Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board

Slides:



Advertisements
Similar presentations
Former NAS Moffett Field
Advertisements

Certification of Compliance By Evita Lagard
Supporting documents Implement Work Plan Sub-Area CSM Sub-Area DQOs Sub-Area Work Plan (contains Sub-Area CSM and Sub-Area DQOs) BRC Decision 1. BRC Common.
Update on the Remedial Action at the Wood Hollow Training Area MRS November 6, 2014 Jeff Fitzmayer Parsons.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 BoRit Asbestos & The Superfund Process Stacie Peterson, Remedial Project Manager (RPM)
J-Field Edgewood Aberdeen Proving Ground. Description From 1940 to 1970s, the Army disposed of chemical agents, high explosives and chemical wastes. APG.
BoRit Superfund Site Timeline
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Public Draft Removal Action Workplan Proposed Richmond Bay Campus Site RES Area and Groundwater Public Meeting December 5, © keh.
Bob Mashburn Army Regional Environmental Office Atlanta, Georgia ARMY CLEANUP PROGRAM – Status Update –
California EPA Dept. of Toxic Substances Control Brownfields & Environmental Restoration Program Sam V. Martinez, Jr.
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
1 Certification of Compliance with New Meal Pattern Requirements.
Case S-4_SRS Par Pond1 Case Study 4: CERCLA INTERIM ACTION AT THE SRS PAR POND.
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
Treatment Technologies for Site Cleanup: Annual Status Report (12th Edition) Internet Seminar October 11, 2007 Carlos Pachon
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
US Army Garrison Picatinny Arsenal Agenda for 11 June 2014 Picatinny Arsenal Restoration Advisory Board Attendance, Introductions & Correspondence Old.
Munitions Response Services EA Engineering, Science, and Technology, Inc. ® Having provided Munitions Response services on hundreds of sites, EA knows.
UPDATE ON ARMY MILITARY MUNITION RESPONSE PROGRAM (MMRP) Mary Ellen Maly / SFIM-AEC-CDP / / DSN / 1.
Water Supply Planning Initiative State Water Commission November 22, 2004.
A Hazardous Waste Site PCB Contamination. Polychlorinated Biphenyls (PCBs) Man-made class of oil-like chemicals used in the manufacture of electrical.
Munitions and Explosives of Concern Hazard Assessment (MEC HA) Initiative Stakeholder Workshop Sept 21, 2005.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
OMB’s Management Watch List (MWL) & High Risk Projects List How to More Effectively Track, Analyze and Evaluate Your Agency IT Investments October 9, 2007.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
1 Joseph P. Nicolette, Vice President, CH2MHILL Keith Hutcheson, Associate, Marstel-Day, Inc. April 8, 2004 Use of a Net Environmental Benefits Analysis.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Name/Office Symbol/(703) XXX-XXX (DSN XXX) / addressDate-Time-Group 19 September 2008 Fort Monroe Closure Environmental Planning.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
1. 2 Presentation Highlights BGOU overview Scope of the Remedial Investigation Investigation results Schedule 2.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Fort Detrick Installation Restoration Program Area B Groundwater November 1, 2010 Fort Detrick, Maryland A Sustainable Community of Excellence.
Pinecastle Jeep Range Resolution Board of County Commissioners Discussion Item November 29, 2011.
Proposed Plan for No Further Action
Environmental Acquisition Strategy Performance-Based Contracting
Presentation on Livermore Lab Site 300 Superfund Cleanup Peter Strauss, Environmental Scientist, PM Strauss & Assoc. Community-Wide Meeting on
Environmental Cleanup Program Status
Anniston PCB Site Review of Risk Assessments for OU-1/OU-2
Uranium in Colorado: Past, Present, and Potential Future
THE SUPERFUND PROCESS Assessment and Listing
S O S FOR S E S Wednesday, February 28, 2007
Environmental Cleanup Program Status
Enterprise Content Management Owners Representative Contract Approval
Overview of the FEPAC Accreditation Process
Environmental Cleanup Program Status
Wurtsmith Restoration Advisory Board Meeting
Area C Location 1.
Attendance, Introductions & Correspondence Old Business
Florida Department of Environmental Protection Petroleum Cleanup Program Contamination Notification Training February 2009 Charles T. Williams Environmental.
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
ESCA Remediation Program Update
Advanced Environmental Management (AEM) Training Phase I
Portfolio Management Process & Customer Request Management
Presentation transcript:

Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board Attendance, Introductions & Correspondence Old Business TAPP Contract Financial Report and Path Ahead Former Burning Grounds Update Mid-Valley Groundwater Update Co-Chair Election Update in a Minute Synopsis and Next Meeting

TAPP Financial Report Update Contract awarded September 2011 with 2 Option Years via Purchase Order; 1st option year was exercised FY 13 Picatinny Contract Option Year 1: To SEP 13 Purchase Order Value $23,218.50 Spent $14,538.00 ------------------------------------------------------------------------------------------------------------------------------------------------- FY 13 Picatinny Contract Option Year 2: FY 14 Purchase Order Value $24,052.80 till Sept 19, 2014 Spent $ 0.00 This option year of the contract is the last year of the 2nd Waiver Request. -------------------------------------------------------------------------------------------------------------------------------------------------- Method of selecting what TAPP reviews: Doodle polls with a minimum of two votes in favor needed for a review. Continue to send executive summaries, report or reports summaries prior to the Doodle Vote Recent reviews: GPB/BSB Annual Report, 26 Sites Proposed Plan, 2012 Annual Monitoring Group 3 , Site 2 GW and SW Report, Site 78 Annual Report, Area B Annual report, 45 Site Feasibility Study, Area C Annual Report Suggested upcoming reviews: MMRP RI Report, Annual Reports for Groundwater Sites, the Non-Lake FS, the Dispute Resolution Position Papers, the Lake Picatinny Sampling Results, or the Revised Lakes FS.

Update-in-a-Minute Installation Restoration Program 24 October Presentation to the Picatinny Arsenal Restoration Advisory Board

Status of Installation Restoration Investigations Installation Restoration Program Remedial Investigations considered complete Lake Picatinny sampling as required by NJDEP and EPA completed in Sept, results in Dec Marsh Report Site Investigation Report provided to EPA and NJDEP; Additional samples taken this week per NJDEP comments

Status of IRP Feasibility Studies (FSs) 600 Hill Groundwater submitted May 2013, reviewed and discussed at last RAB Lakes FS: Document will need to be revised (once again) based on sampling results 45 Site FS: All sites with acceptable risk; consistent with No Action by July: Only two alternatives – No Action and No Action with monitoring: NJDEP provides comments. Briefing paper by TAPP Non-Lakes Sites: With all sites with acceptable risk submitted consistent with No Action 5 Site FS: Army and EPA have gone Formal Dispute: Position Paper by the EPA and Army

Disputed Issue for 5 Site FS Which soils contaminants needs to be addressed when risk is unacceptable at a site? Army Position: Risk Driving Contaminants only get cleaned up: "New Jersey SRS based on the ingestion-dermal health criterion are only ARARs for COCs found to be driving site risks or hazards at the site and not for non-risk or hazard drivers even if identified as Contaminants of Potential Concern (COPCs) at the initial stage of the risk assessment process. “ EPA Position: State Cleanup numbers are generally ARARs: “..once an unacceptable risk or hazard is identified for a chemical on-site (and it therefore becomes a Chemical of Concern (COC)), the ARAR analysis triggers recognition of the entire list of the New Jersey Soil Remediation Standards (SRS) based on ingestion-dermal health criterion promulgated by New Jersey for all chemicals present on-site regardless of the CERCLA risk assessment process (i.e. regardless of whether or not they are an identified COC in the CERCLA risk assessment). “ Deals with 5 locations near: Building 63, near former Building 408, near former Buildings 541 and 41 Army pulling back remediation at 3 sites “the proposed soil remediation goal (23,000 mg/kg) is higher than the soil exposure point concentration for manganese

Status of Proposed Plans 600 Hill GW Proposed Plan: Will need to be separately contracted. PICA 111 NFA Proposed Plan: Submitted in June 2013, new 2014 contractor to make modifications. 26 Site NFA Proposed Plan: Submitted in June 2013, comments from EPA and NJDEP in August 2013: Briefed at last RAB

