ILO meeting #40 Ongoing & Forthcoming Calls

Slides:



Advertisements
Similar presentations
ITER Organization, Cadarache, France
Advertisements

ITER Port-Plug Engineering
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
ITER International Team 16th ANS Topical Meeting on Fusion Technology
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
From Research Prototype to Production
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
Doing business with CERN Anders Unnervik 3 November 2014.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
1 Overall status of the procurement activities for the items transferred from F4E to JAEA F4E-JAEA Bi-lateral Meeting #12 St. Paul-lez-Durance 15 June.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Charles C. Baker Virtual Laboratory for Technology presented at the U.S. ITER Forum University of Maryland, College Park May 8, 2003 US ITER Technology.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Doing business with CERN Anders Unnervik 20 May 2014.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
O. Kester, NuSTAR annual meeting, 27/02/2013
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
WP High Beta Cavities Delivery
Doing business with CERN Anders Unnervik
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Doing business with CERN Anders Unnervik
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
HL-LHC IT STRING and Series test of SC link
Roadmap for triplet cryostats
11 T Dipole Integration & Plans M. Karppinen
Francois and Lau EATM 17 July 2012
CSP 25th November 2010 Technical agreement number 3: overview
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
JET Programme in preparation of ITER
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Ways to industry participation in CLIC 24th October, 2017
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
TEST PLANS for HL LHC IT STRING
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Fusion for Energy & ITER Contribution to EU Added Value
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
as a prototype for Super c-tau factory
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
IFMIF/DONES Project: opportunities for the industry
East Hall under construction
Presentation transcript:

ILO meeting #40 Ongoing & Forthcoming Calls 10th July 2018 - Cadarache

Magnets Action Signature Type of contract   Magnets Contract signature for Transportation of TF Coils from Manufacturer to ITER Q4 PServ  TBD (DAHER contract may be used) Release of Option for Additional Working Shift. Standard Effective Working Hours/Number of Workers in 2019 Option Task Order Signed for Extension of 2nd Inspector for PF Coils Manufacturing in Cadarache Q1 SC-PServ Task Order Signed for Inspection Services for TF Coils Insertion and Cold Test. Resident Inspector for SIMIC Task Order TO29.1 Signed for Inspector to Follow-up the Plan B PC Rings Manufacturing Contract Q2 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Magnets Pre-Compression Rings OPE-0345 – PCR Standard technology 4th slice of the 1st operational PCR completed, bonding qualification on-going. OPE-0781 – PCR Alternate pultrusion technology 2 mock-ups UTS* successfully tested, 1 stress-relaxation successfully passed. Option for 3 additional rings internally launched. *UTS = Ultimate Tensile test F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Magnets PFC Manufacturing Dummy DP impregnation for PF5 completed and MRR passed successfully. Series Production of the DPs winding is well underway PF5 (3 wound, 2 in preparation for impregnation) PF6 (7 wound, 4 impregnated, 1 under impregnation Assembly of final tool Gantry Crane completed Dummy DP Impregnation and sectioning completed for PF6 (ASIPP in China). F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Magnets TFC Manufacturing OPE-355 Radial Plates Delivered. Contract 99% closed. OPE-053 WP Production slowed down to match delay in delivery of TFCS by JA-DA Delivery of 2 WPs completed 100%  OPE-414 Coils insertion Cold Test Thermal Cycle of 1st WP completed. Discussions on going to update the baseline schedule, based on inputs from JA-DA Coil Case delivery