CESSP Phase 1 Essential project information.

Slides:



Advertisements
Similar presentations
1 Future strategy for e-submission as seen by industry Dr Michael Colmorgen, IFAH-Europe 2nd Veterinary Workshop on E-submission 4 Dec 2009, EMEA, London.
Advertisements

Coursework.  5 groups of 4-5 students  2 project options  Full project specifications on 3 rd March  Final deadline 10 th May 2011  Code storage.
Data Management and Analysis 1 Consumer Behavior Studies Plan Development and Assistance (Technical Advisory Group) SGIG/SGDP Build and Impact Metrics.
Health Insurance Oversight System (HIOS)
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
The Gateway What is the Gateway? Gateway Options
4.1 Blended approaches: Information Engineering IMS Information Systems Development Practices.
©2014 Factorytalk Co., Ltd. Proprietary and Confidential eCTD Specification 17 July 2014.
Submission rules before mandatory use: There is no change to the existing submission rules for submissions to NCAs Submission to PSUR Repository is recommended.
EFPIA EFPIA IT Proposals ppt Slide 1 EFPIA Proposals for IT Support to the European Regulatory Procedures Mr S. Hasler EFPIA PAT Regulation 2000.
IAEA International Atomic Energy Agency Agenda item 3.3 INIS IT developments 13th INIS/ETDE Joint Technical Committee Meeting October 2011, Vienna,
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
The Challenges of Implementing Multi- platform IT Systems across the AO Function Nicola Cartwright Head of Awarding Systems and Services 1st4sport Qualifications.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
GPO’s Federal Digital System August 17, 2010 U.S. Government Printing Office.
1 October 16, 2015 Iowa County Land Record Information System (CLRIS)
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Agenda Overview and Status of Implementation Speaker: Georg Neuwirther (AGES, chair eAF MG) Processing the eAF for initial application Speaker: Kristiina.
CTD Dossier Preparation K. Srikantha Reddy Sr
LG DATABASE AND REPORTING SYSTEM (LGDRS) 8-9 September 2015
XBRL for regulatory reporting in Belgium Camille Dümm Central Balance Sheet Office (CBSO) Update on the CBSO latest developments and related projects.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
SAPRAA 5 Sept 2008 eCTD An overview of the full day presentation by Dr Olaf Schoepke at the SAAPI conference in July 2008.
Research and Innovation REPORTING and PAYMENT (in practice) v
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
Swissmedic Swiss Agency for Therapeutic Products Hallerstrasse 7 CH-3000 Bern From Step 2 to Step 3 of the eCTD Introduction 2nd Follow-up.
Swissmedic Swiss Agency for Therapeutic Products Hallerstrasse 7 CH-3000 Bern Swissmedic’s future steps 2nd Follow-up Information Meeting.
Metadata V1 By Dick M.A. Schaap – technical coordinator Oostende, June 08.
© Copyright IBM 2007DIA ERS SIAC Presentation, January 2008 The HL7 RPS and SPL Standards - A High Level View Terry Hardin Sr. IT Architect Emerging Software.
Validation of Metadata XML files SeaDataNet Training, June 2008 Presented by with contributions from Karen Vickers (BODC) Presented by Michèle Fichaut.
PHC Meeting the global challenge of unique identification of medicinal products SMS, RMS and OMS : Common Terminologies for enabling ISO IDMP.
An agency of the European Union EU ISO IDMP Roadmap to enable eprescription cross-borders Towards a trans-atlantic solution to univocally identify medicinal.
Auditor’s report on XBRL-based financial statements in the Netherlands November 6, 2015.
How to complete an eAF based on version 1.20
Statement of Intent Background CESSP Phase 1 - implementation
Avoiding Redundancy in the Management of Technical Documentation and Models: Requirements Analysis and Prototypical Implementation for Enterprise Architecture.
RMS & OMS Update to SPOR change liaisons
Periodic Safety Update Reports (PSUR)
Presented by Martine Deprez Head of Unit, EC - SG/A1 – Development and Advice Carine Smets Team Leader e-TrustEx Business – EC - SG/A1 – Development.
IDMP Update for Bayer 22nd March 2017.
User Guide PrimePortal – File Archive
SPOR webinar: Using OMS & RMS data in eAF
EudraCT Public information on Clinical Trials - update
eSubmission Web Client – XML delivery files
Content & the Supply Chain
eSubmission PSUR XML Delivery File
Updated eSubmission Roadmap (v.2.1) Adopted by HMA on
R4BP 3.9 key users testing Introduction 4-5 May 2017 Roberto Gilioli
Lisa Ruff Business Productivity/Accessibility TS Microsoft Federal
European Citizens’ Initiative, Commission regulation proposal Focus on IT aspects Jérôme Stefanini DIGIT.B.2 05/06/2018.
Increased Efficiency and Effectiveness
Gibraltar Financial Services Commission
eSubmission Web Client XML delivery file – new functionality
EU SUBMISSION BY Haripriya & Revathy.
CESSP Phase 1 Essential project information.
Business Cases and Advantages of eCTD v4.0
Amendment Invoice Task Force Progress Report
Delivery of Solutions Information Management
ETS – Air Data submission Training
e-Invoicing – e-Ordering 20/11/2008
WP 4 - Revision of Natura 2000 dataflow
Amendment Invoice Task Force Progress Report
The process of collecting data for monitoring the progress of SOPHRD related to data protection Management Authority for the Sectorial Operational Programme.
National Commission for Nuclear Activities Control
10th Annual Air Quality Governance Lekgotla
Reportnet 3.0 Database Feasibility Study – Approach
Updated eSubmission Roadmap (v2.2) Adopted by HMA on 21 June 2019
Manage Sourcing - Supplier
STANDARD ACCOUNT: SOLUTION QUICK GUIDE
Module 1.1 Overview of Master Facility Lists in Nigeria
Presentation transcript:

CESSP Phase 1 Essential project information

Statement of Intent Background CESSP Phase 1 is the first project towards the implementation of the Common European Single Submission Portal (CESSP). This project will deliver a new implementation for creation of Marketing Authorisation Application forms with the goal to replace the relevant PDF forms with a web based interface. This will cover human and veterinary application forms for new marketing authorisations and extension applications. The system was earlier referred to as the CESSP but will be implemented within the current CESP as a new module called CESP Application Dataset Management Module (CESP Dataset Module). However, the project is referred to as CESSP Phase 1. The main objective of CESSP Phase 1 is to provide a modern user interface with a flexible technical platform for the future. This step will enable future enhancements which would not be possible using the current PDF technology. CESSP Phase 1 is planned to be followed by the addition of the Variation and Renewal form to the CESP Dataset Module. CESSP Phase 1 – essential project information

Statement of Intent CESSP Phase 1 - implementation The first implementation project step, CESSP Phase 1, will deliver a user interface to make use of integrated human and veterinary Marketing Authorisation Application datasets for new marketing authorisation and extension applications. It is expected that the first version of the system will be available for use in Q1 of 2019 and will be based on eAF version 1.23 (new version as of July 2018). The current eAFs will be withdrawn after a 6 months transitional period and then the use of the new CESP Dataset Module will become mandatory. CESSP Phase 1 – essential project information

eSubmission Roadmap - Version 2.1 (28.02.2018) Source: http://esubmission.ema.europa.eu/tiges/cmbdocumentation.html CESSP Phase 1 – essential project information

Application Form – Past and Future Marketing Authorisation Application form (human) Marketing Authorisation Application form (veterinary) Renewal form (human and veterinary) Variation form (human and veterinary) for decentralised, mutual recognition, national and centralised procedures Word form Free text only Copy/paste only (error prone) No validation rules No data export / import eAF - PDF Higher data quality Free text reduced to minimum Controlled terms are mandatory Context-dependent structured layout with built-in business rules Built-in form validation Data export / import CESP Dataset Module – web based application Improved usability and performance Fundamental change of data collection concept Use of SPOR master data   replaced 2012-2016 stepwise replacement planned from 2019 CESSP Phase 1 – essential project information

Overview of the CESSP Programme and ongoing Phase 1 10 November 2018 Overview of the CESSP Programme and ongoing Phase 1

