THE MESA Accelerator Kurt Aulenbacher, LEPP workshop,

Slides:



Advertisements
Similar presentations
Cyclotron Refurbishing & Development Meeting March 6, 2008.
Advertisements

Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
ATLAS Intensity and Efficiency Upgrade ATLAS USERS MEETING Speaker: Mike Kelly Physics Division May 15, 2014.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
February 21-21, 2008JINR Scientific Council 103-d session IREN project status.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
WG2: Beam Dynamics, Optics and Instrumentation – Summary
SRF Operating Experience at JLab
An Electron source for PERLE
Muon Ionisation Cooling Experiment Overview
Beam Commissioning Adam Bartnik.
PETRA III, Status and Upgrade
at STFC Daresbury laboratory
Uppsala Commitment to ESS and FREIA Planning
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hosting Orsay Walid KAABI
Overview MESA SRF system and machine design
Overview of LERF Status, Plans and Goals
Adriana Rossi, Sergey Sadovich
DC Injector and Space Charge Simulation Status
Joint Accelerator Research JGU & HZB
ESS RF Development at Uppsala University
Instrumentation CALIFES ideal for tests and development that requires frequent access to test setup. CERN BI members already using CALIFES and want to.
UK RFD Pre-Series cryomodule
Introduction to Experimental Site Axion Mainz
MESA project status MAGIX workshop February, Kurt Aulenbacher
Electron Polarization In MEIC
Accelerator Layout and Parameters
CEBAF Injector Overview
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Status of the VEPP-2000 Collider Project at Novosibirsk
Operational Experience with the Cornell ERL Injector SRF Cavities
LCLS Injector: Introduction D. H
The MESA-Project and itS electron Polarimeters
SCRF for cw operating XFEL
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
Advanced Research Electron Accelerator Laboratory
Cryomodules Challenges for PERLE
Physics Design on Injector I
Summary of Washington DOE Review
Laser Und XFEL.EU Experiment
Andrew Hutton Concept suggested independently by Haipeng Wang
East Hall under construction
Presentation transcript:

THE MESA Accelerator Kurt Aulenbacher, LEPP workshop, Mainz, April 04, 2016

Outline Impact of CFP: new MESA lattice & timeline MESA assembly strategy 11.11.2018

New challenges for the MESA facility…. Initial „Plan A“: Use existing building for 0.15mA 155 MeV polarized external beam (P2) and 1mA, 105MeV (later: 10mA) unpolarized beam for „pseudo internal“ windowless target experiment “Plan A” (summer 2014) 11.11.2018

New challenges for the MESA facility Today: Accelerator parameters unchanged BUT: increased number of proposed experiments, with also increased space requirements & additional boundary conditions  space extension (and change of accelerator lattice) almost unavoidable: „Plan B“ 11.11.2018

The new research buildings (Forschungsbau): “Centrum für Fundamentale Physik”, CFP Plans and budget for underground building had been worked out April-November 2014. final CFP application submitted in 12/2014 CFP-office/laboratory building, probably adjacent to HIM building CFP-Underground building extends MESA-facility („MESA Experimentierhalle-1“) Funding recommended by german science council („Wissenschaftsrat“) in March 2015 Official funding granted by federal government end of June 2015 11.11.2018

PLAN “B” (April-Oktober) The CFP-based MESA lattice aka “Plan B” – science& site advantages 4 # =hall number 3 2 OLD MAGIX NEW (u-CFP) P2 1 Beam dump building used BDX ideal More space for MESA! Hall-4 available for future experiments… BDX D. Simon

PLAN “B” – interference & transport issues 1 P2 does not interfere significantly with MESA-operation! 2 Beam dump shielding is strong enough 3 Cryomodules can be transported in/out of hall 1 3 4 2 4 P2 arc and MAGIX arc close, but they are at different elevations 3,8 m diameter solenoid coil can be put in place 5 5 D. Simon

A few words concerning hall 4 Hall 4 fire protection situation will be resolved when CFP ready No new breakthroughs in wall between halls 3 & 4 advisable... ...but can be used with external beams from MESA AND MAMI 4 3

Civil Construction: ….a very complex enterprise Building „ready“

Quantum of solace… Extended time scale enables: More thorough design of „conventional“ components: lattice, magnets, vacuum system, control system, diagnostics amm)  This will not lead to project delay! Project more stable wrt to lead time escalation Testing of components under realistic Conditions ( even with Ibeam >1mA !) is POSSIBLE! Cryomodules can be tested at HIM experimental site (albeit without beam)! „MESA Assembly Strategy“

InstrumentationBunker MELBA MAMBO MEEK-1 MEEK-2 155 MeV Dump 5 MeV Two- floor InstrumentationBunker MELBA: MEsa Low –energy Beam Apparatus MAMBO: MilliAMpere Booster MEEK: Mesa Elbe-Enhanced-Kryomodule MARC: MESA (recirculation) ARC MARC 1,3,5 MARC 2,4 PLAN “B” – accelerator components

MESA assembly Strategy STEP-1: MELBA Components to be operated with beam: STEP-1: Assembly of MELBA (MEsa Low Energy Beam Apparatus) in 2016 MAGIX P2 Hall-3 is presently being made available for intermediate set-up!