schedule. F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Vacuum Vessel Vacuum Vessel   Commitment and Task Order Signed - TO #21 for 1 VV Resident Inspectors Q2 SC-PServ Commitment and Task Order Signed - TO #22 for 1 VV Resident Inspectors Q3 Commitment and Task Order Signed - TO #23 for 1 VV Resident Inspectors Commitment and Task Order Signed - TO #25 for 1 VV Resident Inspectors Q1 Commitment and Task Order Signed - TO #29 for 1 VV Resident Inspectors Q4 Commitment and Task Order Signed - TO #31 for 1 VV Resident Inspectors PServ Commitment for Contract for Transportation frame for sectors delivery Q2 2019 PSupply Market Survey on-going  Q3 2018 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Vacuum Vessel Progress achievement E.Tada, IO-ILO VV PT Meeting 06/18 07/18 VV Sector 5 58% 60% VV Sector 4 50% 56% VV Sector 3 26% 49% VV Sector 2 15% 43% VV Sector 9 11% 41% KO-DA VV Sector 6 81% F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

In Vessel-Blanket In Vessel- Blanket   Blanket and Divertor Testing Facility_Flat Rate for 2020 Q4 PSupply Blanket and Divertor Testing Facility_Flat Rate for Jul-Dec 2019 Q2 OPE-443-01 Option I Be armour for manufacturing of mock-ups without SS pipes Option OPE-443-03 Option I Be armour for manufacturing of mock-ups without SS pipes Contract for phase 1 First Wall series fabrication (in view of industrial organization) Q3 TO 02 OPE-319-01 High Heat Flux Testing of FW full scale-prototype n.2 Q1 SC-PServ TO 03 OPE-319-01 High Heat Flux Testing of FW full scale-prototype n.3 Task Order for Inner Vertical Target Inspectors In Vessel- Divertor Development of the Tube to Tube Transition and Fabrication of PFU with New W Grade PServ Task Order for Inspectors 2019 – Inner Vertical Target Task Order for Resources 2019 - Cassette F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

In Vessel-Blanket Under evaluation OPE-0893: Proof of Principles Testing of First wall Tile Repair Techniques (deadline: 18/04/2018). OMF-0916: High Heat Flux tests of First Wall components (Worldwide; deadline to submit: 07/05/2018). F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

In Vessel-Divertor Under preparation Nothing F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Remote Handling Remote Handling   Task Order signed for GENROBOT Update Phase 2 Q2 SC-PServ Task Order Signed for Final Design Phase 1 for DRHS Q1 SC-PSupply Task Order Signed for Final Design Phase 1 for IVVS Q3 Task Order Signed for Final Design Preparatory Activities for In Vessel Viewing System Task Order Signed for Final Design priority items for CPRHS Q4 Task Order TO#05 signed for Preliminary Design, first design review and test bench mfg for NBRHS Task Order TO#06 signed for Final Design of Monorail Crane, Preliminary Design of Vessel Opening System for NBRHS C&P invited AIRBUS DS CNIM NES UK ENSA ARITEX CADING Spain ALSYOM - ASSYSTEM UK - COMEX - EUROPEAN REMOTE HANDLING ALLIANCE - NUVIA F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Remote Handling OMF-0340-01: Divertor RHS Specific Contract #3 PD Phase 2, on-going. PDR target date December 2018. OMF-0340-03: Neutral Beam RHS Specific Contract #3 PD Phase 2, on-going, Specific Contract #4 Pipe tooling design under final stage of preparation OMF-0577-01: Cask & Plug RHS Specific Contract #2 PD on-going OMF-0633-01: Engineering support Specific Contract #6 on-going for Support to RHPT Proc Follow-up Phase 2. Specific Contract #7 on-going for Test Bench Validation for BiSS I/O Proto Specific Contract #8 on-going for IVVS Design studies task Specific Contract #9 on-going for Development/Assessment of a RadHard Image Sensor Prototype C&P invited AIRBUS DS CNIM NES UK ENSA ARITEX CADING Spain ALSYOM - ASSYSTEM UK - COMEX - EUROPEAN REMOTE HANDLING ALLIANCE - NUVIA F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Cryoplant & Fuel cycle Cryoplant and Fuel Cycle   Contract Signed for Call for tender for Torus and Cryostat Cryopumps Q4 PSupply  market survey done Contract Signed for I&C and software design Q2 PServ Contract Signed for Provision of logistics for test & Commissioning of LN2 Plant & Auxiliary Syst. Q3 MITICA Cryopump Installation tool Q1 