Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D-17491 Greifswald, Germany Main-Components of the Wendelstein 7-X.

Slides:



Advertisements
Similar presentations
Fusion Experiment WENDELSTEIN 7-X
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
Vacuum Vessel Production Readiness Review
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
IPP Stellarator Reactor perspective T. Andreeva, C.D. Beidler, E. Harmeyer, F. Herrnegger, Yu. Igitkhanov J. Kisslinger, H. Wobig O U T L I N E Helias.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
/18 Cryogenic thermometry for refrigerant distribution system of JT-60SA Kyohei NATSUME, Haruyuki MURAKAMI, Kaname KIZU, Kiyoshi YOSHIDA, Yoshihiko KOIDE.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
WENDELSTEIN 7-X Basismaschine Design Review Plasma Vessel Max-Planck- Institut für Plasmaphysik J. Reich, W7-X BasismaschineDesign Review Plasma Vessel.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
Max-Planck-Institut für Plasmaphysik 21 st IAEA Fusion Energy Conference, Chengdu, 16 – 21 October Experience Gained during Fabrication and Construction.
A Presentation On Summer Training At Bharat Heavy Electricals Limited, Haridwar.
Max-Planck- Institut für Plasmaphysik U. Schultz, Assembly- Technology Working package Port assembly 1 Working package Port assembly Uwe Schultz.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
A Presentation on construction of Turbo Generator.
A View of NCSX Structural System and Load Path for the Base Support Structure.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
SPL RF coupler: integration aspects
MQXC Nb-Ti 120mm 120T/m 2m models
Ti/SS transitions A.Basti INFN-PISA*
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
HFM Test Station Main Cryostat
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
AEGIS Magnet System.
Challenges of vacuum chambers with adjustable gap for SC undulators
Produktentwicklung und Maschinenelemente
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Design of Distribution Feedbox at LHC P7
Preparation of Components for the Mounting of
Challenges for FCC-ee MDI mechanical design
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Undulator System Components Status Dean Walters
Cryostat System: FE Global Model
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D-17491 Greifswald, Germany Main-Components of the Wendelstein 7-X Cryostat - Critical Manufacturing Aspects and Status of Assembly B. Missal, T. Koppe, B. Hein, A. Hansen, H. Jenzsch, R. Krause, H. Zeplien,. Chauvin, S. Mohr INTRODUCTION At the Max-Planck-Institut für Plasmaphysik (IPP) in Greifswald, the worlds largest superconducting helical advanced stellarator Wendelstein 7-X (W7-X) is under construction. Its ultimate goal is to verify that stellarator magnetic confinement concept is a viable option for a demonstration fusion power-plant. Its three dimensional shaped toroidal plasma (major diameter of 11 m) is directly enclosed by the Plasma Vessel (PV) of similar complex shape. Outside the PV are arranged magnetic coils and outside of them the Outer Vessel (OV). All Coils are vertical supported by a Central Support Structure (CSS), Cryolegs (CL) and radial by Inter Coil Supports (ICL) . The magnetic coils are enclosed by the cryostat witch is generated by the Plasma Vessel (PV) and the Outer Vessel (OV). The connection between PV and OV is realised by Ports for supply and diagnostics. To arrive a modular composition all components (with exception of OV) are subdivided into 10 HM (36°) which will be assembled for the present into Moduls (72°) and afterwards into the complete experiment (360°). Fig. 1 shows a schematic cut through the cryostat where are shown the main components Fig. 2 shows the realistic main components of one module . 