Status of Records of Decision Signed RODs, Implemented: Site 20/24 considered complete except LUC monitoring Post Farm: Action is considered complete except for monitoring Green Pond/ Bear Swamp Brook: Only monitoring remains Area D Groundwater: Permeable Reactive Barrier monitoring continues Site 25/26: ICs and vegetative cover considered complete Site 180 ROD: Complete except LTM Area E Groundwater: Consider complete except for the MNA monitoring 13 Sites Institutional ROD PICA 20: LUCs ongoing Site 61/104: considered complete Area B Groundwater: Considered Remedy in Place Site 31/101 DRMO Yard: Complete except for LUC Southern Boundary/Area C: LTM continues Group 1 GW and soils: Considered complete except monitoring Group 3 GW and surface water: Considered complete except monitoring Site 78, PICA 13 GW and SW: Considered complete except monitoring MidValley Groundwater: Remediation ongoing and discussed at this RAB Next up 26 Sites NFA Record of Decision: COL Mackay signed document in early September 2013. EPA will not sign until risk assessments are reviewed by EPA HQ as requested by the NJDEP Signed now being implemented Former Burning Grounds (PICA 02): Discussed at this RAB Explanation of Differences required by EPA for Hybrid Cover; Contractual Modification required to be in compliance with C-1 Requirements.

Sites with signed Records of Decision

Remedial Action Reports & Long Term Monitoring Reports MidValley Groundwater Interim Remedial Action Report Post Farm Site 180 Site 25/26 Area B GW Area E GW Area D GW Green Pond Brook/Bear Swamp Brook Site 104/61 Report Area C GW: NJDEP requesting offsite well, Army disagrees Group 1 GW Group 3 GW PICA 13/Site 78 GW LUC Annual Certification

Update on the Military Munitions Response Program Remedial Investigation RAB Briefed on results in June 2012 on 7 Sites and February 2013 on the investigation of the Lakes RI Report to be submitted November of 2013 -------------------------------------------------------------------------------------------------------------------------- Nine munitions response sites (MRS) totaling 5,801 acres RI Objective: Collect data to define nature and extent of munitions and explosives of concern (MEC) and munitions constituents (MC) Field investigations include geophysical surveys, anomaly excavations, and media sampling for MC Investigation results will be used to assess explosive hazards and risk to human health, safety, and the environment and evaluate MRS boundaries

Military Munitions Response Program Remedial Investigation

MMRP Remedial Investigation Summary Munitions Response Site Geophysical Survey Coverage Anomalies Investigated Quanity of MEC Quantity of MD Transect Approach Grid Approach Mag & Dig (ft) DGM (ft) Density (ft) ER (ft) Mag & Dig DGM 1926 Explosion Radius and 1926 Explosion Radius - Off-Post - 13,844 93 grids/ 5.33 acres 39 grids/ 2.23 acres 2,928 21 967 Shell Burial Grounds 15,313 4,660 Green Pond Brook 2,160 2,703 562 58 Former Operational Area 218,910 70,650 13,443 1 grid/ 0.05 acres 7 grids/ 0.4 acres 3,194 76 443 Lakes 78,837 31,439 2 grids/ 0.82 acres 268 2 44 Inactive Munitions Waste Pit 830 6,163 3,020 14 1 Inactive Munitions Waste Pit - Off-Post 6,780 6 4 Lake Denmark - Off-Post 30,817 Project Total 307,517 ft or 58 miles 126,268 ft or 24 miles 61,124 ft or 11 miles 4,660 ft or 0.9 miles 95 grids/ 5.43 acres 48 grids/ 3.45 acres 6,972 99 1,517 ER electrical resistivity ft feet MD munitions debris MEC munitions and explosives of concern

What was briefed in last June

Update on the RI of Lake Denmark- off Post MRS Needed DoJ to get permission from the Courts to do intrusive work instead RoE; Non-Intrusive Technical Memorandum approved Army, EPA & NJDEP; Added approved process to Work Plan Addendum Information from other activities included in Work Plan Transects spaced 100 feet If Data Quality Objectives cannot be met, a Data Gap FS will be developed with another contract 30,817 feet of visual surveys completed and no MEC (UXO found)

Programmatic Developments 2013 Installation Action Plan: On Picatinny Environmental Web page MMRP Sites’ Cost-to-Complete does not include costs past ROD if FS is not available IRP sites reflect that No-Action is expected for over 100 sites with acceptable risk Defense State Memorandum of Agreement/Cooperative Agreement DSMOA Draft two year WP to be submitted to NJDEP through DoD’s web portal This is how New Jersey is paid to review and provide oversight consistent with CERLCA. FY 14 Contract Plan will include a major Performance-Based Contracting effort FSs- Remedy-in-place for MMRP & Former Skeet Range, Remedy-in-Place 600 Hill GW and Lakes to be contracted out till Remedy in Place Replacement of current PBC contract with LTM requirements

Have a Happy Halloween

Map showing agreements of approved Supplemental Workplan