Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
Advertisements

Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Sunday 28 Nov. 00h00: Stable beams # x 121 b. Peak lumi 2.0e e25 cm-2 s-1. 09h52: Dump fill # delivered 440 (mb)-1. RCBCH8.L5B1 trip.
Summary Week 47 + Start Week 48
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Summary of week 7 Hardware Commissioning:
Monday 11/07: Recovery Plenty of accesses.
Week 32 Started with luminosity production…
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Barbara Holzer, Jorg Wenninger
Tuesday 22nd January - morning
Summary of Week 11: 14 – 21 March
Summary of Week 16 G. Arduini, J. Wenninger
Mike Lamont, Jorg Wenninger
Saturday 4.12 Beam in the SPS at 09:30 Beam in the LHC at 10:00
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Summary week 29 VdM scans Luminosity production
Sunday morning Recovering from 400 kV disturbance.
Monday Morning – recovery from cryo.
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Tuesday 22 November 2011.
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Contact
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 28 October 2011.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Coordination: Eva Barbara Holzer, Mike Lamont
Friday 15th February - morning
Thursday 20th July - morning
Another Immortal Fill….
Wednesday 26 October 2011.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Wednesday 14:30 Fill 2011 dumped.
Thursday 2.12 Cryo recovery…. Access… RF cavity check (noise) Cav4B1.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Presentation transcript:

Summary of ion week 48 Last beam OP summary of 2010 Week 48 Coordination M.Lamont & J. Wenninger 12/6/2010 LHC 8:30 meeting

Overview Aim of the week was provide integrated luminosity for ions and miss the target of 1-10 mb-1 , Van de Meer scans, complete some remaining MD requests. But the week got disrupted… snow and ice, cryo stop Pt4, ion source refill. 12/6/2010 LHC 8:30 meeting

Overview of stable beam periods Up to cryo/source stop : injection of 4 bunches/transfer From Saturday : injection of 8 bunches/transfer No luminosity record, despite 137 b: smaller b currents + emittance. After VdM scans, injection with constant RF voltage of 7 MV no ghost bunches, mismatch leads to long. emittance growth – beneficial for IBS. Cryo & source 12/6/2010 LHC 8:30 meeting

Overview of ion intensity Note: since Sunday morning the lifetime of B2 has been consistently low (down to 1 hour) in R & S – cause not understood. 137 bunches 121 bunches Cryo & source 12/6/2010 LHC 8:30 meeting

Capture losses RF capture with constant voltage of 7 MV. ~3% capture losses, little 2.5 ns structure. 11/10/2018 LHC 9:00 meeting

Ion summary Integrated luminosity last Monday ~6.5 mb-1. Integrated luminosity now ~9.5-10 mb-1. 12/6/2010 LHC 8:30 meeting

VdM scans – Tuesday 30th November Good conditions, around 1% ghost bunches. 12/6/2010 LHC 8:30 meeting

Cryo stop Cold compressor stop in Pt4 Thursday around 01:30AM. Signature of the problem was indicating a possible damage to the cold compressor. Expert intervention required on Thursday morning. Eventually the controller for the Magnetic Bearing was replaced. Restart of the compressor Thursday around midday. Cryo conditions in Pt4 were reestablished Friday morning 10:00AM. 12/6/2010 LHC 8:30 meeting

LHC Cryo global availability – S. Claudet Results for 2010 above expectations, thanks as well to periodic technical stops On tracks for a nice finish !!! (Text few weeks ago) Powering tests Learning spring Fantastic since summer ! New challenge is to prepare for MASSIVE Helium transfer to storage, maintenance, RRR … 12/6/2010 LHC 8:30 meeting

Ion source In the night from Thursday to Friday the ion source intensity decreased rapidly, indicating the end of the (refill) lifetime. The 2 ovens were refilled Friday morning. Beam was back in the SPS Saturday morning at 09:30, in the LHC at 10:00. 12/6/2010 LHC 8:30 meeting

Powering In particular after the cryo & source stop, and despite careful checks and pre-cycles, we suffered from a series of powering problems. Over the weekend, we lost 2 QHPS. In both cases MP3 suggested to continue operation with the missing QHPS, OP being in charge to make sure that no other PS discharges during operation. Saturday night: the missing QHPS on MB in 27R5 was eventually fixed in the shadow of another access for RQ6.R5. Sunday night: lost one QHPS on MB in 32R8 – we are presently operating without this QHPS. This mode of operation will be used in 2011 to reduce number of interventions – with some HW protection. 12/6/2010 LHC 8:30 meeting

Today Last fill 1540 in stable beams since 04:00. Last refill of the year after this meeting. And then…. 12/6/2010 LHC 8:30 meeting

So long and thanks for the fish ! Thanks to all for the hard work ! Today at 18:00 in the CCC we celebrate the last beam of 2010 ! 3x1025 No quench ! 25 MJ 2x1032 12/6/2010 LHC 8:30 meeting