LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer

Slides:



Advertisements
Similar presentations
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Advertisements

LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Coordination: G. Arduini, E.B. Holzer, J. Jowett
Saturday 30th June - Sunday: Rocky !
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Coordination by E. B. Holzer & J. Wenninger Production
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
LHC progress report Week
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Summary week 18 Intensity ramp up & production
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer Pb-p run till Sunday 6 am Followed by p-p set-up

Ending the pPb Run with Records Sun 10/2 6:04 OP dump of the last Pb-p fill – lumi requests from experiments surpassed ATLAS records     ALICE: 31.14 nb-1      ATLAS: 30.25 nb-1      CMS: 30.79 nb-1      LHCb: 2.08 nb-1

Saturday - Day of Records Very good beam from injectors – B1H emittance ~20% smaller Very short turnaround B1H B1V

Luminosity production p-Pb and Pb-p Collisions for ALICE only From p-Pb to Pb-p ALICE polarity change

Stable Beams Statistics – week 6 Fill Day Peak L [1028 cm-2s-1] Stable beam [h] Int L [nb-1] Dump # bunches [Pb/p] 3523 Mon 4/2 7.2 4:22 0.74 BPMS IP6 192 / 216 3524 7.4 3:14 0.43 3525 10 2:09 0.64 Trip of RQTL9.R3B2 338 / 338 3527 Tue 5/2 1.04 3529 2:08 S12 trip, likely SEU 3533 Wed 6/2 10.7 3:57 1.09 3534 11.5 5:03 1.28 3535 Thu 7/2 10.2 5:07 1.33 SIS orbit correctors (EoF test) 338/338 3537 5:16 0.8 (VdM) 314/272 3538 Fri 8/2 9.6 10:00 1.98 (ALICE only) 3540 8.5 1:57 0.5 (VdM) QPS RQX.L8 3541 Sat 9/2 11.6 3542 11.7 1.17 OP dump 3543 12.4 6:34 1.67 3544 Sun 10/2 2:35 0.86 Total in 6 days 64 h 15.5 nb-1 42% in stable beams

Fills that did not make it into stable beams Day Dump 3526 Tue 5/2 Switching on OFB after cogging Losses IP7: Noisy BPM IP8 leads to orbit drift 3528 Problem diagnosed and BPM disabled 3531 Losses at start of ramp, IP3 collimation Reduce longitudinal blow-up at injection 3532 Same problem with BPM as above – BPM found re-enabled 3536 Thu 7/2 during cogging: SIS position interlock too large momentum offset excursion for B2 (p)  > 10 BPMs out of tolerance

Downtimes Wed 6/2 ~6 hours downtime: lost the cryo compressor of sector 23 Wrong impurity reading which was not caught in time  an alarm is scheduled for implementation in LS1 Very speedy recovery – no loss of CM Access: FBCT, LHCb, UPS, collimators, TIM, LBDS B2 (checking on retriggering signals) Fri 8/2 ~7 hours downtime: RQX.L8 trip RQX.L8 QPS trigger (heaters fired) due to faulty instrumentation related to voltage tap V1 B of current lead 2. Error not related to protection crate working and reacting correctly. DFBX instrumentation to be checked  Access A pin on the current lead cable was found faulty (weak connection) In the shadow replacement of CPU (second time) on RF crate used for synchronization

Varia Tue 5/2 LHCb polarity switched to positive Thu 6/2: End of fill test: bump scan at the BSRT position for BSRT calibration. Scan from +1.5 to -1.5 mm. The last trim was just at the edge for the SIS interlock on the COD settings. Beam dump (it was nevertheless very close to its natural length.) Thu 6/2: Scraping test at injection to determine the systematic errors on energy calibration due to orbit reading dependence on intensity/bunch length. Thu 6/2: VdM scan in ALICE and CMS Fri 7/2: 10 hour fill for ALICE only head-on To bring ALICE integrated luminosity up to the same as ATLAS and CMS The other experiments at 1% of their peak luminosity Fri 7/2: VdM scan ATLAS (beams dumped during LHCb scan) Sat 9/2: VdM scan LHCb Sat 9/2: Test for 50Hz noise / instability studies by separating the beams and reducing / switching off the ADT gain

