Place image in this area.

Slides:



Advertisements
Similar presentations
For Missouri Commission PLEXOS Q&A for Missouri Commission.
Advertisements

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
Sourcebook for Hydrogen Applications Expansion & Dissemination Jeffrey Serfass General Manager Partnership for Advancing the Transition to Hydrogen APEC.
 Not Just a Collection of “Fill in the Blanks” Templates  Organized by Business Process  User Needs Assessment  Request for Proposal (RFP)  Vendor.
December 10, 2007 Multi-family Residential Unit Audits - Garden Apts and Smaller housing stocks1 Multi-Family Residential Unit Audits Garden Apartments.
Financial Data Calculator© Produced by: Mathematical Investment Decisions, Inc. 95 West Gate Drive – 2 nd Floor Cherry Hill, NJ Web site:
Urban Planning Applications of GIS GIS can be applied to many types of problem. Among these are representatives of both raster and vector data base structures,
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm VP, Director Lean Enterprise Consulting February 22, 2010.
What is it? New web application and analysis program designed to help partners increase the efficiency of the software asset management process, drive.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Chapter 5 Initiating and Planning Systems Development Projects
Chapter 7 DESIGNING A DECISION SUPPORT SYSTEM Decision Support Systems For Business Intelligence.
TEMPUS IV- THIRD CALL FOR PROPOSALS Recommendation on how to make a good proposal TEMPUS INFORMATION DAYS Podgorica, MONTENEGRO 18 th December 2009.
CSI315 Web Applications and Technology Overview of Systems Development (342)
Chapter 5 Engineering Tools for Electrical and Computer Engineers.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
Thomas DEGNER -DE- BETA SESSION 4b: Integration of RES+DG Barcelona May DISPOWER Distributed Generation with High Penetration of Renewable.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
RENESENG Kick-off Meeting Athens, November 2013 Sara Giarola Mayank Patel Prof. Nilay Shah Centre for Process System Engineering Imperial College.
Martin Kokonya ENERGY PROJECTS IDENTIICATION AND ANALYSIS TOOLS ADB FINESSE Training Course on Renewable Energy and Energy Efficiency for Poverty Reduction.
Chapter 6 : Software Metrics
Kingdom of Bahrain Civil Service Bureau Position Classification.
Service Transition & Planning Service Validation & Testing
AWAST final meeting - Brussels december 2003 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
© ABB Inc. - USETI All Rights Reserved 10/17/2015 Insert image here An Economic Analysis Development Framework for Distributed Resources Aaron F. Snyder.
Technology Transfer Execution Framework. 2 © 2007 Electric Power Research Institute, Inc. All rights reserved. Relationship Between Your EPRI Value and.
Cerion Optimization Services, Inc Dallas Parkway, Suite 404 Frisco, TX USA Optimiser TM Product Introduction This.
MED-Impact Decision-support instrument to promote renewable energy investments in the Mediterranean
Financial evaluation 9 March Financial Feasibility Assess the ability of the utility or developer to meet the financial obligations associated with.
Formulating a Simulation Project Proposal Chapter3.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Chapter 6 Prototyping, RAD, and Extreme Programming Systems Analysis and Design Kendall & Kendall Sixth Edition.
Progress Meeting - Vienna - June 2001 Aid in the management and European comparison of Municipal Solid WASte Treatment methods for a global and sustainable.
IBP Simulation Tools Workshop Wageningen, June 2 nd Simulation Tools – Workshop4 Report.
Renewable Energy Project Analysis Course - Module 1
Peter Larsen and J.P. Carvallo Lawrence Berkeley National Laboratory Data Working Group ■ August 4, 2015.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
CENTRAL EUROPE PROGRAMME PROJECT DEVELOPMENT FINANCIAL ISSUES Project development seminar Prague, 1 st February 2010 Luca FERRARESE JTS CENTRAL.
CMMI Certification - By Global Certification Consultancy.
Accounting systems design & evaluation 9434SB 18 March 2002.
Background Data Centre (DC) energy consumption doubled between 2000 and 2005 and grew by 50% from 2005 to 2010, consuming 1.5% of global primary energy.
Sensing and Measurements Tom King Oak Ridge National Laboratory April 2016.
Banner Project Overview February 24, Presentation Objectives:  What is the Banner Project ?  When are we doing it ?  How will we do it ?  Who.
TOPSpro Special Topics VI:TOPSpro for Instructors.
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Chapter 5 Initiating and Planning Systems Development Projects
Sourcing Event Tool Kit Matrix Pricing & Tiered Pricing User Guide
Seminar On Energy Audit Submitted To: Submitted By:
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
APEC 21st Century Renewable Energy Development Initiative
System Design.
Project Title Presented By Student1 name - Roll no
L’asset management appliqué aux Chemins de Fer
Place image in this area.
Closed Loop Wind Farm Control
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
Chapter 5 Initiating and Planning Systems Development Projects
Engineering Tools for Electrical and Computer Engineers
QuickScore Overview.
RECARE set-up Rudi Hessel on behalf of coordination team
Fiscal Year Budget Plan
Good practice in preparing an application
Chapter 5 Initiating and Planning Systems Development Projects
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
The ultimate in data organization
Opportunities for Local Energy
Presentation transcript:

