Current as of 12/12/2017 RES-BCT.

Slides:



Advertisements
Similar presentations
Expanded Virtual Net Metering (VNM)
Advertisements

SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
Net Metering and Interconnection Stakeholder Discussion Net Metering and Interconnection Stakeholder Meeting September 21, 2012 Discussion of.
SRC Application Process Fall 2014 Version: November 12, 2014.
PG&E’s General Market Virtual Net Metering Schedule NEMV
PRACTICAL ASPECTS OF CUSTOMER OWNED GENERATION A DISCUSSION OF INTERCONNECTION POLICIES, METERING STRATEGIES AND BILLING CONSIDERATIONS IMUA ANNUAL CONFERENCE.
The Community Renewable Energy Amendment Act of 2013.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
PG&E’s Solar Choice Programs
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E’s Sustainable Communities Program and Support for our Solar.
July 9, 2010, AB 920 Workshop Pacific Gas and Electric Company.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
New Jersey Community RE / Solar Programs* New Jersey Board of Public Utilities Net Metering & Interconnection Rules Stakeholder Meeting July 23, 2008 *FOR.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
1 California Solar Initiative Low Income Multifamily Program Public Workshop March 17, 2008 San Francisco, CA.
1 CSI Staff Proposal Workshop Energy Division California Public Utilities Commission November 17, 2010.
ARK NET METERING LAW ALLOWS ELECTRIC CUSTOMERS TO INSTALL RENEWABLE ENERGY GENERATION EQUIP, CONNECT IT TO THE GRID, AND USE THE ELECTRICITY GENERATED.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
Philippine Feed-In Tariff System Implementation 1.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
The time to jump into SOLAR is … NOW! Lindsay Joye, P.E. Solar Program Manager City of Palo Alto Utilities November 5, 2015.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
May 9 th, 2016 California Public Utilities Commission Power Charge Indifference Adjustment (PCIA) Workshop.
SCE Green Rate and Community Renewables Programs 2016.
Mimi Frusha, Renewable Funding
Interpreting HB 3693 Interstate Renewable Energy Council
Solar, according to Click
Distribution Grid and Interconnection Stakeholder Group
Sunverge Energy – SGIP Overview
iLab Training for VU Departments & Users
iLab Training for VUMC Departments & Users
Self-Generation Incentive Program (SGIP)
Solar in NYC – Pratt SOLAR ENERGY SYSTEMS David Buckner President
San Francisco’s Community Choice Program
Diving Into Bills I wish….
FY2007 Billing Rate Proposal Preparation (Part I)
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Distributed Generation Chau Nguyen, Pricing & Sales Support
Presented to the NARUC 2013 Winter Meeting
Narragansett Electric Rate Classes
East Bay Community Energy Local Development Business Plan
Phase 3 Solar Feasibility Study Findings and Recommendations
Photovoltaic Systems Engineering Session 27
Pseudo-tie business procedure
Community Solar & Group Net Metering - Building the Diversified Grid
ELECTRICITY AND ENERGY PV METERING/BILLING – NOVEMBER 2017
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Net Metering John McComb: P.E.
Customer Dedicated Solar
Elizabeth Hutchison February 26, 2016
2500 R Midtown Sacramento Municipal Utility District
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
City Council April 30, 2018 Item 13
Net Metering John McComb: P.E.
SOLAR POWER – BOONVILLE WWTP CASE STUDY September 19, 2018 Charles R
VUMC Core Manager Customer Support Guide
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Herb Stevens Jeff Lesk Genevieve Hulick
Elizabeth Hutchison February 26, 2016
Unrelated Business Income Tax
Stand alone vs. interconnected
Photovoltaic Systems Engineering Application to PV Systems
Photovoltaic Systems Engineering Session 23
Pseudo-tie business procedure
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
PG&E EV Fleet Program.
PG&E EV Fleet Program.
PA Supplier Workshop Net Metering September 10, 2019.
Presentation transcript:

Current as of 12/12/2017 RES-BCT

What is RES-BCT? RES-BCT stands for Renewable Energy Self-Generation Bill Credit Transfer. Schedule RES-BCT program allows a “Local Government” with one or more eligible renewable generating facilities to export energy to the grid and receive generation credits for benefitting accounts of the same Local Government. PG&E’s RES-BCT Tariff was approved by the CPUC effective May, 3, 2010. The RES-BCT program cap for PG&E is 105.25 MW. As of the third quarter of 2017, 18.3 MW is interconnected and 47.9 MW is in process. This is explained in more detail on slide 13.

