IPP Office: Role and Mandate

Slides:



Advertisements
Similar presentations
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
Advertisements

Motivations for a Socially- Owned Renewable Energy Sector: A South African Case Study Dinga Sikwebu National Education Coordinator.
Energy for a low-carbon economy 11 November 2010 Presentation by Ernst Venter Executive General Manager Business Growth.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
Responding to the Electricity Challenges: Five Point Plan Overview 19 December 2014 Confidential 1.
Financing energy efficiency measures in low-income and affordable housing September 2012 Shehnaaz Moosa SouthSouthNorth
PREFERENTIAL PROCUREMENT WORKSTREAM
Black Business Council 7 June South African partner : 40 % 2. Local content, job creation & BEE: 30 % 3. Contribution towards local community.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
Climate change Submission to parliament by Business Unity South Africa.
Eskom’s contribution to the solar park initiative
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Thabo Masombuka Chief Executive Officer (CE0) CSCC TRANSFORMATION TRENDS IN THE CONSTRUCTION SECTOR 13 August 2014.
For Sustainable Development Green Economy CoT GDS: Sustainable development and Natural Resources Theme Week 13 to 19 August 2012.
1 TRADE POLICY MAKING PROCESS IN MALAWI Presentation by Mr. H.J.K. Mandindi Director of Trade, Ministry of Industry and Trade.
EU Climate Action EU – Central Asia Working Group on
ENERGY INTENSIVE USERS GROUP Ian Langridge Chairman January 2010 Eskom’s Revenue Application for Multi Year Price Determination MYPD (2)
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
Presentation to Membership. A Recap of Our Process February 2009: Decision to renew strategic plan March 2009: Engagement of Berlin, Eaton.
Presentation to Select Committee on Economic Development
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
SCALING UP RENEWABLE ENERGY Photo: Sarah Fretwell/USAID.
Policies and plans Regarding Green Economy CHIETA Colloquium 13 th February 2014 Zakhele Mdlalose.
Just transition to a low carbon economy
MELBOURNE RENEWABLE ENERGY PROJECT
Strategic Plan and Annual Performance Plan
SA GHG Emission Reduction System: Progress and development of 2nd Phase of the DEROs and Carbon Budgets PCEA 28 OCTOBER 2016.
NATIONAL e-STRATEGY Presentation to the Portfolio Committee on Telecommunications & Postal Services DG: ROBERT NKUNA AUGUST 2017 Building a better life.
Renewable Energy and SA GHG Emission Reduction System
Professor H. J Annegarn, Ms L Cape
Chairman of the Board and CEO,
Analysis of the State of the Nation Address
Gauteng Economic Indaba
Creating a culture of innovation
OVERVIEW OF ANNUAL REPORT PRESENTED TO THE PCOF / NCOP SC
Government’s strategy for Broad-based Black Economic Empowerment
Portfolio Committee- Trade and Industry – 11 March 2015
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
SECRET.
A Partnership Model: African Mineral Skills Initiative
ArR720S: applied regional and RURAL economic development
PROGRESS REPORT ON IMPLEMENTATION OF THE PUBLIC FINANCE MANAGEMENT ACT
Presentation to the Joint Budget Committee Tuesday, 18 November 2003
Commission 2: Manufacturing S
Presentation to Parliamentary Colloquium on climate finance:
the dti Implications of SONA on the dti
An Integrated Industrial Policy for the Globalisation Era
Broad-Based Black Economic Empowerment Amendment Bill, 2012
DEPARTMENT OF MINERAL RESOURCES
MELBOURNE RENEWABLE ENERGY PROJECT
Translating political objectives into sound policy proposals
Kuwait – Germany Prospects for Cooperation
BRIEFING TO THE PORTFOLIO COMMITTEE ON ENERGY ON THE IMPACT OF 2016 SONA 23 FEBRUARY 2016 Minister Tina Joemat-Pettersson.
BEIS Local Energy Team Stuart Chapman, Local Partnerships Manager
SOUTH AFRICAN INSURANCE ASSOCIATION
A Focus on Strategic vs. Tactical Action for Boards
Progress on the Renewable Energy IPP Procurement Programme
PRESENTATION TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITEE ON ENERGY
INNOVATION DEALS: A NEW APPROACH TO REGULATION
OUTLINE RE Programme Objectives Integrated Resource Plan
Director-General: Mr. E Africa
BRD The Development Bank of Rwanda Plc (BRD) is Rwanda’s only national Development Finance Institution Public limited company incorporated in 1967 and.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
PRESENTATION: SARPA CONFERENCE Role of NIASA
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Presentation transcript:

Presentation to African Renewable Energy Regional Center of Excellence 4 August 2016

IPP Office: Role and Mandate IPP Office was established in November 2010 by the South African Department of Energy (DoE), National Treasury (NT) and the Development Bank of Southern Africa (DBSA) through a Memorandum of Agreement Memorandum of Agreement governs the relationship between the DoE (Mandate), NT (Funding) and DBSA (Procurement & HR) and provides the IPP Office with its primary mandate Primary mandate is to secure electrical energy from the private sector for renewable and non- renewable energy sources pursuant to Ministerial Determinations in terms of section 34 of the Electricity Regulation Act Flowing from the primary mandate, the IPP Office also has a mandate to: Monitor, Evaluate and Contract Manage IPP Project Obligations in terms of the Implementation Agreement Pursue regional IPP procurement collaboration and capacity support Provide advisory services to the Department of Energy in support of an enabling environment for private sector investment IPP Office is self funded through a development fee cost recovery mechanisms Mandate instructions are received from the Department of Energy and performance oversight over the IPP Office is also conducted by the Department 10 November 2018

Policy Context of the Role of the IPP Office NDP The National Development Plan (NDP) identifies the need for South Africa to invest a strong network of economic infrastructure. Energy infrastructure is a critical component. IRP The Integrated Resource Plan (IRP) 2010 developed the preferred energy mix with which to meet the electricity needs over a 20 year planning horizon to 2030. Determinations The following determinations have been made since: 13 225 MW RE 2 500 MW coal-fired plants 1 800 MW cogeneration 3 126 MW gas-fired power plants 2 609 MW imported hydro 1 500 MW Solar Park Strategic Partner 600 MW Gas Strategic Partner IPPPP The Independent Power Producer Procurement Programme (IPPPP), as managed by the IPP Office is a key vehicle for securing electricity capacity from the private sector for renewable and non-renewable energy sources as determined by the Minister of Energy 10 November 2018

World Acclaimed Procurement Methodology Enabling Policy and Regulatory Environment – section 34 of the Electricity Regulation Act, 2006 enabling ministerial determination of new generation capacity and identifying the designated procurer and designated buyer Competitive tender process vs REFIT and Direct Negotiations – five rolling bid rounds to date producing better price outcomes with each bid round High quality and bankable documentation and contracts Fairness, transparency and trust building with the private sector- evaluations conducted under strict security conditions, thorough review process and strong communication with the private sector Appropriate allocation of risk with Government Support for both IPPs and Eskom …”it (REIPPPP) has already established a flagship public-private partnership model for South Africa, and indeed the rest of Africa, and in the process is helping alleviate Eskom’s current power crisis while also reducing greenhouse gas emissions.” - Enabling Renewable Energy in South Africa: Assessing the REIPPPP, WWF, August 2014 10 November 2018