MESA assembly Strategy: Step-2: Operation of MAMBO „Milliampere Booster“ (MAMBO) av. 2017 first two sections operational 2017, other two tested P2 MAGIX

MESA assembly Strategy Step -3: Cryomodules MEEK-Kryomodules will be tested at HIM in 2017 P2 MAGIX

MESA assembly Strategy: Operation of MAMBO with Ibeam >1mA in Hall-3 fixed b (MAMBO-2) graded b (MAMBO-1) chopper/ buncher a-magnet 2 MARC-0 Spin rotation 6d beam characterization + dump Injection chicane Source & a-magnet 1 Exp.-Halle MESA 3 15m

Assembly of MELBA (MEsa Low Energy Beam Apparatus) in summer 2016 (all parts shown in picture are in house) Load lock system Electron Source „STEAM“ transport S. Friederich Solenoid Quadrupoles Scanners Differential pumping V. Bechthold Robust Photocathodes with QE=15% (45mA/Watt)at 400 nm: available!  1mA can be generated with laser from a blue ray disc player I

Polarisation Matching Vacuum Source STEP-1: Assembly of MELBA (MEsa Low Energy Beam Apparatus) until early 2017 „Start to end“ Simulation predicts for 100keV beam: -Compatibility with spin rotation Sufficient beam quality for injection into MAMBO with 1pC bunches (=1,3mA) Polarisation Matching Vacuum Source C. Matrejcek

Polarisation Matching Vacuum Source STEP-1: Assembly of MELBA (MEsa Low Energy Beam Apparatus) in 2016 Blue ray disc laser and longitudinal diagnostics already tested…. Polarisation Matching Vacuum Source I. Alexander Longitudinal diagnostics at Bunch charges corresponding to > 1mA average current

Conclusion CFP building enables good conditions for initial experiments & …… enables new ones & …. Potential for completely new projects .. but considerable extension of timeline by ~ 3 years . Assembly strategy foreseen for accelerator components during time of civil contsrruction, test withs high intensity beam of preaccelreator planned Cryomodule tests in new HIM building

Thank you for your attention!

Exp.-Halle MESA 3 15m fixed b graded b chopper/ (MAMBO-2) (MAMBO-1) buncher a-magnet 2 MARC-0 Spin rotation 6d beam characterization + dump Injection chicane Source & a-magnet 1 Exp.-Halle MESA 3 15m

Not favorized, too small time window injection chicane MEEK injection arc graded b chopper/buncher a-magnet 2 spin-rotation Task 3: add MEEK ???? Not favorized, too small time window Kryomodules will be tested after delivery (without beam) at HIM site a-magnet 1

MESA assembly Strategy Step -3 HIM building ready for occupancy in 4/2016! Large area clean room for cavity assembly Großgeräteantrag (high pressure water rinsing, ultrasonic bath,…) of 1,6M€ submitted to DFG. Helium transfer line from L280 to HIM is installed Bunkered test stand will be installed, starting from 5/2016 2K pump (SAC) (4g/s) tendering starts this month!  Expect to be ready for testing in HIM in 5/17! P2 MAGIX Possibility to visit HIM either in the Lunchbreak oder this evening!

Strategy & timeline 2015-2020: Use ExHall-3 until ~6/2018 : demonstration of high current injector operation (Full MELBA +two modules of MAMBO+ MARC-0) Test all other Rf/SRF components with full field Upgrade of L280 in 16/17 (cash-flow!) Use 16/17 for preparing tendering of MARC-Magnets and 8g/s SAC, (delivery 2019?) other conventional components (vacuum, support structure) also in 18/19 Cryogenic line installation only after building ready! Virtually all components should be delivered and tested before CFP-building is ready!