Provision of Gases for Commissioning F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Cryoplant & Fuel cycle Awarded (and signed) OPE-0843: Final design of the FECDS and supply of Torus and cryostat CVBs+ Warm regeneration Box. (deadline final tender 17th April) to Research Instruments (Germany). Under evaluation OPE-0888: Johnston Couplings and cryojumpers for ITER Cryostat and Torus. Under preparation Torus & Cryostat Cryopumps (8 units). Market survey done. Target PA: October 2018. CFT afterward. Primary Leak Detection and Localization System PA: market survey done. Target PA: end of 2018; CFT afterward. Pre production cryopump (Research Instrument) F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Antenna and Plasma Engineering   Contract Signed for Hardware procurement for EC Plant Control System Stage 2 Q3 PSupply  Open, no MS Contract Signed for Manufacture development and optimisation of Waveguide prototypes for EC Launchers Q2 PServ  TBD Contract Signed for Manufacturing and Testing of ICH RF Window mock-ups and Prototype  Cancelled Only series prduction Contract Signed for Manufacturing and vacuum qualification of EC Isolation Valve prototype  FWC Nego with VAT Contract signed for Series production of EC Window Diamond Disks  Nego with Diamond materials Contract Signed for Testing of Hydrogen embrittlement of Ti-SS joints Q1 Task Order 1 Signed for In-sourcing for Support to EC UL Series production SC-PServ Task Order Signed for Design of ATLIS & Transition frame for the ICH Antenna - Part 2 TO 08 Task Order Signed for Development of EC Instrumentation for ITER SC-PSupply Task Order Signed for Neutronic, mechanical and RF analysis of the ICH Antenna Task Order Signed for Procurement and testing of Feedthrough prototypes Task Order Signed for Procurement of Mirrors and Steering Mechanism prototypes Task Order Signed for Testing of Diamond Disks for EC Windows Task Order Signed for Testing of EC Window prototypes Task Order Signed for Testing of Window and Valve prototypes Task Order Signed for Nuclear safety, analysis and engineering verification The EC Window Subassembly Prototype includes:  One CVD Diamond Disk  Two Cuffs  One Cooling Ring  One Cooling-Diagnostics Ring https://idm.f4e.europa.eu/?uid=29L3QK&version=v2.0&action=get_document F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Antenna and Plasma Engineering (1/3) Signed: OPE-772: Manufacturing design of Valve Proto (VAT. Signed. OFC-842: Testing of ITER ECL window – (KIT). Signed OPE-920: Inclusion of NTM model in Jin trac - Signed (CNR- IFP) Software development (linked to OPE-541) OFC-484: Design of the ITER ICH Antenna (CYCLE). To be closed Q3 2018. OFC-800: Nuclear Engineering Support (NIER) TOs signed one as back-up of Iberdrola withdrawal from fusion activities #1 closed #2 #3 on-going #4 signed #5 task description Electron Cyclotron Upper Launcher The EC Window Subassembly Prototype includes:  One CVD Diamond Disk  Two Cuffs  One Cooling Ring  One Cooling-Diagnostics Ring https://idm.f4e.europa.eu/?uid=29L3QK&version=v2.0&action=get_document Ion Cyclotron Antenna F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Antenna and Plasma Engineering (2/3) Under preparation or launched OPE-885: EC Windows Prototype – (Competitive with Nego) Annex B under validation by IO. To be launched Q3 OPE-729: EC Window Sub-Assembly Prototype Annex B under validation by IO (Diamond Material GmbH). To be launched Q3 OMF-922: ICRH Window manufacturing – Cancelled. Design to be done by IO, only series production under F4E scope. OPE-926: PO for OCEM – Modification of SW BPS in order to include waveform in Falcon facility OFC-671: ECT-FALCON facility Set-Up - TO2 signed (EPFL, SPC) testing of 20 dummy load and EC instrumentation analysis. TO3 under preparation. Electron Cyclotron Upper Launcher The EC Window Subassembly Prototype includes:  One CVD Diamond Disk  Two Cuffs  One Cooling Ring  One Cooling-Diagnostics Ring https://idm.f4e.europa.eu/?uid=29L3QK&version=v2.0&action=get_document ICRH Design Review Call published OJ Preselection of 5 to submit, Award of Innovation Partnership to 3 best, 1st Delivery = Design review, 2nd