Luminosities over the week

Issues and Measures taken Losses during squeeze: Mon 4/2: Increase bandwidth of orbit feedback – corresponding to a factor 2 reduction in orbit perturbation Tue 5/2: Increase BLM monitor factor Investigated Tue, looked very promising, but not implemented: B1 horizontal orbit bump in IP7, around RQ11.R7B1 Losses at the start of the ramp B1, IP3 ion collimation leakage: Tue 5/2: Reduction of longitudinal blow-up at injection Wed 6/2: BLM monitor factor increase Re-matched the LHC energy at injection to the SPS Frequent latches of the injection quality check due to position at BPMI.87204 – line steering not sucessful Tue 5/2: IQC BPM tolerances updated. Injection oscillations and losses OK  no more systematic latches

Issues and Measures taken Losses after cogging when switching of the orbit feed-back: Structure in point 8 resulting from fluctuating BPM reading: BPMS.2L8.B1 V reading between 0 and 2 mm Some non closure in the attempt of the OFB to correct it resulting in higher losses at the collimators and beam dump due BLMQI.11R7B1E10_MQ (0.65 ms running sum)  disable BPMS.2L8.B1 (V), OFB bandwidth not changed

Issues and Measures taken Dump by interlock BPMSB.A4R6.B1: Mon 4/2: Interlock limit relaxed: out-of-limit counts in 100 turn window increased from 70 to 2000 After this change this BPMS did not trigger anymore, but the next one: dump at around 3 – 3.5 E9 charges/bunch

Issues and Measures taken Thu 6/2 14:59 Beam dump during cogging: too large momentum offset excursion for B2 (p) during the process  > 10 BPMs out of tolerance From the week-end the common frequency after cogging was trimmed by -10 Hz to keep the Pb beam closer to the central orbit (minimize losses during squeeze). This lead to larger energy offset for protons and a proton orbit which is further displaced outwards. On Wednesday we already reduced the common frequency offset from -10 Hz to -6 Hz  Increased the limit for the orbit position SW_interlock by 0.2mm  added another 4+2 Hz to the cogging frequency trims to move the p beam closer to the center  Thu: tuning of the cogging procedure to avoid large offsets Wed Fill 3534

BLM threshold changes In addition to the BLM monitor factor changes of last week: For ion losses downstream of the collimation regions in IP7 and IP3 Tuesday 5/2 For betatron cleaning losses during squeeze: BLM Monitor factor (MF) change as agreed by rMPP meeting this morning: - BLMQI.11R7.B1E10_MQ from 0.3 -> 0.45 - BLMQI.09R7.B1E10_MQ from 0.3 -> 0.45 - BLMEI.09R7.B1E21_MBA from 0.1 -> 0.3 - BLMEI.09R7.B1E22_MBA from 0.1 -> 0.3 - BLMEI.09R7.B1E22_MBB from 0.1 -> 0.3 - BLMEI.09R7.B1E23_MBB from 0.1 -> 0.3 - BLMEI.09R7.B1E24_MBB from 0.1 -> 0.3 Wednesday 6/2 Monitor factor of BLMQI.08R3.B1I10_MQ from 0.1 to 0.3 for IP3 losses at the start of the ramp

Satellites during VdM scans Satellite population reduced as compared to previous VdM scan (thanks T. Bohl!) Fill 3540 Fill 3537

