Kansas City Southern Railroad Quiet Zone Plan

Slides:



Advertisements
Similar presentations
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Advertisements

Quiet Zone Joint Police & Streets Committee Meeting Village of Glendale January 16, 2007.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
Golf Cart Ordinance. Governing Statutes F.S Operation of Golf Carts on Certain Roadways: A golf cart may be operated only upon a county road.
Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.
RAILROAD CORRIDOR QUIET ZONES A Quality of Life Solution.
Locomotive Horn Rule Regulations
Way Side Warning System Toth Industries, LLC Arlington Heights, IL T rackside.
Department of Transportation NTMP 2.0 Neighborhood Traffic Management Program TAC Meeting December 11, 2009.
2008 Mid-States Highway Rail Grade Crossing Safety Conference.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Module 13: Highway-Rail Grade Crossings (HRGC)
1 FRA’s Grade Crossing Safety Program 2012 Southeastern Rail Highway Safety Conference Charlotte, NC.
Temporary Traffic Control Standards Update. Why? Came into this position soon after TC details became TTC standards about 1.5 years ago (2/13/2013) As.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Federal Railroad Administration's Ruling:
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
RAILROAD-HIGHWAY GRADE CROSSING HANDBOOK AUGUST 2007 REVISION PRESENTED BY KURT ANDERSON 2008 Mid-States Highway Rail Grade Crossing Safety Conference.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
How would a truck get through? Any suggestions?. No parking allows access.
Crossing Closures & Quiet Zones National Association of Counties Rail Conference Naperville, Illinois April 2011.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Quiet Zone along FEC Corridor Paul Calvaresi Broward MPO 1.
CITY OF RAINIER RAILROAD CROSSINGS 1. Team Members Matthew DeGeorge Robert Acevedo Josh Crain Jim Harvey Heather Wenstrand 2.
POLK RAIL QUIET ZONE ANALYSIS Conditions Assessment CSX “S” Line March 24, 2016.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
1 Eagle P3 Project Update FasTracks Monitoring Committee May 12, 2015.
1 Proposed Amendments to the Verification Procedure for In-Use Diesel Emission Control Strategies August 23, 2012 California Environmental Protection Agency.
Railroad Quiet Zone (RRQZ) And Crossing Safety Improvement Project.
Abstract It is the goal of this project to create a traffic sign that will stand out amongst all of the other distractions that drivers face. The manner.
City of San Mateo 2016 Reach Code
MBTA/MassDOT RAILROAD QUIET ZONES
Chapter 3 Regulatory, Warning & Guide Signs Overview
City of Charlottesville
Earhart Elementary September 2017
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Joint Police & Streets Committee
Jefferson County SA Red Rocks Site Approval
Downtown Valdosta Truck Traffic Mitigation Study
TOPS TRAINING.
NPRR 816 / Vendor Index Definitions
The Development Process
Feather River West Levee Project Project Area C May 24, 2013
Santa Cruz avenue sidewalks Project
Main Street Improvements
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Grade Crossing Safety Jason l. sanchez manager public projects
Salmon Arm Chamber of Commerce Traffic Study June 2 – 8, 2016 Presentation to City Council November 28, 2016.
Environmental Assessment PUC Application Process
Wilson Ave. / 56th St. Rezoning Considerations
Downtown Valdosta Truck Traffic Mitigation Study
Safety Audit Components
INTRODUCTION OF MINIMUM ENERGY PERFORMANCE STANDARDS (MEPS) & SAFETY REQUIREMENTS FOR ELECTRIC LAMPS 25 OCTOBER 2018 LW JELE.
Adoption of the FY Capital Improvement Program Budget
Application for Zoning Amendment
Joint Police-Streets Committee Meeting
Curricular Practical Training Workshop
Bells, Lights, & Whistles Hop On The Bus, Gus Cool Rules Big Yellow
Public Scoping Meeting May 3, 2010
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Drive Right chapter 2 Thursday, June 27, 2019 lesson 2.1 TRAFFIC SIGNS
Alaska Railroad DOT Mtg 7/13/10
Rules of the Road Chapter 10
Circumnavigation (bike ride)    Evening, July 3  Art in the Park All Day
Charter School Legislation HB 1390 and SB 737.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Kansas City Southern Railroad Quiet Zone Plan An Overview Presented by : Santiago Araque, Kimley-Horn

Train Horns On KCSR In Laredo 32 At Grade Crossings 16 Trains Per Day 8 Day Trains (6AM – 6PM) 8 Night Trains (6PM – 6AM) Crossing Horns – 2 Long, 1 Short, 1 Long 2,048 32 x 16 x 4 = Horn Blasts Every Day (1,024 Horn Blasts every night)

Whose Affected?

