2017 CG MOD 33 updates CG Planning Meeting Feb 9, 2017

Slides:



Advertisements
Similar presentations
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
Advertisements

1 FY11 Title I Common Program Review Findings Julia Foodman & Matthew Nixon Title I Technical Assistance & Networking Session May 23, 2011.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
© Crown copyright Met Office ACRE working group 2: downscaling David Hein and Richard Jones Research funded by.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ.
Testing Without Executing the Code Pavlina Koleva Junior QA Engineer WinCore Telerik QA Academy Telerik QA Academy.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Tracy Rolstad TSS Chair TSS Chair Report October 2014 Salt Lake City, UT 1.
CS & ECE Senior Design Project Winter 2008 Karen Davis Chia Han Altan Ferendeci.
We are paperless and scan 100% of our documents We maintain ZERO paper student files We destroy all paper via Secure Document Destruction Currently use.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Introduction Peak Hosted Advanced Applications. 2 What is this project all about? Enhanced TOP situational awareness and ability to perform real-time.
1 Early Childhood and Accountability OSEP’s Project Director’s Meeting August 2006.
What is a Teaching Portfolio?
QAA Summative Review Staff Briefing Leeds College of Art 8 September 2010.
March 7, Trade Software Developer Technical Seminar March 7, 2012 Cargo Release Scope and Functionality  Steven Lubel, CBP, ACE Program, Technical.
The Sarbanes-Oxley Act of PricewaterhouseCoopers Introduction of Panel Members The Sarbanes-Oxley Act of 2002 Sample testing of controls Marcus.
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
ISO Comparison – CAISO Alex Lee (ERCOT)
© 2013 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1 If you cannot locate an individual in order to add Bill to ID(s) or enable.
TAA1 TEACHER WORKSHOP Learning and Innovation. PROGRAM OUTLINE Workshop Introduction Overview of the TAA Scheme Outline of the TAA1 Process TAA 1 Action.
Phoenix Campus Faculty Refresher Training. This workshop will provide faculty with updated knowledge and tools necessary to be effective in the classroom.
Texas Regional Entity Report Mark Henry June 6, 2008.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
P.E.A.K Program Calendar Before School 7am-8am After School 3:30pm-5:30pm Oct , Nov. 3-6, 10-13, Dec. 1-4, 8-11, Jan. 5-8,
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
TGDC Meeting, Jan 2011 Path Forward for FY11 UOCAVA Activities Nelson Hastings National Institute of Standards and Technology
TOTAL QUALITY MANAGEMENT
MTT Standard 5, Competency 9 Final Assessment Click to begin.
Training Workshop on Business Process Analysis in International Trade Joint Workshop on Trade Facilitation and the Single Window September 2015,
Interchange Scheduling & Accounting Subcommittee (ISAS) Charles (Bud) Freeman, SCL W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
CMGT 410 Week 1 Individual Project Proposal Check this A+ tutorial guideline at 410/CMGT-410-Week-1-Individual-Project-
Academic Program Review Workshop 2017
Topics Corporate Overview – Transmission Expansion Planning - Members
Microsoft FastTrack & FY16 Cloud PBX Adoption Offer
Kiran Kumar Chereddy, MCAA Treasurer
MRBB Technical Committee Update to the MRBB
Western Electricity Coordinating Council
Internal and external control in an automated environment
SAP SuccessFactors extension with SAP HANA Cloud Platform Innovation Use Case SAP & Partner Confidential
SOUTH BALTIC CROSS-BORDER CO-OPERATION PROGRAMME
Operations Training Subcommittee (OTS)
Path Operator Implementation Task Force
Eleanor Ewry Base Case Coordination Subgroup Chair
Overview of the FEPAC Accreditation Process
National Product Catalogue Overview
Performance Management System
Curricular Practical Training
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
Jonathan young ColumbiaGrid
Applying to a Selective ADMISSION program
2017 System Assessment Jonathan Young February 2017
White Paper – Least Cost Electricity Procurement
Tracy Rolstad TSS Chair
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
Project Management Professional (PMP)®
IEEE IMT-Advanced Review Process
2017 CG Transient Stability Study CG Planning Meeting Feb 9, 2017
WIAB WECC Interchange Authority Backup
2018 CG MOD 33 updates CG Planning Meeting June 7, 2018
Working Party on Brakes and Running Gear (GRRF) General information
Special AP/CFS Open House
Curricular Practical Training
Public Utilities Specialist
Presentation transcript:

2017 CG MOD 33 updates CG Planning Meeting Feb 9, 2017

In This Presentation Review of MOD 33 meeting in Jan 10 Meeting Action Items

Jan 2017 Meeting Review Discussion of the MOD 33 standards and technical issues, prepared to develop a CG process document. Review Existing Process from CAISO Discussion for future training and work group activities

Action Item: Process Document Outline for MOD 33 process document will be sent out at the end of February The final MOD 33 process document around 6/1/2017 Chelan PUD offer to share their MOD 33 process document to members when finalized. Confirm with NERC of using 6/30/2019 as the deadline Power Flow and Dynamic validation evidence. (confirmed)

Action Item: Event Selection CG MOD 33 will focus on major system events and main grid validation. Members can perform their own validation of local events on local system A MOD 33 work group will be formed for selected events Utilities will report in CG planning meeting for any significant events that can be used for MOD 33 validation. CG will call for participation after an event has been selected for MOD 33 purpose by at least one member. Once an event has been selected, a workgroup will be formed to hold regular meetings to work on the MOD 33 validation for this event. It should be no less than 2 months (planning meeting intervals), after an event being submitted to form a work group

Action Item: Data Acquisition Members provide CG an official authorizations for using measurement data (e.g. from Peak RC).

Action Item: Base case preparation MOD 33 will be primarily performed for event scenario. Power Flow and Dynamic validation can be performed using the same event together. MOD 33 base cases can be derived from two sources: Peak RC, or self developed by CG and members. On top of the base cases developed for MOD 33 events, CG will facilitate to develop certain peak hour cases (heavy summer or heavy winter) for power flow validation purpose (no event necessary).

Action Item: Acceptable Discrepancy At this point, members cannot determine the appropriate quantitative metrics for acceptable discrepancy. It is expected to use some general ranges with exception allowed. The range is expected to improve along the process. CG will obtain an existing recent validation case and measurement data from BPA, do some comparison and get an idea of the discrepancy. The discrepancy will be sent to members for review.

Action Item: Unacceptable Discrepancy In CG process document, a general guideline can be used for resolution of the unacceptable discrepancies. The unsolved discrepancy should also address the discrepancy come from the software aspects. Peak RC should also be involved for certain type of discrepancy observed.

Action Item: Software Platform PowerWorld will be the main tool

Action Item: Training CG will check with WECC for a training of preparing base cases for MOD 33 purpose. If available, CG will host a workshop. On the workshop, BPA will also give a training on local data validation and tutorial on base case tools.

Question: Bo Gong, gong@columbiagrid.org