Theme group for b-delayed neutron measurements

Slides:



Advertisements
Similar presentations
Recent achievements and future challenges of the Spanish research in experimental Nuclear Physics José Benlliure Universidad of Santiago de Compostela.
Advertisements

RIBF P. Coleman-Smith, T. Davinson, A. Estrade, C. Griffins, L. Harkness-Brennan, G. Lorusso, K. Matsui, P. Morrall, S. Nishimura, V.
Roger Caballero-Folch (DFEN –UPC) València, 15 de juliol de 2013 β-decay half-lives and β- delayed neutron emission measurements for r-process nucleosynthesis.
ROGER CABALLERO FOLCH, FRS User meeting GSI, 28 th November 2011 S410 EXPERIMENT GSI – SEPTEMBER 2011.
ROGER CABALLERO-FOLCH Universitat Politècnica de Catalunya 26 de febrer de 2013 NUSTAR ANNUAL MEETING GSI Darmstadt, Germany Beta dELayEd Neutron.
Nuclear Physics research in Spain José Benlliure Universidad of Santiago de Compostela Ministerio de Ciencia e Innovación Present: Human resources, infrastructures.
ROGER CABALLERO FOLCH, 1 de juny de Introduction: Astrophysics and Nuclear Physics motivation Experiment: Setup and detectors BEta deLayEd Neutron.
Measurement of the GMR and the GQR in unstable nuclei using the MAYA active target C. Monrozeau (Ph. D), E. Khan, Y. Blumenfeld.
JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
Fragmentation of very neutron-rich projectiles around 132 Sn GSI experiment S294 Universidad de Santiago de Compostela, Spain Centre d’Etudes Nucleaires.
J. Pereira  -decay studies of r-process nuclei near 137 Sb Jorge Pereira NSCL/MSU Frontiers 2005, MSU, August 2005.
ROGER CABALLERO FOLCH, Barcelona, 9 th November 2011.
The BEta deLayEd Neutron emission measurements
Superheavy Element Studies Sub-task members: Paul GreenleesJyväskylä Rodi Herzberg, Peter Butler, RDPLiverpool Christophe TheisenCEA Saclay Fritz HessbergerGSI.
M. Dracos, CEA, 10/04/ Double Beta experiment with emulsions?
Study of the  -decay of 12 B Proposal to INTC 25th February 2002 SpokespersonH.O.U. Fynbo ContactpersonU.C. Bergmann.
Workshop on Physics on Nuclei at Extremes, Tokyo Institute of Technology, Institute for Nuclear Research and Nuclear Energy Bulgarian Academy.
Beta and particle decay spectroscopy at the Super FRS Zenon Janas Nuclear Spectroscopy Division Warsaw University.
Isospin impurity of the Isobaric Analogue State of super-allowed beta decay experimental technique isospin impurity determination Bertram Blank, CEN Bordeaux-Gradignan.
Status of the ISOLDE DECAY STATION - IDS Hilde De Witte IDS status report, ISCC, June 24 th 2014.
Setups (BELEN, MONSTER  D. Cano-Ott/ CIEMAT) Implantation detector (SIMBA, AIDA (>autumn 2010) ) Beams N=50 (78Ni): 124Sn (?) N=82 (132Sn, 130Cd): 136Xe,
Beta strength measurements near to the 3rd r-process peak IFIC-Valencia Jose L. IFIC-Valencia PRESPEC Decay Workshop, Brighton, January 12-13, 2011.
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas D. Cano-Ott DESPEC/HISPEC Coll. Meeting, 15th-16th of June 2005-Valencia.
In-beam performance of AGATA-DEMONSTRATOR Ideas for the firsts commissioning experiments of the AGATA-DEMONSTRATOR campaign at LNL-Legnaro F. Recchia INFN-LNL.
Proton emission from deformed rare earth nuclei: A possible AIDA physics campaign Paul Sapple PRESPEC Decay Physics Workshop Brighton 12 January 2011.
DESPEC A Algora IFIC (Valencia) for the Ge array working group.
The DESIR physics workshop (Leuven 26 th – 28 th May) Paul Campbell Present status… Community interests… The future experiments…
Progress in  half lives of nuclei approaching the r-process path at N=126 José Benlliure Universidad de Santiago de Compostela, Spain INPC 2007.
Production and beta decay lifetimes of heavy neutron-rich nuclei approaching the r-process path Teresa Kurtukian-Nieto Universidad de Santiago de Compostela.
Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,
4th International Summer School « Nuclear Physics Methods and Accelerators in Biology and Medicine » Monte-Carlo simulations : FLUKA vs. MCNPX Maxime ODEN.
Summary of the NuSTAR neutron detector working group meeting M. B. Gómez (UPC) / D. Cano Ott (CIEMAT)
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Jorge Agramunt Ros BRIKEN DAQ Status. DAQ Integration, tests and background measurements at RIKEN. Jorge Agramunt Ros 3º BRIKEN Workshop July 2015.
Albert Riego, Guillem Cortes, Francisco Calviño July 22 th, 2015 Universitat Politecnica de Catalunya, Barcelona (Spain) Third BRIKEN WORKSHOP – IFIC (Valencia,
Useful information's on the site / equipment available at RIKEN for the BRIKEN project Gabor Gyula KISS RIKEN Nishina Center Radioactive Isotope Physics.
3 rd BRIKEN WORKSHOP: Welcome! 3 rd BRIKEN WORKSHOP, IFIC, Valencia 22-24/07/2015 C. Domingo-Pardo IFIC (CSIC-University of Valencia)
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
Recent achievements and future challenges of the Spanish research in experimental nuclear physics José Benlliure Universidad of Santiago de Compostela.
EURISOL DS Task 11.2 Universidad de Santiago de Compostela, Spain Eurisol DS: task 11 meeting March‘05.
2 nd BRIKEN WORKSHOP: An Overview of the Project 2 nd BRIKEN WORKSHOP, RIKEN Nishina Center 30-31/07/2013 C. Domingo-Pardo IFIC (CSIC-University of Valencia)
M. B. Gómez et al. SEN, UPC, Barcelona Total Absorption  - Ray Spectrometer: DTAS 4  Neutron Counter: BELEN Neutron Time of Flight Spectrometer: MONSTER.
Three years of cross-section measurements of (n,xn) threshold reactions at TSL Uppsala and NPI Řež O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová,
Advanced Implantation Detector Array (AIDA): Update & Issues Tom Davinson School of Physics The University of Edinburgh presented by Tom Davinson on behalf.
Proton emission from deformed rare earth nuclei Robert Page.
Commissioning of the n_TOF second experimental area at CERN 101 o Congresso Nazionale della Societa’ Italiana di Fisica, Roma, Settembre 2015 Lucia.
D. Cano Ott – HISPEC/DESPEC meeting, 8 th of October - Calcatta Status of the MOdular Neutron SpectromeTER (MONSTER) for  -delayed neutron measurements.
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions Zhong Liu University of Edinburgh On behalf of the AIDA Collaboration (Edinburgh,
Seoul National University On behalf of J-PARC E18 Collaboration
Physics opportunities with heavy-ion detectors in the CR
Proton emission from deformed rare earth nuclei: A possible AIDA physics campaign Paul Sapple PRESPEC Decay Physics Workshop Brighton 12 January 2011.
The r process: Towards the (experimental) terra incognita
Efficiency versus energy resolution
Status of the AGATA installation at GANIL
Decay spectroscopy with LaBr3(Ce) detectors at RIKEN and GSI
Maria Kmiecik, Giovanna Benzoni, Daisuke Suzuki
DSSSD for b decay investigations of heavy neutron-rich isotopes
SIGMA: a detector for γ-ray spectroscopy & imaging Dr Laura AGATA/GRETINA Collaboration Meeting
Search for Proton Radioactivity in the Trans-lead and Sub-tin Regions
Beta strength measurements near to the 3rd r-process peak
Perspectives for Nuclear Spectroscopy at the UNILAC
Fixed Decay Station at ISOLDE
Local coordinator: S. Nishimura
O. Svoboda, A. Krása, A. Kugler, M. Majerle, J. Vrzalová, V. Wagner
Efficiency versus energy resolution
Plans for LHC computing in Spain
Double Beta experiment with emulsions?
Advanced Implantation Detector Array (AIDA)
Advanced Implantation Detector Array (AIDA)
Presentation transcript:

Theme group for b-delayed neutron measurements Setups (BELEN, MONSTER  D. Cano-Ott/ CIEMAT) Implantation detector (SIMBA, AIDA (>autumn 2010)) Beams N=50 (78Ni): 124Sn (?) N=82 (132Sn, 130Cd): 136Xe, 238U, others (150Nd,154Sm?) N=126: 238U, 208Pb, (197Au) Timeline for tests and experiments

(Near) Timeline Summer 2010: Neutron background test at S4 (5 single BELEN detectors): Implementation of BELEN and SIMBA into the GSI DAQ Spring 2011?: Setup and test of BELEN-30 at GSI, first parasitic in-beam tests, then min. 2 weeks break (no exp. @ S4) Early summer 2011?: Beamtime (6 days S323, 7 days S410) >end of 2011- mid 2013: AGATA is coming, no BELEN measurements possible!  Move BELEN to other labs 2016(?): during construction of Super-FRS: experiments possible

N=82: Approved experiment (S323) GSI proposal Pn (%) QRPA t1/2 exists identified

N=126: Approved experiment (S410) GSI proposal Pn (%) QRPA t1/2 exists identified

BEta deLayEd Neutron detector (BELEN) Efficiency for setup at GSI 2011 20 counters 30 counters NEUTRON ENERGY [MeV] DETECTION EFFICIENCY [%] New BELEN-30 for GSI

Silicon IMplantation detector and Beta Absorber (SIMBA) Constructed and developed at TU München Pictures: K. Steiger • 1 x and 1 y-detector, 60x60x0.3 mm3, 60fold segmented each 2 SSSSD, 60x40x1 mm3, 7fold segmented in x 3 DSSSD (implantation area), 60x40x0.7 mm3, 60fold segmented in x-, 40fold in y-direction PhD thesis C. Hinke, TUM (2010) Diploma thesis K. Steiger, TUM (2009) to be replaced by AIDA in >2012

Future Similar proposals @ other labs? Upgrades of the setup (more 3He counters, +g-det., AIDA...) New proposals Evaluation/ compilation of bdn Workshop? (astrophysicists, reactor physicists, ...) BELEN detector can/will be moved to other labs for experiments Jyväskyla ?GANIL? Possible future proposals: 78Ni (N=50, Z=28) 134In, ... (b2n emitters, check GANIL, ALTO program) 194W, 192Hf (deformed, Pn~10% predicted)

(Main) institutions UPC Barcelona IFIC Valencia CIEMAT Madrid Santiago de Compostela Jyväskyla JINR Dubna GSI-Giessen Surrey ...

Setup: BELEN for DESPEC 44 3He counters arranged in 3 crowns ~65% efficiency 90cm90cm70cm PE block 16cm hole for AIDA implantation detector Triggerless DACQ: independent (t,E) for every counter, no ADC gate, minimum dead time, freedom to construct time correlations

BEta deLayEd Neutron detector (BELEN) BELEN-20 Collaboration Universidad Politecnica de Cataluna, Barcelona IFIC Valencia CIEMAT Madrid BELEN-30 Collaboration: additionally