Govt Policies for Solar Sector Dr

Slides:



Advertisements
Similar presentations
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
Advertisements

KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Solar PV system - financial assistance and incentives
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
EVOLVE INDIA SOLAR SOLAR FINANCE SOLAR B. O. O
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Indian Renewable Energy Development Agency Ltd. April 26, MNRE’s Solar Off-Grid Scheme May 6, Solar Off-Grid Scheme Scheme of MNRE for Promotion.
Harnessing Renewable Energy & Solar Mission of Indian Railways.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
Karnataka Renewable Energy Development Limited
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
SOLAR POWER DEVELOPMENT – VGF OPTION UNDER JNNSM 1 Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
14 th Sustainable Energy Summit New Delhi : 25 th Nov., 2014 Sanjeev Gupta, Managing Director Financing Indian Solar Aspirations NEXGEN Financial Solutions.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
The PV Policy Group Project SECOND THEMATIC WORKING GROUP MEETING Friday 05 May in Athenes, Greece Presentation Monitoring European Position Paper.
Outline  Chronology  Conceptual framework  Salient Features of REC Mechanism  Role of Central Agency  REC Procedures  Current Status.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
Presentation on solar rooftop Abhilakh Singh General Manager 9 th October, 2015.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
SAI & PAC Relationship Perspective from the Maldives “The work of an SAI, and its relations with parliament are key factors in a strong chain of accountability.
OREDA OREDA started in 1984 by Government of Odisha to promote renewable energy resources and its applications in the state. OREDA is the state nodal agency.
Ministry of New and Renewable Energy Government of India 1 11th January, 2016.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
B.V. Rao GM,IREDA 21 st September 2010, Hotel Lalit, New Delhi Conference on Solar Energy Institutional Finance for Solar Projects.
Renewable Energy Certificates in Himachal Pradesh Role of HP regulator and Government By : Navneet Khokhar
Indo-European Workshop on Solar Energy 21 April, 2011 IIT Jodhpur Policy, Regulatory & Financing Issues.
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
Presented by Dr. Rahul Walawalkar President & MD, Customized Energy Solutions India Pvt. Ltd Executive Director, IESAVice Chair, GESA Overview of India.
SOLAR EPC CONTRACTOR COMPANY PROFILE SURYA INTERNATIONAL.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
EFFECTIVE & SUSTAINABLE PROCUREMENT SYSTEM IN LAGOS STATE Partnering for Development Onafowote, Fatai Idowu Acting General Manager (PPA) Presentation made.
Renewables IPP frameworks for successful PPAs Dr Muriel Watt Head, Energy Policy & PV.
Incentives For Use Of Renewables
SOLAR EPC CONTRACTOR COMPANY PROFILE
A Roadmap for Photovoltaic Auctions in Israel Targets and vision Honi Kabalo - Head of Renewable Energy, Electricity Regulatory Authority.
Operationalizing One Nation One Grid
Template for country interventions (5 min)
World Bank Business on Renewable Energy
Renewable Energy Development in India
Financing of Solar power plants
Solar Rooftop Demonstration Projects in Member Countries of ISA
Challenges in Financing Renewable Energy
Rooftop Solar Net Metering: Regulatory Impact Dr
Indian Grid Code and Commissioning Test Procedure Dr
Power Scenario, Renewable Energy and General Manager (SOLAR)
Renewable Energy In Egypt
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Financials of Solar Water Pumping and Off-grid Power Plant Dr
Solar PV Power Plant Design Considerations
More Industrializaiton
WATER REGULATORY AUTHORITY
Harnessing Renewable Energy Solar Mission of Indian Railways
Importance of Law and Policies in the Environmental Management System
Financial Management of the SNAs A Futuristic View By Dr Sudhir Kumar Chief Executive, Green Energy Solutions, Pune.
bihar electricity regulatory commission
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Creating a market for sustainable energy growth Inġ
ACCESS TO SUSTAINABLE ENERGY PROJECT
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
International Energy Council
Presentation transcript:

Govt Policies for Solar Sector Dr Govt Policies for Solar Sector Dr. Sudhir Kumar Chief Executive Green Energy Solutions, Pune Mob: +91 96650 20206 drsk22@gmail.com