Delivery = Small or Medium scale proto, Selection of best 2 to deliver Manufacturing prototype, Series production with 1 or 2 (60+ units to be manufactured) Ion Cyclotron Antenna F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Antenna and Plasma Engineering (3/3) [‎7/‎4/‎2018 3:25 PM] Hoestlandt Laura (F4E): EC Upper Launcher BSM and Port Plug Engineering Analysis   Antenna and Plasma Engineering (3/3) On-going OPE-776: Corrugated waveguide - release of options done (Tiefbohrbaer), scope amended. OPE-780: Development of Ti-SS rotary friction welding – Contract on- going (TWI) Technically closed. OPE-757: Manufacturing of RF Dummy Load for Gyrotron operation at High Power - On-going (CNR) OFC-908: new Manufacturing Support EC launchers (TWI). TO 1 launched OFC- 800: Support Services TO5 sent, waiting for offer (EC Upper Launcher BSM and Port Plug Engineering Analysis), TO6 signed (A System Engingeer to Support the Antennas and Plasma Engineering Unit) Electron Cyclotron Upper Launcher The EC Window Subassembly Prototype includes:  One CVD Diamond Disk  Two Cuffs  One Cooling Ring  One Cooling-Diagnostics Ring https://idm.f4e.europa.eu/?uid=29L3QK&version=v2.0&action=get_document Ion Cyclotron Antenna F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Neutral Beam and EC Power Supplies and Sources   Commitment for Specific Contract - MITICA CODAS 1, Interlock and Safety FW Contract NBTF Control, Interlock and Safety Q1 SC-PSupply Contract Signed - MITICA Diagnostics Q3 PServ Contract Signed - PRIMA#3 Assembly Contract Signed - PRIMA#4 Assembly Q4 Release of Additional Options 2019 for the Contract Procurement of Body PS & MHVPS Main Contract Option Release of Option 1 - 5 years spare parts for the Contract Procurement of Body Power Supplies & MHVPS Release of Option 8 - 1-year extension of warranty - HVD1 & Bushing of MITICA Release of the Second Group of Options - SC#1 MITICA Beam Source Task Order Signed for SC#1 Stage 2 MITICA Beam Line Components Task Order Signed for Services for NBTF Site Supervision and Support - 06 SC-PServ Commitment for Budget for NBTF Technical Follow-up 2020 Cash Amendment Budget for NBTF Agreement 2019 NOT Credited part F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Neutral Beam and EC Power Supplies and Sources On-going OMF-0605: Beam source phase 2 with the three initial tenderers (Alsyom, ATT and De Pretto, and Thales) Awarded OPE-0868: Interpretation of results and evaluation of performance obtained on the European Electron Cyclotron Power Supplies (EU ECPS) procured by Fusion for Energy (under contract F4E-OPE-454 with AMPEGON) awarded to EPFL (Swiss Plasma Center). F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Diagnostics Diagnostics    Market Survey  Responsible MIO Baseline Signed for Preliminary Design CPTS Q4 SC-PServ Q4 2018   MDL Commitment for Contract for Procurement and Delivery for Inner-Vessel Sensor Head HF - Lot 2 Q1 PSupply Q2 2017 (data re-use)  Commitment for Contract for Procurement and Delivery for in-vessel clips, clamps, bosses and critical junction boxes  Q3 2018  ACL Commitment for TO for Irradiation Testing for Bolometer Sensor Prototype & Electrical Connections Contract Signed for Final Design of RH Connector and Ancillary Components PServ Q3 2018 Contract Signed for Procurement and Delivery for Inner-Vessel Coils - Sensor Heads LTCC - Lot 1 Q3 2018  Contract Signed for Procurement and Delivery for PPR Captive Ex-Vessel Transmission Components Q2 2018 (data re-use)  Contract Signed for Procurement and Delivery of In-vessel cabling Contract signed for Supplies and Support of CTS Critical Prototypes  Maybe FPA  MDL Fission Chamber Prototype & Series Production On-going  Commitment for Future Activities for in-source personnel under OMF-0871 Q2 Task Order Signed for Irradiation Testing for Feedthroughs Task Order Signed for TO#3 Engineering Analysis Support for DPG Development TO signed for Engineering Analysis Thermohydraulic FDR of CTS Q3 TO signed for Engineering Support in components for passing EC Resonance of CTS Contract signed for Single Framework Contract for Services for Design for CPTS FwC