Local Government a city, county, whether general law or chartered, city and county, special district, school district, political subdivision, or other local public agency, or a joint powers authority (JPA) formed pursuant to the Joint Exercise of Powers Act that has as members public agencies located within the same county and same electrical corporation service territory, if authorized by law to generate electricity. an individual "Campus" (defined as an individual community college campus, individual California State University campus, or individual University of California campus) of the University of California or the California State University. Local Government is NOT: The state or any agency or department of the state. RES-BCT Applicants must sign a form certifying they meet the definition of a “Local Government” to enroll.

Generating Account Account which serves the eligible renewable generator. Must be no more than 5MW in capacity. Must be on TOU rate. Must take Bundled service. Is interconnected with PG&E’s electric system. Meets the Renewables Portfolio Standard (RPS) definition (as defined in PU code section 399.12 e). Is sized to offset part or all of the electricity load (kWh) of the Arrangement. Is not taking service under any other NEM (Net Energy Metering) tariff. The Local Government doesn’t sell the exported electricity to the grid to a third party. Since the Generator will only offset the GEN component of the accounts there is no benefit of oversizing the Generator Generator can have a load or be on Green-Field, which means there is no load attached to it

Benefitting Account Any electric account eligible to receive generation credit elected by the Local Government. Must be located within the geographical boundary of the same Local Government, or for a campus, within the geographical boundary of the city or city and county. Owned, operated, or on property leased by or under the control of the same Local Government. Takes service on a bundled, Time of Use (TOU) rate schedule. Located in PG&E service territory and receives electric service from PG&E. A Local Government can add or delete a Benefitting Account, or reassign the Generating Account or Benefitting Accounts Percentages once a year by providing PG&E 60 days notice.

B=Benefitting Account Arrangement Requirements Arrangement is defined as the pairing of a Local Government’s Generating Account(s) along with the designated Benefitting Account(s) that will be receiving the allocated export credits. A Local Government can have more than one Arrangement but each Arrangement must have no more than 50 Benefitting Accounts. The Benefitting and Generating Accounts can not be shared between different Arrangements G1 B G2 B G= Generating Account B=Benefitting Account Arrangement 1 Arrangement 2

Case Study: Geographical Boundary Summary: Local government of Mendocino County is in control of properties in Mendocino County (represented by ), and the local government is also in control of one building in Sonoma County (represented by ). Would this arrangement be eligible for RES-BCT? Based on RES-BCT rules, Mendocino County’s building in Sonoma County is not eligible since it is not in the same geographical boundary of the same local government The red line shows PG&E territory. Reminder: The local government must be in PG&E territory.

Case Study: Campus Summary: Berkeley is a university with multiple locations. It has a Generating Account located at the Berkeley Campus. At which Campuses can the Benefitting Accounts be located? San Francisco Campus Berkeley Campus San Mateo Campus Berkeley Campus is eligible to have Benefitting Accounts. San Francisco and San Mateo Campuses are not. All Generating and Benefitting Accounts have to be at one Campus

Metering Requirements A Generating Account under RES-BCT must have PG&E TOU metering: Capable of separately registering the flow of electricity in two directions. Capable of allowing PG&E to bill the Generating Account for its usage according to its TOU Otherwise Applicable Schedule (OAS). Capable of allowing PG&E to determine the Monthly Bill Credit for the Generating Account according to its TOU OAS. A Benefitting Account under RES-BCT must have the PG&E meter needed for PG&E to bill the Benefitting Account according to its TOU OAS.

Typical Generating Account Metering Net Generation Output Meter (NGOM) is not needed. The meter must be capable of separately registering the flow of electricity in two directions (interval meter). Only the exports from meter are used for credit not the NET May be situated at an existing customer site. PG&E Grid Load No NGOM meter. Meter needs to be an interval meter to be able to record the export and import separately If no data on the Gen meter then it doesn’t get billed till they get data M Transformer

Costs Application Cost for RES-BCT is $800 The Local Government is responsible for all interconnection costs. The Local Government is responsible for all meter related costs if it does not have the metering necessary to bill on this tariff. The costs associated with the transfer of a Bill Credit shall include all billing-related expenses; which the Local Government is responsible for: Monthly Billing Administrative Charge is $30.00 per Generating Account One time Billing Setup Recovery Charge is $500.00 per Generating Account

Important Citations PU Code 2830: all costs associated to the metering shall be the responsibility of the local government for RES-BCT projects. Paragraph 2: A benefitting account receives service under a time-of-use rate schedule. Paragraph 4: The electrical output of the eligible renewable generating facility is metered for time of use to allow calculation of the bill credit based upon when the electricity is exported to the grid. Paragraph 5: All costs associated with the metering requirements of paragraphs 2 and 4 are the responsibility of the local government. Rule 21, Table E2, Sheet 62: All costs associated with interconnection of an Eligible Renewable Facility at the Generating Account are the responsibility of the local government.