Legal framework of policies Dr. Sudhir Kumar

Outline of Presentation Legal framework of policies Grid power solar policies Off-grid solar policies Dr. Sudhir Kumar 3

Legal Framework of Policies Bill Gazette notification/Decree Act/Law/Statute Rule Regulation Policy Government order Bye laws Office order Guidelines Dr. Sudhir Kumar

Bill A bill is a proposed law under consideration by a legislature A draft of a proposed law presented to parliament for discussion A bill does not become law until it is passed by the legislature Dr. Sudhir Kumar

Gazette notification/Decree Entry in official register Registration number Assent of the President: 9 May 2014 Effective Date: 12 May 2014 Dr. Sudhir Kumar

Act/Law/Statute A bill which has passed through the various legislative steps required for it and which has become law Issued by Law Ministry Does not need national emblem Dr. Sudhir Kumar

Rule Power conferred by EA,2003 Issued by Power Ministry As notification Procedure, formats, implementing authority, compliance and penalties Dr. Sudhir Kumar

Regulation Quasi judicial entity Created by Act Independent – Not under government Regulation mandatory for government policy Unbiased – Level playing field Joint decision: chairman and members Provides consensus enabling instrument Public hearing Dr. Sudhir Kumar

Policy Govt. level decision Issued by Energy Dept. No legislation necessary Has sunset date Administrative decision of ruling party May be changed by next government A follow through of Act Dr. Sudhir Kumar

Government order Departmental notification Order no. , dated Based on minutes of meeting Authorizing the decision Subject to review midway Bureaucratic procedure Dr. Sudhir Kumar

Bye laws, Office order, Guidelines Localized and customized rules Local decision Office order Subject to changes with mutual consent For smooth functioning Internal office management Guidelines Only guiding principle May not be mandatory Dr. Sudhir Kumar

Mission Statement: NAPCC National Action Plan on Climate Change Prime Minister’s Council on Climate Change Announced on June 30, 2008 Dr. Sudhir Kumar

Grid power solar policies Dr. Sudhir Kumar

JNNSM Future vision: Phase I: Learning, Market growth Phase II: Commercialization, Grid parity Phase III: Self sustainable, Tech. Innovation Dr. Sudhir Kumar

Various Business Models Generation based incentive Bundling mechanism: NVVN RPO market: Regulatory Requirement REC market: APPC + REC State initiative: FiT + Bidding Private market: Third party sale + Captive Viability gap mechanism: 30% of project cost Dr. Sudhir Kumar

Viability Gap Mechanism Viability gap fund based on bid VGF 30% of the project cost or Rs.2.5 Cr./MW, whichever is lower Tariff: Without AD Rs.5.45 per kWh fixed for 25 years With AD Rs.4.75 per kWh fixed for 25 years Equity min Rs.1.5 Cr./MW must Release of funds: - 50% on achieving Commercial Operation Date (COD) - Balance 50% progressively 10% over next 5 years Bidding Result: 47 projects selected DCR (Domestic Content Requirement) Category: 22 (Rs.1.35 - 2.456 Cr per MW) Open Category: 25 (Rs.0.175 - 0.135 Cr per MW) Dr. Sudhir Kumar

Canal Bank and Canal Top SPV Power Scheme: Pilot-cum-Demonstration Project for Development of Grid Connected SPV Power Plants on Canal Bank and Canal Top CFA: Total budget: Rs. 225 Crs for 2015-2017 Support: Rs. 3 Crs/MW canal top, Max. 50 MW and Rs. 1.5 Crs/MW canal bank, Max. 50 MW Eligibility: Only those states/UTs who have fulfilled RPO or commit to Implementation Agency: Govt. utilities, Departments and PSUs Scheme Manager: SECI to invite proposal, scrutinize, forward for sanction Dr. Sudhir Kumar

Solar Parks and Ultra Mega Solar Power Projects Scheme: Development of Solar Parks and Ultra Mega Solar Power Projects, 2014-2019 (25 nos. 500 MW each) Implementation: Govt. Agencies with/without private equity Scheme Manager: SECI on behalf of MNRE CFA: One time Rs. 25 lakhs for DPR In stages Rs.20 lakhs/MW or 30% of the project cost including Grid-connectivity cost, whichever is lower Objective: One-stop-shop Single window format Shorter period of time Facilities: Land, road, construction power, evacuation, drainage etc. Dr. Sudhir Kumar

