Regular cryomodule maintenance plans (radiation damage, seals, etc)

Slides:



Advertisements
Similar presentations
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Advertisements

1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Al-Li 2000 series alloy out gassing Studies at IIT N. Solomey, Physics Division Philippe Nash, Material Science Division 21 Feb
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
US Cavities Status and Plan Mark Champion 01 October 2009.
Proton Source Vacuum Plan By David B. Augustine Ben Ogert Jr. August 30, 2011.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
CESR-B Cavities at the CLS Operating Experience J. Stampe, M. deJong, C. Regier, X. Shen.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
MICE Target - Risk Lara Howlett University of Sheffield.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
11/4/2005OLAV 1 Workshop CERNW. Maan Fast Vacuum Valves at CERN -Introduction to fast valves -History of fast valves in use/used at CERN -LEP fast shutters.
Road map of the workshop Machine availability: – “work-horse” in the injection chain – 100% availability not viable,.What is achievable? And at which cost?
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Evolution of Field Emission Characteristics Selected C100 Cryomodules Michael Drury.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Field Emitter Workshop Summary Rong-Li Geng 2016 CEBAF StayTreat June 28-30, 2016.
Science and Technology Briefing Sept
Recent Result for the STF-2 Cryomodule Operation
SRF Operating Experience at JLab
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
Holders and Pumps Summary
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
1.3-GHz Cavity Vacuum Furnace at IB4
CEBAF Accelerator Status
NL C100 Vacuum Spikes and Valve Trips
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
C50 Cavity pair Assembly Changes
SNS Operational History
Operational Experience - Field Emission
SNS Fundamental Power Coupler History
Mathew C. Wright October 2016
Gradient Team Plans Bob Legg 29 June 2016.
C75 Risk Assessment Geoff Krafft
Operations Department
Mathew C. Wright January 26, 2009
Greg Marble, Rongli Geng
TTC Hot Topic Common Questions
Operations Department
Thoughts on Energy Reach
Cryomodule design modifications for C75
C75 Commissioning Michael Drury SRF Operations Support
Strategy for operation and recovery of performance at SNS -Background -History of performance -What is our operational strategy -Performance recovery.
Performance Recovery at CEBAF
Al-Li 2000 series alloy out gassing Studies at IIT
PIT Task Lists Long Range PIT Team F. Lin.
Cryomodule Assembly Plan
Outline: Recent CEBAF performance JLAB-TN-022 Energy Reach Plan
Ken Baggett JLab Staytreat, 2017
Cryomodule Test Schedule
Field Emission and Mitigation in the CEBAF Linacs R Legg, R Geng Jlab SRF Ops Dept. TTC,
JLab Users Organization Annual Meeting June 24, 2019
C100 Operation Enhancing gradient reach for the
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Regular cryomodule maintenance plans (radiation damage, seals, etc) Michael Drury SRF Operations Support Jefferson Lab

Maintenance Plans - Reliability Complete C20 Warm Window Replacement Program Original cryomodules outfitted with polyethylene windows. Failure rate appeared to be increasing over the last year. Single window failure can take entire cryomodule out of service. Replace aging polyethylene windows with ceramics Five zones in SL completed Ten zones left with the bulk in the SL

Maintenance Plans - Reliability New hardware and procedures put in place to mitigate particulate / contaminant migration into cavities Upgraded portable clean room Slow bleed up pumping rig Helium Glove bag for window change out

Maintenance Plans - Reliability O-ring vacuum seal replacement program Insulating Vacuum seal Located in end cans at either end of cryomodule Failure of seal in 2L17 may be due to radiation damage Insulating Vacuum spoiled Higher heat load Tuners frozen Cryomodule mostly offline

Maintenance Plans - Reliability Root cause of failure at 2L17 not yet known May be radiation related ? May be age? Assume for now that 2L17 first of many Start replacing O-rings as we replace warm windows O-ring replacement involves beamline Potential for multiple module warm ups Take advantage of the current large population of warm modules?

Maintenance Plans - Reliability Beamline valve replacement Viton seals degrade in radiation environment Valves do not seal Not a crippling failure but complicates other tasks Forces multiple cryomodule warmups in order to access beamline

Maintenance Plans - Reliability Proposal: Find a manual all-metal valve that can be installed between girders and the B-pump drops. Reduce need for warming up cryomodules Could be installed between every cryomodule or between groups of cryomodules

Maintenance Plans - Reliability Real Time Repairs Insulating vacuum leaks Broken tuners Ion pump replacements Turbo Pump repair replacement

Maintenance Plans - Reliability Ongoing turbo pump repair and replacement Consider purchasing more of the Agilent Twistorr 304 style pumps Lower maintenance costs over time Lower capacity model may be acceptable (for cost saving) Need for LCW is a concern (air cooled model)

Other Support Energy Reach Complete the microphonics hardening installations Lead collar installations in C100 zones Support C50 / C75 Installations Includes installations and extractions Girder cleaning Commissioning Support investigations of in-situ degaussing Targeted Helium Processing Process Cryomodules that have lost ground Increased arc rates are one possible metric Further C100 Helium Processing Support SRFR&D efforts to understand cryomodule performance issues C50 Waveguide trips Field emission improvement efforts

Summary Current plans include Completion of warm window replacements Begin replacing O-ring seals in parallel with other maintenance and repair activities Support all Real Time Repair needs Support other Energy Reach enhancing activities While engaging in these activities: Utilize improved hardware and procedures to mitigate particulate contamination and migration Procure more Twistorr turbos Investigate an all metal valve installation