Quiet Zone Requirements

Quiet Zone “Minimum Requirement” Gates, Flashing Lights, Railroad Cabin With White Light – All Public Crossings 6 out of 32 Existing Crossings Do Not Have Gates Zaragoza Street Santa Isabel Avenue Vidaurri Avenue Santa Rita Avenue Juarez Avenue Marcella Avenue Gate Installation Costs Are $350,000 per Crossing (approx.) 6 x $350k = $2.1 million “Train Does Not Sound Horn” Warning Signs

Quiet Zone “Risk” Increased risk without horn Risk Indexes National Significant Risk Threshold (NSRT) Increased risk without horn Risk Indexes National Significant Risk Threshold (NSRT) Quiet Zone Risk Index (QZRI) – Calculated Quiet Zone Risk Index (QZRI) Meets Quiet Zone Requirements National Significant Risk Threshold (NSRT) Quiet Zone Risk Index (QZRI) Does not meet Quiet Zone Requirements

Safety Measures Supplemental Safety Measures VS Alternative Safety Measures Temporary or Full-Time Closure of Public Crossings Gates with Median Islands or Channelization Devices (median and driveway limitations) Four-Quadrant Gates One Way Streets with Gates Wayside Horns All ASMs must be approved by FRA Must be tested prior to approval and effectiveness shown Approximately 1 Year for approval Alternative Safety Measures (ASMs) -do not fully meet requirement of SSMs

Quiet Zone Study 3 Different Quiet Zone Alternatives proposed Alternative 1 and Alternative 2 – Full Quiet Zone (Arkansas to Vidaurri) Alternative 3 – East Laredo Quiet Zone (Arkansas to Monterrey Ave) All alternatives excluded Zaragoza and Santa Isabel Crossings outside of Quiet Zone must be minimum of 600’ away from proposed quiet zone Vidaurri must be closed in order to have full Quiet Zone Alternative 1 Alternative 2 Alternative 3 Cost $ 1,194,000 $849,000 $476,000 QZRI 14,269 14,083 14,343 NSRT 14,347

Alternatives Studied Alternative 3 Alternative 2 Alternative 1 Limits: Vidaurri to Arkansas 1 Downtown Closure 3 Gate Installations 1 Upgrades from 2 gates to quad Gates 0 ASM’s 3 SSM Medians Total Cost: $1,194,000 QZRI: 14,269 NSRT: 14,347 Alternative 2 Limits: Vidaurri to Arkansas 2 Downtown Closure 2 Gate Installations 1 Upgrades from 2 gates to quad Gates 0 ASM’s 3 SSM Medians Total Cost: $849,000 QZRI: 14,083 NSRT: 14,347 Alternative 3 Limits: Monterrey to Arkansas Only SSM’s East Quiet Zone 0 Crossing Closures 1 Gate Installation 1 Upgrades from 2 gates to quad Gates 0 ASM’s 2 SSM Medians Total Cost: $476,000 (2018) QZRI: 14,343 NSRT: 14,347

Not Studied in this Alternative Proposed Safety Measures Crossing Alternative 1 Alternative 2 Alternative 3 Vidaurri Closure Not Studied in this Alternative Santa Rita Gates Juarez Convent Median (SSM) Corpus Christi Quad Gates* Marcella Market Quad Gates Seymour Market E Arkansas $1,194,000 $849,000 $476,000 *Mitigation not required in 2018 and not calculated in cost shown. Mitigation may be established in the future to lower QZRI.

Next Steps Hold a staff and public meeting to receive stakeholder input. Produce a Final Report upon the MPO’s and City’s recommendations. Prepare the official quiet zone application packet, using information from the FRA calculator. Prepare design plans for crossing closures and safety improvements at crossings Issue the following to the FRA and KCSR Notice of Intent (NOI) to establish a quiet zone Plans showing safety improvements Address any NOI review comments received Install safety improvements and No Train Horn signs, covering the signs with bags Request inspection of improvements from KCSR Issue the Notice of Establishment (NOE) for the quiet zone, stating the date that horns are to go silent.