Market integration in the CEE countries

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
GRI South SG Meeting 15 November /11/2013 | Chart 2 After only 1 year the early CAM implementation by PRISMA started successfully on 1 April 2013…
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
1 Warsaw, 16 October 2012 the system, that connects New Gas Market Model in TNC.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
Madrid, 27 October 2009 South Gas Regional Initiative Open Season France-Spain Validation of the results.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Improvement of transparency of regional Virtual Trading Points in SSE
Market integration in the CEE countries
29th November 2016 Teleconference
Congestion Management
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
The consultant used the MMR ranking of gas hubs to categorise results
RO-HU-AT - a pilot project for incremental capacity
20th April 2016 Teleconference
Self-evaluation template for GTM Alessandro Ischia, E-Control
Gas Regional Initiatives
26th IG meeting 23th January 2014
4th October 2016 Teleconference
Allocation of Capacity in Portugal Under the New Regulation
CMP Transparency Requirements
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
2°Questionnaire for the assessment of the main features of
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
Regulatory perspectives
GRI North-West Meeting
Allocation of Capacity in Portugal Under the New Regulation
20th April 2016 Teleconference
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
RO-HU-AT - a pilot project for incremental capacity
2016 and beyond Ukrtransgaz.
Improvement of transparency of regional Virtual Trading Points in SSE
Self-evaluation template for GTM Alessandro Ischia, E-Control
29th April 2014 Teleconference
Market integration in the CEE countries
RO-HU-AT - a pilot project for incremental capacity
4th October 2016 Teleconference
Improvement of transparency of regional Virtual Trading Points in SSE
Market integration in the CEE countries
Questionnaire for the assessment of the main features of
RO-HU-AT - a pilot project for incremental capacity
Market integration in the CEE countries
GRI North-West Meeting
2°Questionnaire for the assessment of the main features of
29th November 2016 Teleconference
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
RO-HU-AT - a pilot project for incremental capacity
Regulatory perspectives
Improvement of transparency of regional Virtual Trading Points in SSE
PRISMA General Information
South Gas Retional Initiative
Market integration in the CEE countries
Presentation transcript:

Market integration in the CEE countries Czech – Austrian trading region GRI SEE 08 July 2016, Budapest RO-HU-AT - a pilot project for incremental capacity How to develop functioning markets? Infrastructure needs and initiatives for Europe RO-HU-AT - a key project for Central and South-East Europe

Market integration First integration idea in the CEE countries in 2011- CEETR Project CZ - AT market integration

Czech-Austrian market integration Joint working group between the involved NRAs (ERÚ and E-Control) and the TSOs (Net4Gas, GCA and TAG) established in 2014 Various market integration models have been analyzed Market connection via new IP Reintal Trading Zone with separate VTPs Trading Zone with common VTP Trading Region 4

Czech-Austrian market integration Objective: close integration of Czech and Austrian gas markets Market survey in Q2 2015 indicated preference for market integration as compared to a classical market connection (i.e. new IP) 5

Envisaged model Common VTP VBPCZ VBPAT Source: N4G Czech Republic Republic of Austria Common VTP Waidhaus Oberkappel Überackern Arnoldstein Murfeld South Stream IP Mosonmagyarovar Baumgarten Lanžhot Český Těšín Hať IP (STORK II) Brandov (STEGAL) Olbernhau/HSK Brandov (OPAL) Gas Exchange PXE (futures) / OTE (SPOT) CEGH (both) DSOs level TSOs level End-user Zone CZ Balancing N4G GCA Ind. Production VBPCZ OTE End-user Zone AT VBPAT AGCS AT-CZ Trading Region

What to do? TRU Insufficient interconnection capacity does not allow for a market integration ?

What to do? TRU Trading region upgrade (TRU) solution to better connect CZ and AT markets TRU

Trading Region Upgrade (TRU)

Trading region upgrade VTP CZ VTP AT

Trading region upgrade VTP CZ VTP AT

Trading region upgrade VTP CZ VTP AT

Spread AT-CZ and capacity costs on yearly basis Transportation costs Transportation costs Source: Wagner Elbling & Comp.

Spread AT-CZ and capacity costs on day-ahead basis Transportation costs Transportation costs Source: Wagner Elbling & Comp.

Consultation revealed interest Consultation on TRU took place in April 2016 The survey showed general support but triggered several questions Next steps Answering questions raised (July 2016) - FAQ Stakeholder event after the summer

Sample of answers to questions Does TRU fall under the regulations defined in the “CMP Annex”? (can it be surrendered, will mechanisms such as DA UIOLI, LT UIOLI etc. apply?) NO, the current design of TRU Option does not foresee the application of CMP Measures.

Sample of answers to questions What will be the contract duration (daily,..) of TRU at the SCPs? Product runtimes of TRU are missing. It is planned to start the selling of TRU Option with a contractual validity of up to one year (pilot phase). Depending on the market demand shorter durations (e.g. quarters, months and days) are imaginable. Regardless of the validity duration, TRU Option can be attached to daily, monthly, quarterly and yearly Entry capacity rights.

Sample of answers to questions  It is unclear who exactly will offer TRU? GCA and N4G will offer TRU Option to be attached to capacity at the Entry Points of each market area.

Sample of answers to questions Can TRU also be used in combination with TAG capacity (since TAG is not mentioned in the document)? For the time being TAG GmbH does not plan to offer the TRU Option. However, the TRU Option can also be used in connection with TAG GmbH Entry Capacities.

Sample of answers to questions The document lacks a clarification as to which capacity rights enable to purchase and use TRU. Is a primary transportation contract needed, or is it sufficient to have capacity allocated at an entry point? (for instance usage rights purchased on the secondary market) For the right to book TRU Option no capacity rights are necessary. For the usage of TRU Option it is sufficient that entry capacity rights are allocated to a balance group no matter if capacity has been booked on primary or secondary markets.

Sample of answers to questions The document does not at all specify whether TRU is a bi-directional (AT<->CZ) option, or whether two uni-directional options (AT->CZ + CZ->AT) can be purchased. In other words: Is it intended to sell two products, one to access the Austrian VTP via Czech Republic (“TRU AT”) and one to access the Czech VTP (“TRU CZ”) via Austria (consequently two TRU coins are offered), or is it intended to sell only one TRU coin to access the respective other country? It is planned to offer TRU Option for unidirectional use, in Austria by GCA for the use together with Austrian entry capacities and in the Czech Republic by N4G for Czech entry capacities.

Sample of answers to questions How much capacity will be offered as TRU? What will be the price of TRU (for each direction)? TSOs are just discussing about the possible capacity offer, so we cannot give an answer to this question at this point in time. As for any other auction on PRISMA, the amount on offer as well as the applicable reserve price will be published well ahead of the auction, in line with current publication lead times.   E-Control is not able to give a binding information for the tariff that is applicable in Austria as from 1 October 2017 (expected start of TRU). On 1 January 2017 a new regulatory period will start in Austria and tariffs for that period will be published in Q4 2016.

Conclusion Implementation steps to follow TRU consultation revealed interest 2016 Q3 aswers to FAQ 2016 Q4 stakeholders event 2017 TRU will be offered (?) Implementation steps to follow

 alessandro.ischia@e-control.at  www.e-control.at  + 43 1 24 7 24 810  alessandro.ischia@e-control.at  www.e-control.at Contact