Chilled Beam Performance:

Slides:



Advertisements
Similar presentations
HVAC 13a CNST 305 Environmental Systems 1 Dr. Berryman
Advertisements

Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S.
HEALTHCARE BUILDING AUTOMATION
Commercial Mechanical Requirements
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building ®
Foundations of Real Estate Management TM BOMA International ® Module 3: Building Operations I Heating, Ventilating, and Cooling the Building.
Mechanical Engineering Department  Temperature Control  Cooling  Heating  Humidity Control  Humidification  Dehumidification  Air Quality Control.
Chilled Beam Presentation
Lecture 23: Primary System Loops and Components Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract.
Objectives Finish with ducts and fans Define project topics.
Energy in Focus Energy Savings with Water Based Systems By Maija Virta Specialist of Indoor Environment Technology.
Presented by: Terry Stohs Viessmann Manufacturing Company Inc.
Engineer Presentation
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Objectives Finish with Multizone Systems
Refrigeration and Heat Pump Systems Refrigeration systems: To cool a refrigerated space or to maintain the temperature of a space below that of the surroundings.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
Lecture 17: VAV and Terminal Reheat Systems Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
Lecture 15: Air Primary Loops and Controls Material prepared by GARD Analytics, Inc. and University of Illinois at Urbana-Champaign under contract to the.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Lecture 16: Zone Air Paths and Air Distribution Units
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Objectives Analyze processes in AHU and buildings.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Differences in Conduction Calculation in Various Energy Simulation Programs Modeling of HVAC Systems.
HVAC – Air Handling Unit Heating Ventilating AC =Cooling HVAC – Basic Terms hQ = 200,000 Btu/h CO2 20 cfm/ pers 50 people 1000 cfm cQ assume to = 20 tr.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Field Trip Time: Tomorrow (Tuesday) 8 am Duration 1 hour (you will be back latest at 10 am) Location Texas State University: Round Rock
LEVEL 4 BUILDING SERVICES TRAINING Level 3 Re-cap Cooling Systems looked at within Level 3 included; –Through-the-wall packages –Individual reversible.
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
The Data Center Challenge
Lecture Objectives: Discuss Final Project
Objectives Finish analysis of most common HVAC Systems
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Types of HVAC Technology Used in Business Establishments
Lecture Objectives: Answer questions related to HW 4
Lecture Objectives: Discuss HW3 parts d) & e) Learn about HVAC systems
Munters DOAS, Chilled Beams and VRV
Lecture Objectives: Answer questions related to HW 4
Energy Efficiency in District Coiling System
Brian Wallingford, Applications Engineer
Objectives Humidifying - steam - adiabatic Cooling towers
HCB 3-Chap 19A: All-Air Systems_Single Zone
Frenger “Radiant” chilled beam performance at 1 Shelly St - Sydney
Objectives AHU processes - HW2 Cooling cycles.
Objectives Plot processes in AHU and buildings on psychrometric chart
Lecture Objectives: Discuss HW4 parts
Objectives Finish with Heat exchangers
Objectives Psychometrics Examples in AHUs.
Objectives Review exam problems Further discuss final projects
Objective Revie the Cooling Cycle Learn about air distribution systems
Objectives Processes in Cooling towers and AHUs.
Presentation transcript:

Chilled Beam Performance: 1 Shelly Street, Sydney

1 Shelley Street, Sydney 3D Model Creation

1 Shelley Street, Sydney 3D Model Creation

1 Shelley Street, Sydney Daylight Analysis

1 Shelley Street, Sydney HVAC Systems: Performance Comparison VAV fancoil Active chilled beam Passive chilled beam (95% convective / 5% radiant absorption) Passive “Radiant” chilled beam (65% convective / 35% radiant absorption) Traditional VAV Modern VAV (temperature and CO2 control with “static reset”)

Systems Setup Cooling circuit (common to all air side systems) Chiller has a COP of 4 (typical chiller performance based on flow of 6°C and return temp of 12°C). Addition of Dry Air Cooler for free cooling when available. DAC efficiency = 67%, SFP of fans = 0.4W/l/s 1 Shelly St - Sydney

Systems Setup Heating circuit (common to all air side systems) Boiler has an efficiency of 90% and a flow set point of 65°C. DHWS also fed from this circuit. 1 Shelly St - Sydney

Systems Setup DX circuit - common to all air side systems Nominal heating energy input ratio 0.261 (COP = 3.83) Nominal cooling energy input ratio 0.307 (COP = 3.26) (Performance taken from typical Mitsubishi VRF heat recovery unit) 1 Shelly St - Sydney

Systems Setup VAV fancoil A high efficiency chiller supplies chilled water at 6°C to the fan coils with a nominal return temperature of 12°C. An air source heat pump supplies heating and cooling to the DX coils in the AHU AHU based on total SFP of 1.8 W/l/s, includes heat recovery at 75% efficiency, provides air to the fan coil units at 14°C. The fresh air flow rate is 2.2 l/s/m2 for perimeter zones and 1.1 l/s/m2 for core zones. The fan coil units include EC motors and VAV control and have an SFP of 0.25 W/l/s. The fan coil units have a minimum flow turndown to 60% of the maximum flow rate.