Ramp-up of electricity capacity, energy mix and private sector participation IRP 2010 Required future capacity (renewables and other) MW Procured in REIPPP BW 1 – 4 | MW Operational 7 1522 2144 Already determined capacity (29 110MW) + 1 005MW from Peakers Renewable Energy Implemented through IPPPP Non-renewable Energy Implemented through IPPPP Following on the National Policy Conference directives, we have accelerated the IPP Procurement Programmes to meet IRP targets In line with the national commitment to transition to a low carbon economy, 17,800 MW of the 2030 new build target in the IRP are expected to be from renewable energy sources Of this, 13,225 MW is targeted to be procured from Independent Power Producers (IPPs) IRP planning requirements further include 25 759 MW new build electricity capacity to supply for base load and medium-term risk mitigation (MTRM) plans by 2030. In the short term the IRP had planned for approximately 9 505 MW of this electricity capacity to be procured from IPPs and be operational towards the end of 2025. To date, we have determined over 30,000 MW to be procured from IPPs for which procurement plans are either underway or in development The IPP Office is responsible for the implementation of all these determinations, except for the Nuclear determination made in December 2015. An Additional information slide on the IPPPP contribution to security of energy supply is provided at Annexure Pack Slide 25 Nuclear 9 600 MW SECRET

IPPPP garners investor confidence

93% Renewable programme bringing electricity online quickly... megawatts operational as at 31 March 2016 It is clear that the REIPPP is bringing electricity online quickly In just two years, we have demonstrated that Renewable energy is time responsive with short construction periods of 2 – 3 years therefore being able to deliver green energy capacity on-line quicker The first Renewable Energy IPPs have consistently contributed new capacity to the network since the end of 2013. At March 2016, 93% of IPPs scheduled to be operational have started commercial operations. The average lead time for these 43 projects to complete has been 1.8 years. 93% SECRET

Delivering Increased investment Projection for 2023 (based on 21 448MW) Commitment for 6 376 MWs procured Note that data includes BW 1, 2, 3, 3.5, 4 and smalls If extrapolated for the complete IPPP programme2: Planned Investment Total Project Costs1 committed for IPP development R194.1 billion R654 billion ~ of which: R53.4 bn from foreign sources The IPP Programmes have attracted R194 billion in investment since inception. Of this, R53.4 billion (27.5%) is from foreign financiers and investors across the globe. This is equivalent to 86.1% of the total FDI attracted into South Africa during 2014 (R62 billion). If we continue at current projections and pace, the total investment for the IPP Programmes by 2023 could be around R654 billion R139.4 bn from domestic financial institutions3

Black industrialists are participating meaningfully Not only are we seeing an investment in BBBEE increasing, we are also increasing active participation of black South Africans in the management and operation of IPPs. 29% average shareholding by black South Africans in IPPs has been secured across the value chain in Bid Windows 1-3. People in local communities currently own 11% of the IPP Projects that have reached financial close under Bid Windows 1 and 2 Projection for 2023 (based on 21 448MW) Commitment for 6 376 MWs procured Note that data includes BW 1, 2, 3, 3.5, 4 and smalls Planned BBBEE commitment If extrapolated for the complete IPPP programme2: R103 billion R342 billion ~ BBBEE commitments of R55 million have been achieved on the IPP Programmes to date. If we extrapolate this at current pace this would result in R342 billion of investment in black industrialists through the IPP Programmes Not only are we seeing an investment in BBBEE increasing, we are also increasing active participation of black South Africans in the management and operation of IPPs. Shareholding by black South Africans in IPPs has been secured across the value chain. People in local communities currently own 11% of the IPP Projects that have reached financial close under Bid Windows 1 and 2 R34.5 billion achieved …intending to increase BBEEE participation in new programmes and addressing funding with PIC, DBSA and IDC

