10 MW BIOMASS POWER STATION CONSTRUCTION PROJECT

Slides:



Advertisements
Similar presentations
Luan Morina, Head of Department for Energy and Mining The Role of Renewable Energy Sources in Kosovo.
Advertisements

L/O/G/O Green Energy Projects Opportunities for Cooperation Opportunities for Cooperation.
Heating with Biomass Timothy A. Volk, SUNY ESF SUNY Global Center February 8, 2013.
FORESTS – IMPORTANT ENERGY SOURCE. Forests in the EU Apart from their importance for ecology and environment conservation forests are one of the Europe's.
WORKING DRAFT Last Modified 8/13/2010 4:05:09 PM Central Europe Standard Time Printed :22:48 Central Europe Standard Time Seminar The role.
Cogeneration. Is the simultaneous production of electrical and thermal energy from a single fuel source.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
CODE Project WP3 – Modelling support for cogeneration across the EU27.
PRODUCTION OF WOOD CHIPS
Primary Energy Reporting. Contents What is primary energy? Why report primary energy usage? Primary energy reporting in LIEN Examples Benefits.
The Hungarian Energy Policy and the Renewable Energy Situation The Hungarian Energy Policy and the Renewable Energy Situation Dr. Poós.
Biomass to energy projects in the Caribbean and cross-island trade for power production IRENA, Martinique, June
Alternative Energy : Biomass By: Araceli Gallegos.
Cogeneration.
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
 Industrial societies spend huge amounts of energy.  Much of it is supply by electricity which comes from generators in power stations.
MANUFACTURE IN MOSCOW! LOCALISE YOUR PRODUCTION BASE!
Incentives Turkey's Investment Incentives System.
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
National Association of Regulatory Utility Commissioners Energy Regulatory Partnership Program with The National Commission for Energy State Regulation.
District Heating Typical range of power 500 kWth – 20 MWth Optimum size about 1 MWth Consumption about tons/year compatible with local availability.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Renewable energy resources are the sources that can be replaced / generated at the same rate that they are being utilised.
[Legislative] [Danish Policy] Energy 2000, Target to reduce CO2 emissions in 2005 by 20% compared to 1988 levels. Energy 21, Reinforce targets.
Low Carbon Buildings and Sustainability By Dr David Johnston – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
Environmental Protection and Infrastructure Operational Programme Tímea Baán EIOP Managing Authority Ministry of Economy and Transport.
2012 Investment project of wasteless timber processing production in Vokhma municipal district.
LONG TERM ELECTRICAL SUPPLY PLAN STAFF RESPONSE TO QUESTIONS, ISSUES, AND RECOMMENDATIONS MADE IN NOVEMBER 2004 Presentation to the Gainesville City Commission.
-BUSINESS FORUM- MONTENEGRO PROJECTED REAL GROWTH IN 2015 PROJECTED AVERAGE ANNUAL ECONOMIC GROWTH UNTIL ,5%3,8% MACROECONOMIC INDICATORS.
Recent legislation of Ukraine in RE and EE (accepted from July 2014 till now) Georgiy Geletukha, PhD Head of the Board, Bioenergy Association of Ukraine.
Recycling plant with a sorting line and area for temporary waste storage Project idea: utilization and processing of waste Place of realization: near treatment.
Polish Experience in Biofuels Market Development Viachaslau Herasimovich CASE Ukraine.
1 Cogeneration in the Forest Products Industry January 2008 by Phil Zirngibl.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
WHY TO PROMOTE LOCAL ENERGY RESOURCES? 1 LAEF Latvia Renewable Energy Federation Riga, June 18, 2015.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
«MALAYA SOSNOVKA» INDUSTRIAL INNOVATIONS PARK. - is situated in the centre of Russia on the border between Europe and Asia; - the territory is 88.5 thousand.
2013 Investment project on plywood production in Antropovo municipal district of Kostroma region.
INVESTMENT PROJECT Building regional garbage facilities.
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
ENERGY SOURCES IN POLAND PRESENTATION PREPARED BY THE STUDENTS OF GIMNAZJUM No 3 IN TARNOBRZEG JANUARY 2011.
Charging Station for Electric cars with DC power
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
OCEAN THERMAL ENERGY CONVERSION (OTEC)
Energostatik – 5 MWe Biomass Power Plant
FEZ GRODNOINVEST ADMINISTRATION
Biomass Understand the fundamental principles and
Construction of mini-CHPP 14 Warsawska str., Kovel, Ukraine
OGK-2 Group 9M 2016 IFRS Results
Corporate presentation
OGK-2 Group FY2016 IFRS Results
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
Biomass Energy Student Work.
Mini dairy plant construction
Nonrenewable Energy Resources
PROJECT OF CONSTRUCTION OF POWER STATION ON BIOMASS 76 MW
Global Steam Turbines Market Report Summary A Steam Turbine is a device that extracts thermal energy from pressurized steam and uses it to do mechanical.
ENERGY SECTOR IN MONTENEGRO
Cogeneration Dr. Haider Ali.
The Austrian promotion scheme for green electricity Günter Pauritsch Workshop on renewable energy sources Sofia, 21 December 2011 Austrian Energy Agency.
Renewable energy – smart solutions bring economic and social dividends
Energy in Denmark 2014 Danish Energy Agency.
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
KEDR Management Company LLC
Agriculture. AGRO Holding «KHLiBODAR»
CZECH REPUBLIC Joined the EU on May 1, 2004
Presentation transcript:

10 MW BIOMASS POWER STATION CONSTRUCTION PROJECT YAGOTYN CITY, KIEV REGION STAGE 1 - 2.5 MW "NVK "COGENERATION" LLC

PROJECT SUMMARY The main idea is the construction of a 10 MW biomass power plant in 4 stages, based in the “Budplastic” factory in Yagotyn city, Kyiv region. It is planned to construct a power station in Yagotyn city, Kyiv region (Selhoztehniki str., 5). It is planned to install two condensing steam turbines with an electric generator and to equip the exhaust steam condensation system with a turbine to produce electricity. It is possible to use wood chips, wood pellets, granulated waste from sunflower, pellets from agricultural products wastes, peat moss.

Importance of the location Raw materials base Railway An analysis of the adjacent territory of the TPP showed that the main local biomass could be: wood chips, granulated waste from sunflower, rapeseed and oilseed crops, as well as peat moss. The surrounding areas are used to grow various grain crops. There are free areas for growing energy willow for the production of wood chips as well. The nearest railway Yagotyn station is 323005 at a distance of 1.2 km from the settlement. Power supply The territory of «Budplastic» is 4.4 hectares and is conveniently located: the distance to the nearest 10 kV substation is less than 1 km. The territory is 14500 m2 of premises with high ceilings. Highway The territory of "Budplastic" is located within the boundaries of the Yagotyn city. It is possible to deliver biomass by trucks. The territory inside the enterprise allows to provide convenient conditions for unloading cars. A large logistic center Roshen in nearby, it facilitates the search for vehicles to deliver biomass.

Benefits and prospects DEVELOPMENT SECTOR PROSPECTS “THE GREEN TARIFF” PUBLIC SPHERE THE ENTRY COST The experience of building similar stations indicates the cost of 1kW of installed capacity - $ 3,500. State supports the sector due to “The Green Tariff” and tax benefits. The minimum "Green Tariff" is fixed to 2020 and is 13.6 euro cents / kWh. According to the Decision of the Energy Community Ministerial Council, Ukraine has taken an obligation to reach 11% of energy production from renewable sources by 2020 (6% as for today). Ukraine has sufficient amounts of biomass; its occupies the 7th place in Europe in terms of its volumes. The share of plantations will grow significantly in the next 10 years. 4 5 The Green Tariff for all types of power plants that produce electricity from alternative sources will decrease when compared to the level of 2016 Imported equipment is free of customs duty and is exempted from VAT, if the relevant equipment is not being produced in Ukraine 1 6 Preferential tariff by 2030 The rental rate for the land that is used for renewable energy facilities is reduced to 3% of the land value, compared to the standard 12 % rate 2 Linked tariff to the EUR 3 Monthly regulation of “The Green Tariff" by NKREKP

The key project parameters Stage 1 of 4, 2.5 MW of 10 MW The main equipment of the TTP is steam boilers and electrical energy generators. Boilers produced by the Ukrainian Monastyrische plant will be used. These boilers will be structurally upgraded to obtain the required power parameters and to improve their thermal efficiency. These improvements are patented in Ukraine. These boilers can effectively work on various types of solid fuel. Overall TTP data Capacity MW 2.5 Construction period months 12-13 Staff person 46 “The Green Tariff” EUR/kWh 0,136 Operation time hours/year 8 100,00 Investments USD 2 100 000 Technological cycle of the station: unloading biomass, burning biomass in boilers with steam and electrical energy generation, generation of electricity by a generator due to steam turbine rotation. The estimated cost of similar projects based on new equipment is about 2000-3000 USD per kW, the cost of our project is about 800 USD per kW.

The results of the TTP construction project Stage 1 of 4 – 2 The results of the TTP construction project Stage 1 of 4 – 2.5 MW of 10 MW Name of indicator Period 2018 2019 Production 3 Production 4 Profit (excluding VAT) 1 416 000,00 VAT 236 000,00 Production cost -140 000,00 730 000,00 EBITDA 1 820 000,00 1 560 000,00 Amortization 80 000,00 Income tax 50 000,00 272 000,00 Net Profit   1 712 000,00 1 233 000,00