F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Diagnostics (1/3) Awarded: OPE-0669: Bolometer sensor prototypes to CSEM (Switzerland) (signed). OPE-0883: Development and Supply of Software Algorithms for ITER Magnetics Diagnostic ( Award April 2018) to Consorzio CREATE-RFX (about to be signed). Under-evaluation: OFC-0905: Manufacturing Engineering Support for the Diagnostics Systems (ex F4E-OMF-0666) - 8 offers received. OPE-0852: Supply of Inner Vessel Coils (IVC) Platforms (CFT April 2018). F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Diagnostics (2/3) Under preparation: OFC-0847: CPTS Preliminary and final Design (2 different task orders) (Target PA: October; CFT afterward). OPE-0762: MIC cables (Target PA: Q4; CFT afterward) OPE-0921: IVC-sensor heads. (Target publication July) Lot 01: Supply of Low-Temperature Co-fired Ceramic (LTCC) Sensor Heads; Lot 02: Supply of High-Frequency (HF) Sensor Heads; and Lot 03: Supply of Diamagnetic Coils. OPE-09??: Fission Chambers (Benoit?).CFT target Q3-Q4 2018 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Diagnostics (3/3) Under preparation: Plasma Position Reflectometers: market survey finished. Target CFT Q4 2018 (Design + Manufacturing). Collective Thomson Scattering: market survey finished. Target CFT Q1 2019 (Design + Manufacturing). Market Surveys On-going: IR Cameras: Market Survey closed – Market Analysis on-going CVD Neutron Detectors: closed – Market Analysis on-going Market Surveys Under Preparation: Clips, clamps and junction boxes for the MIC cables RH Connector F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Test Blanket Module Under preparation   Task Order Signed for Preliminary Design of Ancillary Systems phase I Q2 SC-PServ Task Order Signed for Preliminary Design of TBMs set phase I Task Order Signed for Safety Analyses for TBS PD phase I Under preparation OFC-0950 (3 lots): 1 lot for Preliminary Design of the TBM set , 1 lot for Preliminary Design for Ancillary System, lot 3: Safety studies and analysis. Target CFT: mid October. F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Site and Buildings and Power Supplies   Commitment for TB11 - Completion works Contract - 2019 Q1 SC-PSupply Contract Signed for TB18 Contract Q4 PSupply Site Security and Reception Services for the ITER Site 2019 signed SC-PServ TB12 - Commitment for Option 5.1 - Supply and Inst. PBS44 cable trays BLDG in the Baseline Q3 Option TB19 - Commitment for Option 2: Diagnostics above L2 ITER Site Cooperation Agreement for 2019 Cash ITER Site Host Agreement for 2019 Q2 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Site and Buildings and Power Supplies On-going OPE-0688: TB12 Design & Build of buildings 34, 37, 75, area 30 & 31, PBS 63-LC 09,04, 75 (B75 Safety Related), load centers, & infrastructure works + several options. 2nd phase started 30th May: 4 tenderers invited; deadline to offer postponed from 13th July to 25th September 2018. OPE-0754: TB13 Emergency Power Supplies. D&B buildings B44, B45, B46, and B47+ Electrical equipment. (Open procedure, deadline postponed from 10th May to 28th September 2018). OPE-0906: TB19 Painting and Coating For Tokamak Complex. (1st step 4th July). ITER site–April 2018 First segment of crown poured- 22 May 2018 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Supporting Activities (PM, and miscellaneous)    Market Survey Framework Contract for Engineering Support services in Thermo Hydraulics and Fluid Dynamics Q3 FWC Framework Contract for Seismic analysis and design of building and mechanical components of the ITER facility  N/A Framework Contract for Provision of System, Instrumentation and Control Engineering - support for conventional I&C systems Q4 Framework Contract for Provision of material characterization at cryogenic temperatures Task Order Signed for TO03 Lot 2 in Support of the MIR layer - DXL Senior/Junior SC-PServ Task Order Signed for TO26.1 for QA Support Staff QAG Task Order Signed for TO31.1 for QA Support Staff QAG Q2 Task Order Signed for TO32.1 for QA Support Staff QAG Task Order Signed for TO36.1 for QA Support Staff QAG TO 01.1 for FwC F4E-OMF-0895 Lot 2: Risk Management Support TO 02.1 for FwC