Long range initiatives 11.11.2018

InstrumentationBunker MESA-Scientific staff, Post-Docs & PhD students How to maintain? Staff: K.Aulenbacher (project leader, MELBA,), F. Hug (MEEK, beam dynamics), R. Heine (MAMBO), M. Dehn (control, diagnostics), J. Diefenbach (radiation protection, feedbacks) Post-Docs: L. Hein (Beam dynamics) F. Schlander (SRF, left 1/2016 to ESS) n.n. PhD students: I Alexander MELBA High power Beam diagnostics V. Bechthold Photocathodes S. Friederich Electron source, high brightness operation S. Heidrich: MESA Magnets, MARC-0 P. Heil: High bunch charge, MAMBO beam dynamics R. Herbertz Beam stabilization, feedbacks B. LeDroit (6/2016) Halo suppression C. Matejcek MELBA beam dynamics and characterization D. Simon – cryogenic operation of MEEK T. Stengler MEEK-HOM damping Ch. Stoll (6/2016): ERL related beam dynamics 5 MeV Dump MEEK-2 MARC 2,4 155 MeV Dump Two- floor InstrumentationBunker MELBA MARC 1,3,5 MAMBO MARC MEEK-1 11.11.2018

Excellence cluster “PRISMA-2”? January 2016: „Imboden-Komitee“ presents its conclusions on results and possible continuation of excellence initiative to greman research minstery BMBF …Concludes that „Clusters“ are succesful concept and suggests BMBF to create possibilites for new proposals …Proposes that existing clusters should be extended until 2019. The latter recommendation, if accepted by government, probably allows to continue personell funding (invest?) In additon, brainstorming for „PRISMA-2“ has started. 11.11.2018

GRK-2128 “Accelence” Common application by TUD and JGU for graduate school. Accelerator science and technology for enrgy recovery linacs Application succesful in 10/2015 First funding period (4,5 years) starts in 4/2016, 4PhD positions for JGU. 11.11.2018

“Centrum für Fundamentale Physik”, CFP New underground building at KPH -some details Arc arrangement idea by R. Heine 11.11.2018

“Centrum für Fundamentale Physik”, CFP New underground building-some details Radiation protection: see talk by Jürgen Diefenbach Note: Experiment and Accelerator power and cooling will be installed in the Technical rooms of new building !  excellent infrastructure conditions ! (if compared to initial suggestion…) 11.11.2018

PLAN “A” (April 2015) Hall-1 2 3 4 Inconveniences of „Plan A“, New Building Hall-1 P2 Old Building 2 MAGIX 3 4 Beam dump building Inconveniences of „Plan A“, space has shrinked in Hall-1 due to extension of MESA lattice! Large ADDITIONAL costs for civil engineering in old building, in particular ventilation, ground-work (earth shield!) and five large breakthroughs MESA Instrumentation

PLAN “B” Hall-1 2 3 4 MESA Instrumentation New Building BDX Old Building 2 3 P2 4 Beam dump building MAGIX Future exp.

Step-3 (see talks by Florian Hug) HIM building ready in spring 2016 Bunkered test stand, 4g/s closed cycle, corresponding 16 mbar SAC Delivery of Cryomodules due in 2017 (first due date: 3/2017) Acceptance test of modules under realistic conditions The team: Dr. Felix Schlander (Kryomodul project managment) Jun. Prof. Dr. Florian Hug (LLRF, control, Kryomodul project managment) N.N. LLRF Post-Doc (succesor Felix Schlander) Dipl Phys. Daniel Simon - Cryogenics M. Sc. Timo Stengler (Cryomodule characterization, in particular HOM thermal management) Ba Sc. Philipp Weber (R.f. charecterization) 11.11.2018

PLAN “B” – fire protection/cost reduction Hall-4 now formally belongs to old part of building Halls 1-3 get „up to date“ fire protection Hall-4 fire protection will be enforced together with the rest of KPH buildings 1 2 3 4 No breakthroughs, only circular holes  building stability issues solved Existing ventilating machine sufficient for Hall 2/3! No significant groundwork over old halls, since no shafts for new ventilation required! Fire protection authority accepts concept for halls 1-3 in September 2015, Architects finalized concept until 12/2015, Science ministery is favorably impressed, begins Adminstrative procedures

PLAN “B” – Kryogenics & R.f. See talk by D. Simon Five degree Hall becomes „Cryogenic center“

PLAN “B” – Kryogenics & R.f. See talk by D. Simon Valve Box (RI): -Lq. Helium input -Connection to Cryomodules 1 4 5 3 2 5 Five degree Hall: 1 L280 liquifier (8g/s) 1 L280 refrigerator (P2) 8g/s SAC 5000 l lq. He Dewar 2*250 kW Kompressor 1 2 Transfer lines: - 4.5 K Lq. Helium to valve box - 16mbar gas from box ~15 K gas to/from P2 refrigerator 3 4 5