Systems Setup Active Chilled Beam Dedicated high efficiency chiller supplies 14°C water to chilled beams Incorporates “Free Cooling” circuit When outdoor conditions permit, chiller can turn off. During other times, free cooling runs in conjunction with chiller to further reduce energy usage. Variable pump speed to ensure chilled water return is 3K higher than the supply. (continued next slide)

Systems Setup Active Chilled Beam (continued from previous slide) DX cooling coil provides conditioned air at 16°C Dehumidifies supply air to control latent gains within the space Maintains dew point at 1.0°C lower than chilled water flow temperature onto beams. DX heating coil provides the conditioned air at 13°C, supplies reheat during dehumidification. AHU based on a total SFP of 1.8 W/l/s, includes heat recovery at 75% efficiency. Fresh air flow rate = 2.2 l/s/m2 for perimeter zones & 1.1 l/s/m2 for core zones.

Systems Setup Passive Chilled Beam (common to both radiant & convective) Two passive chilled beam systems modelled: 5% radiant proportion, 35% radiant proportion. To compensate for lower resultant temperatures, room thermostat cooling setpoint increased by 1°C for the 35% system. Dedicated high efficiency chiller supplies 15°C water to chilled beams Incorporates “Free Cooling” circuit When outdoor conditions permit, chiller can turn off. During other times, free cooling runs in conjunction with chiller to further reduce energy usage. Variable pump speed to ensure chilled water return is 3K higher than the supply. (continued next slide)

Systems Setup Passive Chilled Beam (common to both radiant & convective) (continued from previous slide) DX cooling coil provides conditioned air at 16°C Dehumidifies supply air to control latent gains within the space Maintains dew point at 1.0°C lower than chilled water flow temperature onto beams. DX heating coil provides the conditioned air at 16°C, supplies reheat during dehumidification. AHU based on a total SFP of 1.8 W/l/s, includes heat recovery at 75% efficiency. Fresh air flow rate = 2.2 l/s/m2 for perimeter zones & 1.1 l/s/m2 for core zones.

Systems Setup Traditional VAV High efficiency chiller supplies chilled water at 6°C to cooling coil with nominal return temperature of 12°C. VAV system based on a total SFP of 1.8 W/l/s, heat recovery at 75% efficiency, provides air to zones to meet heating & cooling demands. Fresh air flow rates: 2.2 l/s/m2 for perimeter zones, 1.1 l/s/m2 for core zones. Zone dampers configured to control air flow based on zone temperature requirements. Supply fan controlled to maintain a constant static pressure.

Systems Setup Modern VAV High efficiency chiller supplies chilled water at 6°C to cooling coils with nominal return temperature of 12°C. VAV system based on a total SFP of 1.8 W/l/s, heat recovery at 75% efficiency, provides air to zones based on heating & cooling demand. Fresh air flow rates: 2.2 l/s/m2 for perimeter zones, 1.1 l/s/m2 for core zones. Zone dampers configured to control air flow based on zone temperature requirements and CO2 levels. Supply & return fans controlled to give “static pressure reset” as described in ASHRAE 90.1.

Systems Setup Frenger Radiant Chilled Beam (A) Passive chilled (65% convective / 35% radiant absorption) beam air side Evaporative cooling of exhaust air before heat recovery.

Systems Setup Frenger Radiant Chilled Beam (B) Passive chilled (65% convective / 35% radiant absorption) beam air side Evaporative cooling and sensible heat recovery on fresh air.

Summary Results Analysis   Heating (kWh) Cooling (kWh) Auxiliary (kWh) Total (kWh) VAV fancoil 84,504.39 541,862.09 252,238.47 878,604.95 Active beam 84,468.56 529,660.69 203,059.41 817,188.66 Passive Beam (95% Convective / 5% Radiant absorption) 87,021.97 509,811.69 206,553.40 803,387.06 Frenger “Radiant” Passive Beam (65% Convective / 35% Radiant absorption) 86,836.56 454,034.25 203,257.08 744,127.89 Traditional VAV 365,106.69 663,804.59 389,736.06 1,418,647.34 Modern VAV 86,167.17 609,406.33 276,391.29 971,964.79 From the above results the Frenger Radiant passive beam system consumes the least energy. Frenger “Radiant” Passive Beam (65% Convective / 35% Radiant absorption) 86,836.56 454,034.25 203,257.08 744,127.89 By applying evaporative cooling on the exhaust air further energy savings can be achieved, however when applied to the fresh air system additional energy would be consumed. Radiant Chilled Beam (A): Evaporative cooling on exhaust air 88,454.71 411,994.34 209,178.74 709,178.93 Radiant Chilled Beam (B): Evaporative cooling on fresh air 88,319.67 383,777.83 282,394.64 754,491.95