CESSP programme Project CESSP Phase 1 is ongoing for replacement of the eAF MAA Human and Vet Online application dataset module available in Q1 of 2019 Further implementation phases – not yet started Project CESSP Phase 2 – not yet started Replacement of the eAF for Variation and Renewal CESSP programme also monitors other initiatives (including Vet-Regulation, SPOR) to ensure compatibility and future improvements 6 CESSP Phase 1 – essential project information

IT supported data upload anticipated CESSP - Process flow manual data entry /update IT supported data upload anticipated applicant level CESP Application Dataset Management Module “Dataset” creates integrates SPOR CESSP phase 1 will use data from RMS and OMS (R and O in SPOR) in a way that referentials and optionally organisations can be selected during the authoring process. CESSP Phase 1 – essential project information

Concept of data use “Dataset” Human readable application data Electronic data format for automated data import “Dataset” The dataset contains information to be used in the application form and might also be reused for other purposes Draft cover letter, Draft EMA formatted table template CESP delivery file CESSP Phase 1 – essential project information

Future process after implementation of CESSP Phase 1 10 November 2018 Future process after implementation of CESSP Phase 1 CESP EMA Gateway Submit Dossier Finalise dossier submission CESP Application Dataset Management Module Start and Finalise Dataset (eAF etc.) Process submission EMA/ NCA eAF PDF (human and machine readable format) Dataset SPOR CESSP Phase 1 – essential project information

Essential functions implemented by CESSP Phase 1 at applicant level Download dataset Applicants need to put this dataset into eCTD sequence (or VNeeS or NeeS) CESP Dataset Module Create/save/modify/export/import datasets Retrieve OMS and RMS (SPOR data) Validate data completion and business rules View dataset in human readable layout Export the eAF for use in submissions XML-upload manual data input or at NCA/EMA level Dataset View the eAF via PDF Import dataset into NCA databases Data import readable representation View dataset via stylesheet (getting rid of PDF requires commission decision) http://www.w3schools.com/xml/tryxslt.asp?xmlfile=simple&xsltfile=simple 10 CESSP Phase 1 – essential project information

CESSP Phase 1 - Out of scope The CESP Dataset Module is not a long term repository for datasets CESSP Phase 1 does not replace variation and renewal forms Datasets created in the CESP Dataset Module will not be completely compatible with IDMP-standards View dataset via stylesheet (getting rid of PDF requires commission decision) http://www.w3schools.com/xml/tryxslt.asp?xmlfile=simple&xsltfile=simple 11 CESSP Phase 1 – essential project information

CESSP Phase 1 - Project Organisation & Milestones 10 November 2018 CESSP Phase 1 - Project Organisation & Milestones

Project Organisation CESSP Implementation team CESSP Full Group Sponsor ITDEC PM: Georg Neuwirther Noel Diamant Anne Christine Lantin Karin Gröndahl CESSP Implementation team Kevin Horan Klaus Menges Gary Wilson Karin Gröndahl Mathilde Geynet Sonja Königshofer Hanna Palyszka Virginie Bacquet Jose Simarro Anne Christine Lantin Stefanie Huber Mathilde Geynet Alenoosh Abedi Manuela Copier Dalle Frederic Gary Wilson Beate Gasser Victoria Girones Jeroen Veen Paola Kajaste Anne Christine Lantin Leigh Sandwell Karin Gröndahl Manuela Copier Sabina Uzeirbegovic Martin Simicek Alastair Nixon Remco Munnik Zigmars Sebris Noel Diamant Christelle Bouygues EMA IT Virginie Woerly Laurent Desqueper Klaus Menges Gary Wilson Dagmar Sommer Data and Requirements Documentation Monique Lanson Christelle Exbrayat Jose Simarro Sonja Königshofer Guidance Documents/ Regulatory Focus Group Lee Bridgen legend NCA, EMA Industry External Marja van Schie IT Development & Technical Support Communication and Training CESSP Full Group

Milestones UAT 1 - completed 05/2017 UAT 2 - completed 03/2018 UAT 3 - to be confirmed Go live - planned in Q1 of 2019 Mandatory use of CESP Dataset Module and - 6 months after go-live terminating use of current eAF for initial application CESSP Phase 1 – essential project information

10 November 2018 Contact Kristiina

For any question about the project please contact: cesspproject@hma.eu CESSP Phase 1 – essential project information