Substantial private sector investment in broad-based empowerment … The IPPPP is making a substantial private sector investment in broad based empowerment from IPP Community Trust Dividends, and ED and SED commitments In terms of Community Trust Dividends The total commitment over the life-cycle of the existing projects is just over R29 billion. On average, just over R1.46 million per year is contributed to local community development under the current IPP projects. In Socio-Economic Development A total of R22.7 billion in SED commitments in Bid Windows 1-4 and Smalls are currently planned over the 20 years life-cycle of the IPPs. By March 2016, we have achieved R171 million in socio-economic development commitments from 43 IPPs that have come into operation since August 2014 If extrapolated at the current procurement pace, we could see this SED contribution increase to R64 billion over the next 7 years In Enterprise Development A total of R6.99 billion have been committed by current IPPs over the life-cycle of the current operational IPPs By March 2016, we have already achieved R53 million in planned contributions from the first 43 operational IPPs If we extrapolate this at current pace and in line with the procurement plan over the next 7 years, we could see this contribution increase to R20 billion. Working with national, provincial and local government to optimise the impact of investments, for example in education

Localisation – a new industry is emerging in South Africa Local content targets Real industrial effect Trend of exports of photo-voltaic cells & assembled PV panels). Planned Local Content R65.7 billion Achieved Local Content R30 bn Procured Achieved achieved A total of R30bn local content spend has been achieved in IPP Programmes. Since the IPP programme started, a significant increase of South African based product exports can be observed on the export data as reported by SARS. Although coming off a low base, these exports create and sustain valuable jobs as well as to contribute to the country’s foreign reserves - crucial in the current economic climate. 58% of exports for 2014 and 2015 were destined for Europe, 35% to North America and 5% to Africa. In the first 3 months of current year (2016), 91% of exports are destined for North America

Jobs for the people-Jobs for youth Projection for 2023 (based on 21 448 MW) Commitment for 6 376 MWs procured Note that data includes BW 1, 2, 3, 3.5, 4 and smalls Planned Employment SA citizens If extrapolated for the complete IPPP programme: Cumulative construction and operations employment 371 000 111 835 ~ Job years2 Job years2 13 073 jobs for youth (more than 46% of total SA citizen jobs). R90 million committed to Education and Skills Development. In only three years, the IPP Programmes have created just under 25 000 construction jobs from the 3 active bid windows. If extrapolated at current pace this could result in over 371 000 job years created by 2023 24 965 job years achieved since end 2013 to 31 March 2016 (bid windows 1, 2 and 3)

Harnessing regional energy stability SECRET Harnessing regional energy stability Regional engagement framework being developed for South Africa’s collaborative role in regional capacity building, investment and trade in energy: Hydro: The Grand Inga Treaty obliges SA to negotiate an off-take agreement for 2 500 MW of hydroelectricity from the Inga Hydro Project - Capacity support to be provided for the INGA Project Management Unit Coal: A 3 750 MW determination gazetted in May 2016 for procurement of Coal IPPs in the region Gas: Significant opportunities identified for gas supply and gas- to-power projects in Mozambique Renewables: Sharing experiences (bilaterally and on demand) with African countries seeking to roll-out their RE strategies, for example current support to Namibia CSP and Botswana PV RFP The prosperity of the regional electrical energy sector is not only profoundly important for the economic development and growth of SADC and its comprising member states, but it also has direct positive implications for the South African economy. The increased demand for South African goods and services that emanate from a more prosperous regional economy and regional electricity trade options will be the main growth drivers. Recognising this, the Department is currently developing a regional engagement framework for South Africa to play a collaborative role in regional capacity building, energy investment and trade in Energy We are embarking on a number of advisory and capacity development activities, mostly focused on renewable energy development with countries in the region, including Botswana, Namibia, Malawi and Kenya A key focus is the operationalisation of the off-take agreement for 2 500 MW of hydroelectricity from the Inga Hydro Project. A prefeasibility study was conducted to investigate and assess different transmission solutions to deliver the 2 500 MW power allocated to South Africa. The prefeasibility study has recommended a preferred Inga 3 transmission solution with one alternative option. South Africa has also had engagement with the transit governments to discuss the process to conclude cooperation agreements and specific development agreements for the transmission line during the June SADC Energy Officials and Ministers Meeting in Botswana. We will also provide capacity support to the Inga Project Management Unit through the appointment of a South African Energy Attaché at the South African Embassy in Kinshasa - appointment will be finalised very soon.