MT Division BMAZ Bangalore

Slides:



Advertisements
Similar presentations
Digital Current Transformer Reporter
Advertisements

Partnerships in Power Franchisees
CURRENT TRANSFORMERS AND VOLTAGE TRANSFORMERS
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
C&I Systems, Kota C and I Calibrations Pvt. Ltd., Jaipur
GRID PARALLELED kWp ROOF TOP SOLAR PV SYSTEM AT AVANT-GARDE AVANT-GARDE.
Availability Based Tariff Meter
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
MTE´s Portable Product Portfolio
GlueX Solenoid Recent progress and Coil cold tests Paul Brindza September 9, 2004.
Type of Meter Single phase meter used for sanctioned load up to 10 KW Poly Phase meter……….used for sanctioned load from 11 KW to 25 KW LT CT meter.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
By Dalip Singh, President, AEE Delhi Workshop for Electricity Consumers On 25Apr 2015 at NMA, Sector 62 Noida.
CheckMeter 2.3 Portable Working Standard Page 1 March 2009.
A PRESENTATION ON SOLAR WIND HYBRID SYSTEM BY. BACKGROUND For remote and inhospitable areas – Reliable Electricity supply is not available.
CALPORT 300 Three-Phase Portable Reference Standard
PowerLogic® E5600 power and energy meter 1.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
PPS 3.3 C Portable Power Source Page 1 January 2011.
1. Metering philosophies adopted in SR a.Generally the HV side of ICTs b.Some places the line side c.Tertiary loading of transformers is done at POWERGRID.
Power Line Carrier Communication based Automated Meter Reading System
10-11-November, 2010 Organised by
Radian Research, Inc. Radian Research, Inc. an employee owned company Power and Energy Measurement Specialists 3852 Fortune Drive.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Aug 2015 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Oct-2013 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Metering Regulations alka NPTI, PSTI Bangalore. 1. Short title and commencement. These regulations may be called the Central Electricity Authority (Installation.
Energy Metering Advanced Technologies & Futuristic View Presented By G.Vinaya Kumar, BE(Hons), MIE Director (Operation), CPDCL Retd.
PTS 2.3 C Portable Test System Page 1 March 2009.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
CheckMeter 2.1 Portable Working Standard Page 1 March 2009.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Interconnected Generation Preliminary Engineering Work Related to Fees.
CORP3397 Clarification Meeting Technical Evaluation of Meters Enquiry Date: 5 February 2016 Presenter: Mohamed Omar.
How to Fix Bitdefender Total Security Error -1022? Support Number
PE Systems Pvt. Ltd. Bangalore
Lesson 7: Power and Energy Measurement
VMCL ELECTRONIC DIVISION.
Open Access Power Purchase
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
Items to consider before automating an application
Issues and Intervention required - Karnataka
POWER FACTOR CORRECTION
ENERGY METERS DME SERIES
CHAPTER 6 SPECIAL TRANSFORMERS Electrical Machines.
Portable Working Standard
PTS 3.3 C Portable Test System.
Content * Overview * Project overall * PF meter * Calculation of firing angle * Generation of firing angle * Results * Comparison * Problems.
Presented by: Samantha Walkow, Tasha Coughlin & Theresa Angus
Monday, Apr. 13th p. 242, 243.
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Date of download: 3/6/2018 Copyright © ASME. All rights reserved.
Infinite exciting times…infinite possibilities..
HOW TO FIX QUICKBOOKS RUNTIME ERROR ON WINDOWS 10?
SAP UNDER IPDS SCHEME.
Indian Grid Code and Commissioning Test Procedure Dr
Customer Woolworths PLC Application Building Management Sector Retail
Solar City: Effect of Solar Technologies on Network Performance
Protection Philosophy
METER SPECIFICATIONS.
Financial Energy Management System (FEMS) Re-engineered by IT Department IT, H.O. Mumbai. 26 November 2018.
Material Requirements Planning (MRP)
NIRANTHARA JYOTHI SCHEME
TARIFF STRUCTURE OF HPSEB
(State Minister Industries)
MT LAB, BMAZ PROGRESS Nos Testing f
PowerLogic™ offer for the basic metering market
-BY H R PATEL DE HILLDRIVE SDN BHAVNAGAR CITY 2 DIVISION
Presentation transcript:

MT Division BMAZ Bangalore 11/10/2018 MT Division BMAZ Bangalore MT Hi-Tech Lab (ISO 9001:2008 Certified)

Technical Activities Testing of Various Meters:- 11/10/2018 Technical Activities Testing of Various Meters:- Single Phase Static Meters LT Three Phase Static Meters HT Three Phase Static Meters 2. Testing of CT/PT’s

Test Equipments Available 11/10/2018 Interface Software used for testing of meters – CamCal. Details 3 Phase Meter testing Single phase Meter Testing CT/PT testing Make MTE, Germany Eltel systems, Doddaballapur, Bangalore Accuracy Class 0.02s 0.005 – CTs 0.05 – PTs Date of commissioning 10-7-2009 6-3-2014 Test positions 10 40 01

Various tests conducuted 11/10/2018 I. Meters :- (As per IS 13779 & 14697) 1, Accuracy test at different Loads and Power factors 2. Starting current test. 3. No load test 4. Meter constant test . II. CT/PTs : (As per IS 2705 and 3156) 1. Accuracy test w.r.t. Ratio error 2. Accuracy test w.r.t. Phase angle error

Duration of testing and Testing fee details 11/10/2018 Duration of testing and Testing fee details Sl No Description Time Required (Testing and Meter fixing and Releasing) Test fee in Rs (for meters purchased by consumers only) 1 Single Phase Uni-directional Meter (40 Meters at a time) 1 Hr 30 Min. 100 / meter 2 Single Phase bi-directional Meter 3 Hrs to 4 hr 200 / meter 3 LT 3 phase uni directional Meter (10 Meters at a time) 1 Hr 1000 / meter 4 LT 3 Phase bi directional Meter 2 Hr 30 Min 1800 / meter 5 HT uni directional Meter 2 Hours 1000/meter 6 ABT featured HT bi-directional Meter (10 Meters at time) 4 Hours 2400 / meter 7 Current Transformer (One CT at a time) 5 Min 600 /CT 8 Potential Transformer (One PT at a time) 400 / PT

Physical Progress of Meters tested – Last 4 years 11/10/2018 Physical Progress of Meters tested – Last 4 years Sl. No Meter Type No. of Meters tested and Sealed 2011-12 2012-13 2013-14 2014-15 2015-16 (UPTO Apr) 1 LT Three Phase Whole Current Energy meters (5-30A) (Meters sealed) (Retail outlet/sBESCOM stopres) 42817 45918 41598 47093 3500 2 LT Three Phase CT Operated Energy Meters (- /5A) (Retail outlet/stores) 11700 7199 8567 9133 3 HT Meters (purchased by consumers) 1075 1572 1397 1446 138 4 Single Phase Static Meters (Retail outlet and Stores) 11733 2378 6397 12649 544 5 Solar roof top 3 ph meters 23 11 6 Solar roof top single Ph meters 19 7 RAPDRP secure meters HT CT operated 4894 8 Prepaid meter (3 ph and 1 ph) 3430   Total Meters/Sealed 67325 57067 57959 78687 4204

Physical Progress of CT/PT’s tested (Since 23-5-2014) 11/10/2018 Physical Progress of CT/PT’s tested (Since 23-5-2014) Description 2014-15 2014-15 (Upto Apr) Total No. of HT CTs 4222 464 4686 No. of HT PTs 3662 408 4070 No. of LT CTs 45