated Design Process Charette preparation Prepare the project brief Identify an individual or team to own / lead the integrated design process Assemble the design team, and (if possible) the execution team Create a few conceptual architectural designs Carry out climate and other preliminary analysis to understand what strategies may work Get background information on possible strategies (Technical specs, cost….) Indo-Swiss Building Energy Efficiency Project

Stages of an Integrated Design Process Conducting a charrette DAY 1: Fix the energy / comfort goal for the building DAY 2: Finalise the set of strategies that may be applied DAY 3: Test out the effectiveness of the strategies Energy savings and comfort (through simulation tools) Capital and operational cost (cost database tool) Develop alternative designs DAY 4: Decide on final strategies / design Decide on next steps & assign responsibilities to track progress Indo-Swiss Building Energy Efficiency Project

Stages of an Integrated Design Process Charrette Follow-up Prepare a charrette report and circulate to all participants Make sure the lines of communication are open between all charrette participants Hold periodic meetings to review the implementation of the charrette recommendations Prepare a final assessment after the completion of the project and after occupation. Indo-Swiss Building Energy Efficiency Project

Charrette tools (Analytical) Climate analysis tool (e.g. ClimateConsultant etc.) Weather data (.epw files etc.) Basic sun-path tool (e.g. Sketch-up, Ecotect etc.) Tool to calculate heat gains through building envelope (e.g. RETV compliance tool) Thermal comfort and energy simulation tool (e.g. EnergyPlus, DesignBuilder etc.) Daylight simulation tool (e.g. Radiance, DesignBuilder) Cost Database tool Indo-Swiss Building Energy Efficiency Project

BEEP Integrated Design Charrettes Technical support to 22 building projects (IT buildings, hospital, offices, residential complexes, academic institutions,..) >1.5 million m2 built-up area 25-40% estimated energy savings Indo-Swiss Building Energy Efficiency Project

Building Design: Integrated Design Process Hospital Educational campus Residential township World Trade Centre Training institute & govt. office Office & Retail complex Indo-Swiss Building Energy Efficiency Project

Indo-Swiss Building Energy Efficiency Project Thank you For details contact: Saswati Chetia; saswati@gkspl.in Indo-Swiss Building Energy Efficiency Project