San Dieguito Lagoon Inlet Dynamics and Maintenance

Slides:



Advertisements
Similar presentations
Willem Botes: WAMTechnology cc A Milnerton Estuary Study (Diep River), during 2004 was used as an example. Click to continue A demonstration.
Advertisements

Corps of Engineers ® San Francisco Engineer District 12 June 2008 Harbor Safety Committee Slide 1 “ASSESSMENT AND REPORTING OF ACOUSTIC CLEARANCE SURVEYS.
Current meters Tide gauges Figure 1. Current speeds incoming tide spring tide July cm/s 85 cm/s 20 cm/s Figure 2.
Line Efficiency     Percentage Month Today’s Date
Writing Earth history with continental- margin sedimentary processes STUPID HUMAN TRICKS Po and Mississippi Rivers.
Writing Earth history with continental-margin sedimentary processes STUPID HUMAN TRICKS Po and Mississippi Rivers.
Before human control  Natural rate of coastal progradation 4 m/y from 1000 B.C. to 1200A.D.  Seven points of discharge described by Plinio il Vecchio.
Coastal & Port Engineering Considerations of the Jacksonville Harbor Deepening Study Kevin Bodge, Ph.D., P.E. Port & Coastal Engineer Senior Vice President.
70,000 – 12,000 BCE Travel from Siberia to Alaska.
SOUTHERN CALIFORNIA BEACH PROCESSES STUDY SCRIPPS INSTITUTION OF OCEANOGRAPHY UNIVERSITY OF CALIFORNIA, SAN DIEGO.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
NCER 2004 Wetland and tidal channel evolution affecting critical habitats at Cape Sable Everglades National Park Wetland and tidal channel evolution affecting.
Unauthorized Grading, Fill, and Uses of Wetlands, and Unpermitted Development of a Concert Stage/Bandstand at the 22nd District Agricultural Association’s.
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
LESSON 1: INTRODUCTION Approach to Problem. BEACH PROFILE Coastal Processes with Engineering Applications (Dean and Dalrymple)
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Bureau of Economic Geology The University of Texas at Austin.
Department of Army Permitting Process: Dredging
Bureau of Economic Geology John A. and Katherine G. Jackson School of Geosciences The University of Texas at Austin.
Landsat 1 - Jan 16,1973 List of some things we did Dammed river – reduced sediment supply, 400 million t/y to 200 t/y Built artificial levees.
LOWEST POSSIBLE ELEVATION WHAT IS THE LOWEST POSSIBLE ELEVATION? POSSIBLE ELEVATION? North South West East.
Engineering Surveys & KGPS. Outline Problem Example Applications / uses of KGPS Project Example.
GIS Analysis of Sediment Transport in Humboldt Inlet, California Joshua L. Caulkins.
Topics: Unauthorized development at 22 nd District Agricultural Association’s Fairgrounds property, Del Mar, San Diego County October 5, 2011 Coastal Commission.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
STA 2 Expansion Project Conceptual Plan for Cell 4 STA 2 Expansion Project Conceptual Plan for Cell 4 Long-term Plan Communications Meeting November 18,
James C. Gibeaut1, Tiffany L. Hepner1, Rachel Waldinger1, John R
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
ZONE 5 LINE A (ALAMEDA CREEK)
      Landsat 1 - Jan 16,1973                                                                                              
Steve Woolard Project Engineer
ITI Portfolio Plan Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Current Date Visibility of ITI Projects ITI Projects.
Monitoring Shoreline Change at Port Hueneme Beach
Sand Deposits and Flooding Along the San Jacinto River
Chapter 21 Budgeting Accounting, 21st Edition Warren Reeve Fess
Manned Boat ADCP Deployment
2017 Safety Group 1 – 5 Year Program Timeline Guide
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
Mammoth Caves National Park, Kentucky
Inlet on Dean Keaton St 32.5ft ft above datum ft
October 5, 2011 Coastal Commission Meeting
Thimble Shoal channel.
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
HYDROLOGY Lecture 8 Measurements-2
Discharge Rate in White Point Swash
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Grid of 2-D seismic lines
Open water area Franks Tract
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
October 5, 2011 Coastal Commission Meeting
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Objective - To make a line graph.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
Text for section 1 1 Text for section 2 2 Text for section 3 3
Monterey County Project Report for Measure X Expenditures
2012 Safety Group 1 – 5 Year Program Timeline Guide
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Committed to our coast Preliminary Assessment of Restoration Impacts in the Isles Dernieres, Terrebonne Parish, LA CPRA Board Meeting Baton Rouge,
Presentation transcript:

San Dieguito Lagoon Inlet Dynamics and Maintenance Coastal Environments La Jolla, CA www.coastalenvironments.com 3 June 2004 CE Ref. No. 04-07

Lagoon Inlet Lagoon Inlet Dynamics Lagoon monitoring program 1993 Flood Inlet sedimentation Inlet behavior Inlet Maintenance Plan Initial and Periodic Maintenance Excavation, public access and safety Effect of artificial inlet opening on adjacent beaches Video – Excavation Operation (Sep 2000)

Surveys and Measurements

1993 San Dieguito River Discharge

Established Transects

Transects of Interest

Traverse TR2 Located at the Inlet Area

Traverse TR7 Located at West Channel

Traverse TR10 Located East Railway Bridge

Traverse TR11 Located East Railway Bridge

Cross-Sections Changes Jan Jan Sep 1993 1994

Areas 1, 2 and 3

Sedimentation Rates Areas 1, 2 and 3 6000

Weak Outflow – Inlet 1992

Flood of 1993 causing Strong Flow – Inlet 1993

Stable Inlet – 1994

Excavation Plan Initial excavation Periodic dredging At start of project Estimated by 45,000 yd3 Periodic dredging Every 8 months 16,000 yd3

Initial Excavation

Periodic Excavation

Estimated Excavated Volumes

Opening San Dieguito Lagoon Number Open Date Close Date 1 23 Sep 2000 21 Nov 2001 2 4 Oct 2002 4 Nov 2002 3 5 Sep 2003 Still open

Beach Response to SEP 2003 Artificial Inlet Opening Profile Located Just South of Inlet Control Profile Located 2,000 ft South of Inlet

Excavation Operation – Sep 2000 Video of the Inlet Opening can be viewed on the previous Web page from within the June 2004 Presentations section