1000 mm 2. Plasma Vessel Support 5. Cryoleg 6. Outer Vessel 7. Ports 1. Plasma Vessel 3. Coils 4. Central Support Structure Fig. 2: realistic main components of one module Fig. 1: Schematic cut of cryostat 1. Plasma Vessel (PV) Main function: Enclose the Plasma and assure the ultrahigh vacuum (10-8 mbar) inside. Main Composition: - 10 uniform Halfmodules (36°) - Free formed area following contour of Plasma Material: stainless steel 1.4429, s=17 mm Manufacturer: MDT GmbH Deggendorf/Germany Difficulties: free formed areas in closely tolerances Technology: cant plate stripes in different directions, afterwards welded to rings and sectors Manufacture Status: delivered since 2005 Assembly Status: (see Fig. 3 + 9) - 10 Moduls(72°) are welded and completed - Connection of two Moduls will start end of 2011 2. Plasma Vessel Support (PVS) Main function: - Withstand and transfer all vertical forces from the PV to the machine base - Allow horizontal movements Main construction: - 3 supports/Modul - pendulum support system - spherical bearings - vertical adjustable by hydraulic jacks - Bellows for gasketed to vacuum Material: stainless steel 1.4429, CuSn7Pb15 Manufacturer: MDT GmbH Deggendorf/ Germany Difficulties: high accuracy between the interfaces Manufacture status: delivered since 07/2008 (see Fig. 4) Assembly status: In four Moduls the PVS are connected from Outer Vessel to Plasma Vessel Fig. 3: PV HM 41 during preparation for assembly Fig. 4: PVS AEX welded in OV-Shell during Penetration-Test 3. Magnetic Coils Main function: Generate magnetic field for enclosure of plasma by cooling down to 4 K during experiment Main construction: - 50 non Planar Coils (NPC)+20 Planar Coils (PC) - housing by stainless steel cast - inside: helium cooled by supra wire system Manufacturer: Babcock Noell GmbH (Maliano, Spain) Difficulties: Complicated 3D construction with imbedded supra wire system and current connectors (see Fig. 5) Manufacture status: All coils (50+20) are delivered since 07/2008 and checked at CEA Saclay up to 08/2009 Assembly status: All coils are assembled 4. Central Support Structure (CSS) Main function: Support of all magnetic Coils Main construction: (see Fig. 6) Welded Pentagonal Ring 10 Halfmodules, Diameter: 10 m, h=2,5m Material: 1.4429, 1.3960 Manufacturer: ENSA (Maliano, Spain) ROVERA (Borgo San Dalmazzo, I) Difficulties: high accuracy and cleanness requirements Manufacture status: 10 Halfmodules are delivered Assembly status: All Halfmoduls are assembled with coils and conected to Moduls . Fig. 5: Non Planar Coils during preparation for assembly Fig. 6: Compete support modul during transport to the next Mounting Stand 5. Cryolegs Main function: - Support of Central Support Structure (CSS) (Highvacuum, 4K) vertically to machine base (atmosphere) - Allow horizontal temperature shrinkage of CSS. Main construction (see Fig. 7) : - 2 Cryolegs/Modul (10 for whole Cryostat), - sliding bearing at bottom for temperature shrinkage - middle part GFK-bush for temperature difference - stainless steel-flange for connection to Central Ring Material: 1.4429, glass fibre reinforced plastic (GRP), PTFE Manufacturer: ZANNON (Schio, Italy), IMA GmbH (Dresden, D), SKF Aerospace (Rodgau, D) Difficulties: High forces for GRP-bushes => many calculations and tests Manufacture status: All Cryolegs are are delivered Assembly status: All Cryolegs are assembled 6. Outer Vessel (OV) Main function: Form with Plasma Vessel the Cryostat Main construction: (see Fig. 8) - Torus, outer diameter 16 m - cross section 4,4 m, Wall thickness 25 mm - 524 domes for ports and accessibility - 15 supports directly to machine base Material: stainless steel 1.4429 Manufacturer: MDT GmbH Deggendorf Difficulties: - High accuracy of big welding construction - Elasticity of mainbody (without domes) Manufacture status: - All Moduls are delivered, - 1 Modul is in checking procedere Assembly status: - All Moduls are prepaired with thermal insulation - 8 Halfshells are assembled to 4 Moduls Fig. 8: OV-Modul during test-assembly of PVS Fig. 7: Cryoleg during test assembly 7. Ports Main function: Access to plasma vessel for diagnostics or supply Main construction (see Fig. 9): - Tubes of different shapes with bellows - Flanges outside tubes for heating and cooling Material: stainless steel 1.4429 Manufacturer: ROMABAU AG (Weinfelden, SUI) Manufacture status: Compete delivered 06/2007 Assembly status: - 2 Moduls are assembled CONCLUSIONS All main components are delivered. Many are assembled or are in preparation for assembly. A big effort of engineering was required to arrive this current status. It is important to define precisely in a very early period the specification and to have a very tight monitoring of the manufacturing process. The stellarator magnetic confinement concept is a viable option for a Demonstration fusion power-plant. This goal is a strong motivation for all colleagues of IPP. From this point of view there are no doubts to complete the assembly up to 2014. Fig. 9: 4 Moduls in Thorushall 09/2011 Fig. 9: Diagnostic Port AEK-V2 (Typ I)