2017 Exploration & Production Winter Standards Meeting

Slides:



Advertisements
Similar presentations
Proposal for 3D evaluation test plan in VQEG Dec Jun Okamoto (NTT)
Advertisements

WG on Determination of Fluid Loss Screen Life API SC 10 Scott Jennings 25 June, Exploration and Production Standards Conference on Oilfield Equipment.
Dynamic Settling/Stability Workgroup – Summer 2013
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Quality Assurance/Quality Control Policy
Deryck Williams – Chairman Rick Lukay – WG Lead. Develop a technical report on recommended testing protocols for measuring HTHP rheology of cement slurry.
API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler Engineering with Terry Dammel & Joe Day, Schlumberger.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
QA/QC FOR ENVIRONMENTAL MEASUREMENT
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
SPEC 13A Sec. 16 Drilling-grade Starch
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
API 6A 21 st Edition WG Update API Subcommittee SC-6 Plenary Valves and Wellhead Equipment June 19 th 2014.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
7 Due Process Update Evaluation Standards. Evaluation Materials and Procedures.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 7, 2013.
API SC6 Work Group Plan for Development of HPHT Flange Design Requirements Date: June 25 th, 2015.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
19th January 2012 Don Wells (Hess)
Determination of Fluid Loss Screen Life API SC 10 Scott Jennings 2012 Exploration and Production Standards Conference on Oilfield Equipment and Materials.
API Mixing Energy Proposal June 24-28, 2013 Presented by Jim Davison, Ametek-Chandler with Terry Dammel & Joe Day, Schlumberger.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
C63.19 SC8 WG3 meeting, March 26, 2007 Calibration values for dipole validations at new RF probe separation distance of 1.5cm PINS-C item 5.k Jagadish.
Long Term Integrity of Cement Systems Oct 4, 2002.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
How to include additional information in ODV and CDI formats
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Winter Meeting Progress Report.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC19 HPHT Template (Proposed as SC19TR1)
WG on HTHP Rheology Winter 2016, austin, tx
API Mixing Energy Proposal
PMP IWG Progress Report
ITU-R Liaison Group Report - Session #73 Opening Plenary
API SC 10, Work Group 3 Update:
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2016 Summer Meeting Report.
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2017 Summer Meeting Progress Report.
Requirement Change Control Procedure
. - t !!l t. - 1f1f J - /\/\ - ' I __.
Intercalibration progress: Central - Baltic GIG Rivers
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
Cloud mask update K. . Thome NASA WGCV Plenary # 43
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
2016 Exploration & Production Standards Conference Subcommittee 10
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 2017 Exploration & Production Standards
2016 Exploration & Production Summer Standards Conference
Dissertation Progress & Status Report
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Subcommittee on Well Cements (SC-10) Triaxial Mechanical Properties Testing of Oilwell Cements 2018 Winter Meeting Progress Report.
Accredited Standards Committee C63® - EMC
API RP 59 June 2017 Recommended Practice for Well Control Operations
May 10 – 11, 2006 Buzios, Brazil SC4 Chairman Discussion
Presented for ND League of Cities by Pam Sharp, Director of OMB
2016 Exploration & Production Summer Standards Conference
Access to HE Standardisation Event General Session Tuesday, 14th November 2017, 4.00 pm to 7.00 pm.
API SC 10 WG15 Stage Cementing Collars
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Today Members Workgroup charge/ Current Status Discussion.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing
Today Members Workgroup charge/ Current Status Discussion.
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

2017 Exploration & Production Winter Standards Meeting January 17, 2017

Subcommittee on Oil Well Cements (SC-10) Tuesday January 17, 2017: General Meeting WG on Comparison of Atmospheric vs Pressurized Slurry Conditioning for Cements Develop a technical report on recommended testing parameters when atmospheric conditioning is adequate and when HPHT conditioning is necessary. The product of the work should be a procedure to be incorporated into API RP10B-2 for use by field labs in evaluating Fluid Loss, Free Fluid & Rheology.

Methodology

Work Session Review testing matrix Update results status

Testing Matrix

Testing Matrix

Participating Labs

Logistics

Logistics

Logistics

Sample QA/QC

Progress Free fluid testing is 81% completed. Fluid loss testing is 74% completed. Rheology testing is 66% completed.

Preliminary Results (FL)

Preliminary Results (FF)

Forward Plan Finish out data collection. Review raw lab data. Repeat test considering standard deviation of results. Evaluate a less stable slurry to evaluate FF.