F4E-OMF-0895 Lot 2: Risk Management Support TO 03 for OMF-0895 Lot 1: Project Performance Management Support - Diagnostics TO 04 for OMF-0895 Lot 1: Project Performance Management Support-Technical Support Systems TO 05 for OMF-0895 Lot 1: Project Performance Management Support - Antennas TO03 for OMF-0895 Lot 3: Planning Support Vacuum Vessel TO04 for OMF-0895 Lot 3: Planning Support Neutral Beams TO05 for OMF-0895 Lot 3: Planning Support BIPS TO06 for OMF-0895 Lot 3: Planning Support Configuration TO for Transportation Management fees 2020 F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Supporting Activities (PM, and miscellaneous) Under preparation: OMF-0937: QA Inspectors (extension from OMF-0789) – Q4 2018 OFC-0942: Nuclear Safety (most probably with ASN-IRSN-ENSTTI) – Q3 2018 Under evaluation: OMF-0895: Project Management services (3 lots) OPE-0834: LSU - Spanish Law Firms – 7 offers Awarded: OMF-0789: Quality Assurance and Surveillance Support inspectors for Protection Important Components of the ITER project – 3 lots (to APAVE, ASAP, COFREND, CEIDRE/EDF, Bureau Veritas, Hartford Steam Boiler Inspection Quality Ltd, AIB-VINCOTTE. F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Supporting Activities (Technical Support) Under preparation: OMF-0938: Electromagnetic Analysis – Q3 2018 OMF-0882: Nuclear Analysis Support (Analysis & Codes) – On Hold – Q4 2018 Awarded: OFC-0825: Mechanical Analysis – 2 lots Lot 1: Advanced Mechanical Engineering Design Analysis - IDOM Consulting (ES) Lot 2: General Mechanical Analysis - IDOM Consulting (ES) OMF-0878: Metrology Support Services Rank1: SETIS (FR) Rank2: AXIST (IT) OFC-0884: Multilink Inspection Tool to Fundacion Tekniker (ES) F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Broader Approach Broader Approach   Architecture of integration platform for BA Phase II Q4 PServ Contract signed for Engineering support for installation in Rokkasho 2019 Future contract for Materials and components for LIPAC installation 2019 PSupply Health and safety for operations on site JT-60SA Q3 SC-PServ Remote handling preliminary studies and R&D Q1 Support of design of cryopumps Contract for Engineering activities in support of enhanced TF coil performance TO 02 for Engineering and research and development support for JT-60SA commissioning TO 03 for Engineering and research and development support for JT-60SA commissioning Q2 TO 04 for Engineering and research and development support for JT-60SA commissioning TO 05 for Engineering and research and development support for JT-60SA commissioning Contract for Equilibrium Field coils PS spare parts Contract signed for cryoplant spare/replacement parts Part 2 Contract signed for Enhancements for injector components Contract signed for JT-60SA Cryopump Design and Manufacturing part 1 Contract signed for JT-60SA Divertor VUV spectrometer part 1 Contract signed for JT-60SA Fast Ion Loss Detector part 1 Contract signed for JT-60SA Pellet Injector Design and Manufacturing part 1 Contract signed for JT-60SA YAG Thomson scattering system part 1 Contractual activities for On site assistance from PS suppliers Engineering support for diagnostics F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

OPE-0909: Beam Dump Ionization Chambers, Broader Approach (1/2) Awarded OPE-0928: Nut Retention Plate Installation ( Accelerated procedure) to NIPPON ADVANCED TECHNOLOGY CO., LTD Under evaluation OPE-0909: Beam Dump Ionization Chambers, OPE-0910: HEBT-High Energy Beam Transport Line Cryo System, OPE-0923: Cables and Feedthroughs, F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Broader Approach (2/2) On-going OPE-0892: IFMIF cryomodule flexible connectors (OPE-0838 cancelled then negotiated with Spinner). OPE-0911: LIPAC (High Speed Digitizers and Control of the BEAM position)- Deadline 31st July (Open). Under preparation OPE-0943: HEBT (High Energy Beam Transport Line) secondary electrical board. (French and Italian potential tenderers identified).Open, target CFT: end of July). F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache

Thank you F4E Market Intelligence Group - ILO Meeting #40 – 10th July 2018 – Cadarache