Allocation of Credits The Utility will ask the Local Government to designate the Benefitting Accounts and percentage allocation per Benefitting Account at the time of interconnection. Energy credits (known as “Bill credits”) are calculated monthly by multiplying the TOU generation component (gen comp) of the energy charge in the rate schedule (OAS) for the Generating Account, by the amount of energy(kwh) exported to the grid during the corresponding time period. Each month the credits are allocated to offset Generation charges on the designated benefitting account. The Generating Account may be a Benefitting Account. Credit if valued at the “OAS” (otherwise applicable rate schedule) the customer is eligible for. AB920 mechanism is completely separate from other credits. valued at ~$0.04 per kWh

Example: RES-BCT Allocation Solar Panels at Generating Account LG Account #4 10% Example: Solar Generation at Generating Account = 2000kWh Load at Generating Account = 1000kWh Export from Generating Account = 1000kWh OAS Generation Rate Schedule = $0.10/kWh 1000kWh x $0.10/kWh = $100 LG Account #3 15% Generating Account: $50 LG Account #1= $13 LG Account #2= $12 LG Account #3= $15 LG Account #4=$10 LG Account #2 12% The benefitting account must be located within the geographical boundary of the same Local Government LG Account #1 13% LG = Local Government PV Exports are recorded as it flows to the grid. The kWh are valued at the Generating Account TOU OAS, turned into $$$$$, and then allocated as RES-BCT credit for individual tenant accounts

True-Up and Changes to Accounts Each month unused Bill Credits are carried over to the following month until the completion of 12 months. At the end of 12 months, any unused Bill Credits are: First, netted (gen credit to gen charges) for each benefitting account over its true-up period (Account True Up) Second, shared among benefitting accounts until all excess credit is allocated against any remaining gen charges; (Arrangement True Up) Any remaining credit after that is zeroed out. A Local Government may elect to change (add/delete) the Benefitting Account(s) or reassign the allocation percentages no more than once per year within a 12-month period. The Utility must be provided with a notice of at least 60 days. The Local Government gets one credit check not many based on the number of their benefitting accounts

Standby and Non By-passable Charges Standby: RES-BCT customers are NOT exempt from Standby charges. Departing Load Charges: RES-BCT customers pay Departing Load Charges on load served by the generator only at the Generating Account. These charges are billed via a separate departing load charge statement each month. The amount of the charge will vary depending on the technology selected. Email TariffAssistanceHotma@pge.com for questions regarding RES-BCT.

How to apply and where to learn more Website: www.pge.com/resbct

FAQ

FAQ Question 1: The current RES-BCT customer (local government) owns a multifamily housing project. The local government pays for the utility bill portion for the common area, but the tenants are paying their own utility bill. Can the local government add the common area and the tenants on their current benefitting accounts? Answer 1: Only the common area is eligible for benefitting account, assuming it is the same name as the local government. The tenants would not be eligible, since the bill is not under the same name as the local government. Question 2: The current RES-BCT customer (local government) has 1MW of solar. They want to add another 2MW of solar. Do they have to submit another application? Who pays for the distribution and transmission upgrades if need be? Answer 2: Since the local government is adding to their current system they need to submit a new application. The local government is responsible for all the costs associated to interconnection including the distribution and transmission upgrades if need be. And the language from PU code 2830: (3) The benefitting account is the responsibility of, and serves property that is owned, operated, or on property under the control of the same local government that owns, operates, or controls the eligible renewable generating facility.

FAQs Question 3: The current RES-BCT customer (local government) owns a building in a different county and wants to add that building to their benefitting account. Can the local government do that? Answer 3: No, all of the accounts (generating and benefitting accounts) have to be in the same geographical boundary of the local government. Question 4: A local government wants to install 4MW of solar. Some of the local government’s benefitting accounts are not on TOU rate. Is that OK? Answer 4: No, all of the accounts (generating and all benefitting accounts) have to be in TOU rate. And the language from PU code 2830: (3) The benefitting account is the responsibility of, and serves property that is owned, operated, or on property under the control of the same local government that owns, operates, or controls the eligible renewable generating facility.

Where to Learn More Web Tariff Book: (RES-BCT) RES-BCT FAQ https://www.pge.com/tariffs/index.page ‘Electric Rate Schedules’ dropdown menu RES-BCT FAQ www.pge.com/resbctfaqs