Elaborating The Committee Charter:

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Condominium Living. A condominium is a form of real property ownership in which an individual owns a unit exclusively and owns common elements jointly.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Bond Program Planning Imperatives Study Session October 12, 2004.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
The Pit Crew: Strengthening the M&O and Facilities Parthership APRIL 3-6, 2013, LONG BEACH, CA.
Review of the Capital Outlay Process and Deferred Maintenance in the Commonwealth Implementation Committee April 18, 2005.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
ESTIMATING By Laith Jacob.
KEENE’S POINTE OPERATIONS BUILDING  Keene’s Pointe has approximately 1,060 residential lots with over 3,000 residents.  15 miles of roads  100 acres.
Centex Golf Course Construction. Business Venture Centex Golf Course Construction will be spanning the country designing and constructing golf courses.
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
JOE LOUIS BARROW, JR. National Director, The First Tee Senior Vice President, World Golf Foundation “A Vision for the Future” National Director, The First.
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Business Planning j Through operational management.
Southborough’s Community Preservation Act
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
Tax Increment Thomas Chapman Raymond James John Repsholdt Ehlers Steven Langert Consolidated High School District 230.
College Station ISD Planning for Growth December 12, 2006.
Atlanta Board of Education AdvancED/SACS “Required Actions” February 14, 2011.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
EGNRET Projects Cary Bloyd EGNRET 27 Zhuhai, China 9-11 October 2006.
Woodland School District Study and Survey and Related Facility Planning Services Construction Services Group.
North Carolina Community College System H. Martin Lancaster, President Fifty-eight Institutions Educating and Training a World-Class.
PRESENTATION ON THE DEVELOPMENT AND THE IMPLEMENTATION OF THE “NEW GENERATION” CORRECTIONAL FACILITY PROTOTYPES Department of Correctional Services 17.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Successful Bond Programs (Community Engagement) Cathy Allen, Chief Operations Officer Facilities Support Services September 22,
DECEMBER 12, 2012 NEWPORT BEACH COUNTRY CLUB Application No.: Item: W 11a.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
Planning Team Facility Owner Local CTA/Facility Users Parks and Recreation Facility Manager/Tennis Professionals Facility Maintenance Design Professionals.
S T A T E O F C A L I F O R N I A. Expediting the Application Review Process Building Schools — Putting Californians to Work.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Park Planning for the City of San Diego Robin Shifflet April 22, 2016 City of San Diego Planning Department.
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
Systems Analysis and Design in a Changing World, 4th Edition
Condominium Living.
Winchester Lift Station Odor Control Project
CM at Risk v. Design-Bid-Build
A series of projects The master plan has no end date.
Griffith Park Fire Draft Recovery Plan May 30, 2007
The Community Preservation Act in Northborough
Skillman Corridor TIF District
Concept Plan for Proposed Park Near Hopewell School
Condominiums Association
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Project Development and Managing your Build Agenda
The Community Preservation Act in Topsfield – August 31, 2004
Dana Heiberg, Senior Planner February 5, 2018
CLINICAL INFORMATION SYSTEM
TSAG Overview Mission Vision Core Values Operating Principles.
Recreation and Park Commission
Introduction DEFINATION :-
United Nations Voluntary Fund on Disability (UNVFD)
A Del Webb Community 2019 Budget
MULTISPORTS CENTRE PRESENTATION
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
NGEC Executive Board Meeting
Design and Engineering Services
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Lafayette Airport Commission New Terminal Program Update
Cumberland Community Event Center Repurposing a Community Treasure
Presentation transcript:

Interim Report Of The Golf Course Committee To The Board Of Selectmen 18 January 2018

Elaborating The Committee Charter: Committee Goals Elaborating The Committee Charter: Collaborate With The Public Safety Building Committee (PSBC) To Minimize The Short Term Disruption To The Golf Course And Plan To Keep The Course Open During Construction Collaborate With The PSBC Design Agents To Allow A Viable Golf Course To Emerge From Post-PSB Construction Secure A Golf Management Company For The Construction Period Plan For The Long-Term Future Of The Golf Course

Current Committee Progress Collaboration With The PSBC (In-Progress) Viable Concept Completed For Golf Course Integration And Alterations Parking, Course Access Integrated With PSB Access Road Design New Location For Existing Clubhouse Relocation Sited Identification Of Budgeted And Non-Budgeted Expenses Within The PSB Bonding Authority Defined