Solar Power Achievement October 2014: 2738MW JNNSM lags behind in achieving target (674MW) Individual state initiative commendable REC mode got flip, later slowed down Private market untapped Dr. Sudhir Kumar

RPO Regulations Dr. Sudhir Kumar

State Solar Power Policies SN Particulars Description 1 Capacity 1-10 MW 2 Wheeling Allowed with charges as per SERC 3 Electricity Duty Mostly exempted 4 PPA duration 20 to 25 years 5 Transmission infrastructure By utility with or without charge 6 Forecasting & Scheduling Not applicable 7 Land Govt. and Private 8 Connectivity 11 to 400 kV substation 9 Open Access Allowed with OA/grid loss charges Dr. Sudhir Kumar

Off-grid Solar Policies Dr. Sudhir Kumar

Implementation Arrangements State Renewable Energy Development Agencies (State Nodal Agencies) Financial Institutions/Financial Integrators (e.g. NABARD and Regional Rural Banks, Commercial Banks, IREDA and NHB) Channel Partners including RESCO Solar Energy Corporation of India Other Large Govt. Departments/PSUs Dr. Sudhir Kumar

SNAs and FIs State Nodal Agencies: Each state has SNA e.g. MEDA, TEDA, HIMURJA Only by inviting tenders Aggregating the projects Only for systems: larger than 5kWp or equivalent Financial Institutions/Financial Integrators NABARD/ RRBs/ Commercial Banks/ IREDA/NHB Loan from the bank mandatory to avail subsidy Only individual beneficiaries eligible Dr. Sudhir Kumar

Channel Partners/RESCOs Manufacturers of cell/Modules, inverters, batteries, luminaries or system integrators Accredited with certifying agencies e.g. CRISIL Responsible for design, supply, integration and installation, O&M and other services Can directly approach the Ministry for accessing subsidy RESCOs: Those who install, own & operate RE systems and provide energy services to consumers Will sell power to the consumer at mutually agreed rate or at rates arrived through bidding process Street / Home Lighting Systems, mini/micro grids Dr. Sudhir Kumar

SECI and Govt. Depts/PSUs Solar Energy Corporation of India SECI: A central govt. company, owned by MNRE Through tender mode only Submit project proposals directly for approval Implement large govt. schemes Socially and commercially oriented projects All categories of subsidy Other Large Govt. Departments/ PSUs Central/State Ministries/Depts./ Organizations/PSUs, Autonomous Institutions Project mode i.e. must be a project report Project proposals directly to the MNRE Through tender only Dr. Sudhir Kumar

Special Category States North Eastern States, Sikkim, Jammu & Kashmir, Himachal Pradesh and Uttarakhand, Lakshadweep, A&N Islands Subsidy 90% Through SNA or SECI Procurement through open competitive bidding For common public: For Central and State Government Ministries and their organizations Dr. Sudhir Kumar

CFA Dr. Sudhir Kumar

CFA Dr. Sudhir Kumar

Technical Specifications: Modules Mono/ multi crystalline silicon solar cells SPV array: Series and parallel combination of modules Each module: Various peak wattage at STC Output: IEC 61215 certified Safety qualification: IEC 61730 Part I and II certified Minimum efficiency: 14% Minimum fill factor: 70% Dr. Sudhir Kumar

Balance of Systems (BoS) Dr. Sudhir Kumar

Balance of Systems (BoS) Dr. Sudhir Kumar

Balance of Systems (BoS) Dr. Sudhir Kumar

Warranty Module Output Wattage Warranty: BoS Warranty: Minimum 90% at the end of 12 years Minimum 80% at the end of 25 years BoS Warranty: Minimum period of 5 years Warranted against any defects: Manufacturing Design Installation Dr. Sudhir Kumar

THANK YOU Dr. Sudhir Kumar, Chief Executive, Green Energy Solutions, 8/15, Mazda Deluxe Homes, Porwal Park, Tank Road, Off: Alandi Road, Yerwada, Pune - 411006, India. Cell No. +91-9665020206, E-mail: drsk22@gmail.com Dr. Sudhir Kumar