Place image in this area. TK RENEWABLES WPT2 EIBHLIN MARSH & KIERAN MC LAUGHLIN Place image in this area.

TK RENEWABLES GENCOMM MEETING 27TH JUNE 2018 STORNAWAY

Objective: To develop a Financial/Commercial Decision-Making Model to be used to project, evaluate and optimise the financial performance of zero/low carbon/SMART community scale hydrogen systems across the North West Europe (NWE) region.

METHODOLOGY Initially use public data to create the model Develop on a common platform Validate using the data from the 3 Implementation work packages Develop a workplan for approval by Gencomm partners

PLAN FORMAT - Content and duration of project activities - Start up activities – early adopter group, demo data agreed etc. - Content and duration of project activities - Information collection tools - Data analysis process and rules - Additional market data activities - Development of data templates - Skills and abilities required to undertake the work - Development of input/output templates - Validation steps - Activities and Resources

DATA REQUIREMENTS INPUTS For each of the 3 implementation workpackages the following parameters will be defined The technical operating parameters and specifications The electricity costs for a range of sizes of plant Curtailment factors Equipment operational life Capital and operational costs for agreed size ranges Hydrogen Production Equipment Hydrogen Distribution Equipment Hydrogen market Values per region

DATA REQUIREMENTS OUTPUTS As examples the outputs from the model will likely include: Calculated cost of electricity by technology Calculated cost of hydrogen per kg Total System Capex Total System Opex Volume of hydrogen per day/per annum Assessment of viability to supply certain hydrogen markets Communication plan for engagement with potential users

VALIDATION Upfront discussions will be held with the 3 Gencomm demonstration sites to identify and request the required data to allow validation of the model Testing with the early adopter group and undertake any modifications to ensure the points made by the early adopter group are addressed

DEVELOPMENT There are a number of existing Financial Models in use today but many are quite complex and can be too cumbersome. MARKAL Model – MARKet Allocation simulates the market for energy technologies. TIMES model – The Integrated MARKAL-EFOM System which is a combination of models TIAM model – TIMES Integrated Assessment Model All are interesting but too global in scale for our project

DEVELOPMENT The required system needs to be able to make performance predictions and cost-of-energy estimates for all 3 technologies within this project namely wind, solar and AD which are based on installation and operating costs and system design parameters which have been specified as inputs to the model. .

DEVELOPMENT We will be designing and developing a bespoke model similar to the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory based in the USA. Development will be using Visual Basic Excel software.

DEVELOPMENT The SAM model is a good example of what a comprehensive model should look when complete. The following screen shots are examples of the type of basic information the GENCOMM Financial will display when complete.

Graphs and Charts on the Results page displays graphs of results that you can easily export to your documents.

Graphs and Charts on the Results page displays graphs of results that you can easily export to your documents.

In this screenshot, you can see several rows of the cash flow table for a 10-megawatt utility-scale project with a two-partner flip financial structure.

TIMING These are the types of results which we intend to have available as part of our model outputs.

TIMING The validated model will be operational by March 2019.