1-line, site map and placard requirements (Scenario 1)

Slides:



Advertisements
Similar presentations
Solar PV On-Site Guide Solar PV On-Site Installers Guide.
Advertisements

PowerPoint ® Presentation Chapter 4 System Components and Configurations Components Electricity Sources System Configurations.
GEOTHERMAL AND SOLAR PANEL INSTALLATION BY GRACE BALDWIN.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Photovoltaic Panels on Cronin’s House System Cost: $7.50 / Watt.
By Dale A Gulden, Solar Direct CEO. Solar Electric – Basic Components 1. Modules – solar electric collectors. 3 basic types in the marketplace: Mono crystalline,
Solar Energy in Hawaii BY XINMEI LIANG. Hawaiian Electricity Generation.
Springfield Power & Light. 4% of Total Electric Sales (GWh)320 Capacity Factor of Solar Panels20% Generation Capacity (GW DC )0.183 Installation Cost.
Home Solar Power and Monitoring Don Ferguson Go Green.
Solar Charger Daniel Wexler Stephen Gallant. The Project Our task: To design a portable box to carry the electronics of a portable solar charger. We were.
Solar Pathfinder. Question What locations on campus would be the best candidates for solar PV array installations? Hypothesis We hypothesized that the.
Hybrid Wind & Solar Generation Project
Solar Incentive Program. Solar Technology Overview Sunlight converted to DC electricity by solar panel Solar panels connected to an inverter to create.
Nuclear Fissionary, April 2, 2010 Why are prices declining?  Generally, solar panels make up about 50% of the cost of a system (40% for thin film),
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Current Electricity - Symbols Draw the symbol for each electrical device.
The wind is blowing on a turbine 10 feet in diameter at a velocity of 12 mph. What is the power developed by the turbine? Power = 0.5 x Swept Area x Air.
Grid Tied PV Systems – Part 5
© British Gas Trading Limited 2011 Slide 1 Re-establishment of Shipperless Sites UNC0425 Scenarios Scenario 1 – Last Shipper only activity Effective meter.
E4 HVACR Electrical Installation
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
PLC Front Panel.
Call now! A Guide for Residential, Grid-Connected PV Systems © 2012 American Solar Electric. All rights reserved.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Routine Inspections 1 1.
Distribution Grid and Interconnection Stakeholder Group
E4 HVACR Electrical Installation
Metering Grid-tie with Battery Backup
TECHNICAL SPECIFICATION AND REQUIREMENTS
SOLAR GRID-TIE SYSTEM
How to Create Sustainable Living for Non-homeowners?
Solar information Session
E4 HVACR Electrical Installation
Stand-Alone Solar PV Energy System
Power Jack Electric Co.,Ltd.
PLC Front Panel.
Photovoltaic Systems Engineering Session 21
CACTUS MOON EDUCATION, LLC
“Your direct, energy solutions.”. How does D2D Fit? Consumers have responded well Immediate Savings Today for No Money Down works Both Industry #1 & #2.
Circuit Circuit – A complete path along which electrons flow (negative to positive) 3 basic types Series Parallel Series-Parallel Combo.
One Line Diagram Example
Q Action on Grid Modernization, Energy Storage, and Utility Reform
[Project Name] One-Line Drawing
/ July 2016 DC NEG credited at retail rate; credits do not expire
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
PEPCO Energy here Used there
Net Metering John McComb: P.E.
PLC Front Panel.
Waste Heat Recovery from PV Panels
The Maddox-Hirschboeck Residence
Holy Cross Energy CREA Energy Innovations Summit 2016

Smitty’s Two Minute Drill Photovoltaic Systems
1-6 Midpoint Find the midpoint of: DE: DC: AB: AE: (2+5) / 2 = 3.5
PLC Front Panel.
EUSERC Training May 2017 Connecting Single phase 3 wire invertor to 3phase 4 wire utility service. Lessons learned - Customer Owned Interconnected Generation.
Net Metering John McComb: P.E.
Functions Guided Notes Review
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
PLC Front Panel.
Net Metering / April 2019 DC 40 States + DC,
SMART Program Specific Metering Wiring Diagrams May 2019
PLC Front Panel.
Solar Generation System
Dominion Energy South Carolina: Solar Equipment Requirements
/ July 2016 DC NEG credited at retail rate; credits do not expire
Net Metering / April 2019 DC 40 States + DC,
2016 Action on Net Metering, Rate Design, & Solar Ownership Policies
Presentation transcript:

1-line, site map and placard requirements (Scenario 1) Tom Solar 505 Camino De Solar St. Corrales, NM 87110 505-555-5555 REC meter & Net Meter are grouped together and in plain line of sight. 1-line diagram is placed at PNM Net Meter PNM Site Map N Solar Panels The placard: “Utility Safety Disconnect use to Isolate from Customer Generation” is placed on the Customer Generation Disconnect DC Disconnect Customer Generation Disconnect Inverter REC Meter Main service Panel PNM Net Meter Inside garage Front Entrance Driveway Camino De Solar Street

1-line, site map and placard requirements (Scenario 2) REC meter & Net Meter are not grouped together and not in plain line of sight Site Map is placed at the PNM Net Meter. 1-line diagram is placed at the REC Meter. Tom Solar 505 Camino De Solar St. Corrales, NM 87110 505-555-5555 PNM Site Map N Solar Panels The Placard: “Warning Customer-owned Generator Connected. See drawing for Disconnect Location” is placed at the PNM Net Meter DC Disconnect Customer Generation Disconnect Inverter REC Meter Main service Panel Inside garage The placard: “Utility Safety Disconnect use to Isolate from Customer Generation” is placed on the Customer Generation Disconnect Front Entrance Evelin Pass to Gary or Mike? PNM Net Meter Driveway Camino De Solar Street

1-line, site map and placard requirements (Scenario 3) REC meter & Net Meter are not grouped together and not in plain line of sight Site Map is placed at the PNM Net Meter. 1-line diagram is placed at the REC Meter. Tom Solar 505 Camino De Solar St. Corrales, NM 87110 505-555-5555 PNM Site Map N Inverter DC Disconnect The Placard: “Warning Customer-owned Generator Connected. See drawing for Disconnect Location” is placed at the PNM Net Meter Customer Generation Disconnect Solar Panels REC Meter Detached Garage Main service Panel PNM Net Meter Inside garage The placard: “Utility Safety Disconnect use to Isolate from Customer Generation” is placed on Customer Generation Disconnect Front Entrance Driveway Camino De Solar Street

1-line, site map and placard requirements (Scenario 4) Tom Solar 505 Camino De Solar St. Corrales, NM 87110 505-555-5555 REC meter & Net Meter are grouped together and in plain line of sight 1-line diagram is placed at the REC Meter. PNM Site Map N Inverter DC Disconnect The placard: “Utility Safety Disconnect use to Isolate from Customer Generation” is placed on Customer Generation Disconnect AC Disconnect Solar Panels Customer Generation Disconnect Detached Garage REC Meter Main service Panel PNM Net Meter Inside garage Front Entrance Driveway Camino De Solar Street