Longitudinal Joint Construction – Why Straightness Matters

Slides:



Advertisements
Similar presentations
Volvo Construction Equipment Road Institute Paving Principles.
Advertisements

Asphalt Pavement Laydown and Compaction
Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving.
GeoPak Ver Update New Criteria Enhancements since last year. Using Backslope Override and the Backslope Constraint Line(BCL)
Section Cross Slope District 1 Your logo here.
Statewide Traffic Engineers Meeting Rumble Strip(e) June 16, 2011 Simone Ardoin Assistant Road Design Engineer Administrator.
2014 VDOT Asphalt Seminars Feb. 20 – Fredericksburg | Feb. 25 – Richmond | Mar. 11 – Blacksburg Pavement Marking Issues & Answers Vanloan Nguyen, P.E.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
AF2903 Road Construction and Maintenance Compaction of Hot Mix Asphalt
Tolerances and Price Impacts Presented by:- Er. Bhagawan Shrestha.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Bituminous Street Recertification Initiatives. Initiative Items n Stone Matrix Asphalt (SMA) n Longitudinal Joint Spec and other methods for longitudinal.
1 PAVEMENT DATA ITEMS. 2 Climate_Shapes (4 LTPP zones) Soil_Shapes Metadata Estimates Section level data HPMS Pavement Data Summary level data.
Ornulv (Arnie) Sonsteby, PE Penn State / FAA Airport Conference 2007
Things to look for and remember while preparing FD05 Estimates.
HMA Construction Program Module 7 – Joint Construction.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
General Issues an Asphalt Technology Longitudinal Joints.
PAVEMENT CONDITION SURVEYS Lecture 4. Instructional Objectives n Need for condition surveys n Collection methodologies n Four basic types of condition.
Got Density? Asphalt Pavement Assn. of Indiana Winter Conference December 2010.
Asphalt Quality Assurance Program
The Use of Hot Mix Asphalt for Colorado Trails and Paths Tom Clayton, SET Director of Training And Member Services.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Introduction to Asphalt Pavement Construction and Compaction For ODOT District 3 presented by.
Principles of Paving rev Principles of Paving.
Pavement Maintenance II
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
PAVEMENT MAINTENANCE 1:
Things to look for and remember while preparing FD05 Estimates.
Materials Specifications & Special Provision Changes 2015 Regional Asphalt Seminars Rob Crandol, P.E. Assistant State Materials Engineer.
 Why do we need it?  How can we measure it?  When do we achieve it?
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
LTPP Lessons Learned: Delaware SPS-2 Wednesday April 9, 2014 SPS-2 Tech Day, Dover, DE Gabe Cimini Project Manager, LTPP North Atlantic Regional Support.
Longitudinal Joint Adhesive Pavement Maintenance Bureau of Technical Services Paulette Hanna, P.E, M.Eng.
Addressing Localized Roughness at the Project Level by Gary Higgins.
Successes in Reducing Highway Fatalities Kathy Harvey, MoDOT State Design Engineer July 16, 2008 Albuquerque, N.M.
PUSHING THE OPERATIONAL LIMITS OF SURFACE SEALS AND ITS EFFECT ON CURRENT MATERIALS SPECIFICATIONS Douglas Judd.
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Jeopardy Roads, Routes, and HighwaysYou Call It! Cause and EffectMiscellanousPotpourri Distress ID 101 $100 $200 $300 $400 $500.
PCS900 AccuGrade 3D Paving Training 3D Design Models & SVO/AGO & TBC
Designed with the Paving Professional in Mind
Extending Performance with Proper Asphalt Compaction
Passing. It is not always safe to Pass 2 You are going shopping at the mall with some friends. One of the friends with you is on crutches. When you arrive.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Delivery Module 5. Delivery  End dump operations  Belly dump operations  Determining number of required trucks.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
WAPA / WSDOT Joint Training
Architectural Drafting
CONSTRUCTING STRAIGHT LONGITUDINAL JOINTS
Unit 3 – Driver Physical Fitness
CONCRETE PAVEMENTS.
Dedicated to Quality Partners In Quality
Pavement condition index calculation
Alabama Asphalt Pavement Association
Auxiliary Views Chapter 7.
Introduction to Pavement Design
Dimensioning & Projections
New Specifications for 2017
Considerations FOR more durable hma pavements
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Materials and Tests Engineer
Louisiana Accelerated Pavement Research Facility
Dimensioning.
AUXILIARY VIEWS C H A P T E R E I G H T.
How Compaction Affects Smoothness
ACEC Designer Training
Presentation transcript:

Longitudinal Joint Construction – Why Straightness Matters Ray Johnston, PE VDOT Central Office Construction

Straight Longitudinal Joint How easy will it be for the paver operator to pave up against this lane and form a good tight longitudinal joint?

Not a Straight Longitudinal Joint? How easy will it be for the paver operator to pave up against this lane and form a good tight longitudinal joint? How Does VDOT specify a straight Longitudinal Joint?

Why do we need a good Longitudinal Straight Joint? “A chain is only as strong as its weakest link and for asphalt pavement that link is often the longitudinal joint” – Asphalt Institute  Improperly constructed longitudinal joints can cause premature deterioration of multilane AC pavements in the form of cracking and raveling. Because joint overlaps are so small, it is critical that the paver be operated in as straight a path as possible for both the cold lane and the hot lane. A straight longitudinal joint sets-up a consistent offset line of striping and snow-plowable marker alignment. The solution to a good longitudinal joint construction involves several aspects of the paving operation.

Overlap Existing Lane Overlap Sufficient Depth on 2nd lane Additional slide that may help showing overlap from the front side. Sufficient Depth on 2nd lane

Schematic of pavement layers demonstrating proper overlap technique.

Mat Compaction - Subsequent Pass The mat should be rolled from the unconfined/outside edge to the longitudinal joint (number of passes to cover the mat depends on the roller widths).

Confined Edge Compaction Adjacent Lane Open to Traffic

Joint Straightness Section 315.05(c) – Placing and Finishing   This applies only to Interstate and Primary Roads. The joint shall offset that in the layer immediately below by at least 6 inches. The joint in the wearing surface shall be offset 6 inches to 12 inches from the centerline of the pavement if the roadway comprises two traffic lanes. The joint shall be offset approximately 6 inches from the lane lines if the roadway is more than two lanes in width. If the offset for the longitudinal joint varies from a straight line more than 3 inches in 50 feet on tangent alignment, or from a true arc more than 3 inches in 50 feet on curved alignment, the Engineer may reject the paving. 1-18-17 (SPCN)

Straight Longitudinal Joint How easy will it be for the paver operator to pave up against this lane and form a good tight longitudinal joint?

Joint Straightness If the offset for the longitudinal joint varies from a straight line more than 3 inches in 50 feet on tangent alignment, or from a true arc more than 3 inches in 50 feet on curved alignment, the Engineer may reject the paving. All longitudinal joints will be subject to this requirement, however, our hope is that few will be measured. As the job progresses, the inspection team will visually inspect joint straightness. If the joint appears to be out of tolerance, the inspection team will communicate this to the contractor. If the contractor believes that the joint appears to be in tolerance, then the joint will be measured by the inspector and the contractor jointly. Only the portion out of tolerance will require corrective action. That said, if most of the joint is out of tolerance and an only a small percentage of joint is within tolerance, the entire joint will likely be rejected.

Not a Straight Longitudinal Joint? How easy will it be for the paver operator to pave up against this lane and form a good tight longitudinal joint? The new specification will clarify what is acceptable and what is not.

Related Links: http://www.pavementinteractive.org/article/longitudinal-joint-construction/ http://www.pavetechinc.com/jointbond-asphalt-maintenance.asp