Current Committee Progress Golf Course Architect – Phase 1 (Completed) Collaboration With CONTEXT Architects To Fit Golf Course Modifications For Access, Parking, Clubhouse Planned Locations For Temporary 1st Tee and 9th Green & Trailers (Temporary Access TBD) Conceptual Design For Permanent Locations Of 1st Tee and 9th Green RFP Language Developed For Bidding Design Documents And Construction For Permanent 1st Tee and 9th Green Construction Golf Course Architect – Phase 2 (In-Process) Golf Course Master Plan Inputs For Overall Course Needs And Restoration

Current Committee Progress Conservation Restriction (In-Process) Completion Of CR With Language Which Allows The Currently Planned Work On The Golf Course And Future Restoration And Maintenance Expected Committee Outputs (In-Process) GC Master Plan GC Governance Plan Model GC Management RFP Model GC Architect RFP Outline Budget For Continuing Operations

Restored Golf Course Concept

Assumptions Golf Course Construction And Restoration Is Essentially Unfunded Example: Moving The Clubhouse Is Within The PSB Bond Scope, But Not The Foundation, Utility Services, Restoring The Steps And Decks Example: The Parking Retaining Wall Is Not In the Scope, Together With Other Final Landscaping Total Task Shortfall Estimated By The PSB Cost Estimator: ~$300k This Estimate Is Viewed As A Cost Within The Physical Boundaries Of The PSB Project Not Funded By The PSB Bond That Support The Golf Course These Are Separate Costs From Any Other Short-Term Or Long-Term Efforts Proposed Under The GC Master Plan Under Development By The GC Committee

Other Unfunded Costs (TBD) Break Down Into Two Categories: Assumptions Other Unfunded Costs (TBD) Break Down Into Two Categories: Temporary Facilities: Trailers, Utilities For When The Clubhouse Is Unusable Safety Items: Fencing, Signage Restoration: GC Architect’s Construction Drawings For New 1st Tee And 9th Green Construction Costs For Above

Summary Of Current Position Total Unfunded Tasks Required For Near-Term Continued Operations: Construction Costs (Within PSB Project): ~$300k Temporary Facilities: $46k* (6 Months) Permanent Restoration 1st and 9th Holes: $294k* *-Estimates Based On Conversations With Golf Course Management Professionals And On-Line Research Unfunded Future Tasks For Long-Term Operations: Catch-up For Deferred Maintenance Irrigation & Drainage Minor Projects

Phase 1 – PSB Construction Period Tasks – Immediately To 12 Months Golf Clubhouse Move Take Advantage Of The Funded Move And Move The Clubhouse Once To Its Final Location Foundation & Utilities Earthmoving And Finish Landscaping For Final Access Road, Parking, Area Around Clubhouse Operate The Golf Course With Temporary Trailers, Parking, Utilities Until The Original Clubhouse Is Completed Take Advantage Of Construction Management In-Place For PSB To Complete Golf Course Construction Within The Bounds Of The PSB Construction Site

Phase 2 – Restoration Tasks – 6-18 Months Complete Detailed Design Of Restored 9th Green And 1st Tee Construct Same Move Golf Course Operations To Restored Clubhouse Continue Operations On Temporary 1st Tee And 9th Green Until Restored Course Facilities Are In Place And Ready For Play Current GC Concept Allows Concurrent Construction Of Restored Golf Course Features And The PSB

Phase 3 – Preservation Tasks – 18 Months – Onward Implement GC Master Plan As Required Irrigation Improvements Fence Line Repairs Drainage Trimming Minor Course Feature Restoration Equipment House Repairs

Other Goals & Recommendations Achieve Designation of Southborough Golf Club as a “Certified Audubon Cooperative Sanctuary” Reinforces The Town As An Environmentally Conscious Community Secures Assistance From Audubon International On How To Better Manage A Golf Course On Conservation Land Promotes Better Cooperation With Open Space And Conservation Bodies Provides Positive Publicity For The Golf Course The CAPS program is also affiliated to the USGA

Other Goals & Recommendations Establish Non-Profit ‘Friends Of The Golf Course’ Organization Separate Organization To Supplement Fee-Based Course Funding Allows Access To USGA and PGA Grant Funds For Training, Teaching And Course Management Possible Grants From USDA For Recreational Facilities Improvements