Intermediate Energy p-p Run

No change wrt injection 2013 1.38 TeV run configuration J. Wenninger 50 ns beam, full machine, not pushed. Un-squeezed optics (b* = 10/11 m). Crossing angles ±170 mrad (also IR8). Separation ±1.5 mm. LHCb in good polarity, ALICE in negative polarity (PC). Beam size ~120 mm. Provides ≥ 10 times larger L than in 2011. Pre-cycle maintained at 4 TeV (also ramp down from 4 TeV). With 10x larger luminosity than 2011 we need ~24 hours of stable beams for 2 pb-1 No change wrt injection Run Nb Ib Nc b* e (mm) L (cm-2s-1) Stored E (kJ) Pile-up 2011 80 1.20E+11 68 11 2.7 4.34E+30 2122 0.45 2012 1374 1000 2.2 7.75E+31 36451 0.54 11/11/2018 LHC 8:30 meeting

Sunday: Preparation for p-p run 7:00 - 9:30 access: BPMS IP6, BI in IP4, ADT, ATLAS, CMS Interlock settings of BLM (thresholds), BPMS and RF reverted to high intensity pp settings ADT and feedback settings reverted to pp (bandwidth, gain, gating) BBQ, Head-tail monitor settings reverted Reverted ALICE polarity to negative BPMS interlock windows put back to 70 wrong readings within 100 turns. 10:00 – 16:00 2 cycles with probes to check the cycle, measure and correct tune, chromaticity and orbit, verify instruments and damper settings. Spool functions implemented to compensate the decay at flat-top Updated SIS limits for beta* and energy Updated the SIS COD and BPM interlock for STABLE beams BLM monitor factors increased on 13 monitors for roman pot set-up

Quick test of real-time squeeze starting from 11. 0 to 10. 5 to 10 Quick test of real-time squeeze starting from 11.0 to 10.5 to 10.0 and back to 11.0 m (ML and RS) Aim was to probe the feasibility of real time beta* leveling post-LS1. It was a naked squeeze in IR1 only with no prior orbit, tune, or chromaticity corrections included. 2nd order feedback effects on tune and orbit clearly observed. Beam lifetime OK throughout test.

p-p run preparation cont. 17:00 – 19:00 testing interlocks by BPMS with orbit bumps Abort gap monitor: calibrated p-p at 1.38 TeV and 450 GeV BRAN IP2 back in 19:30 – 20:40: loss maps at injection 20:40 – 4:30: cycle with 5 bunches: Collision set-up Collimator set-up (TCTs and TCLs) Vertical roman pot alignment and data taking (3 hours) Betatron loss maps in collisions and asynchronous dump test (RP moved to 22 sigma) Loss maps and asynchronous dump test at injection

Validation LBDS B1 train: tbd Injection (Inj. Prot. IN) Injection (Inj. Prot. OUT) Flat-top separated Un-Squeezed Collision (with RP IN?) Betatronic-H Validated OK tbd To be validated Betatronic-V Neg. off-mom -- tbd (+500 Hz) Pos. off-mom Asynch dump redo tbd=to be done LBDS B1 train: tbd BPMS position interlocks IP6: validated by J. Uythoven

1.38 TeV p-p run BSRT (B2) and beam dump checks with high intensity and LBDS check (B1) in parallel (5 hours) 1 cycle to complete off-momentum/betatron loss maps (4 hours) at 1.38 TeV Intensity ramp-up 1 fill with ~80 bunches (including some individual bunches for VdM scans) Multi_100b_46_16_22_36bpi9inj 1 fill with ~500 bunches 50ns_480b_471_0_461_72bpi12inj 1374 bunches 50ns_1374b_1278_36_1218_144bpi12inj

Quench test Thursday 6 am till Saturday 6 am Accesses for quench test: Scope installation in IP6 (12L6). 2 hours. It has priority over Q6L8 scope installation because we will need it on Monday morning (the first quench test). To be confirmed whether it can be done before high intensity tests/pp physics at intermediate energy Fast measurement system on RQ6.L8 (30 min in the UA83 by Jaromir Ludwig). Ramp to 300 A afterwards. LBDS check (E. Carlier – working hours) if in the shadow of another access

Current Setting Limits ADT: settings for 1.5E11 (will saturate at 1.7E11 and injection interlocked at 1.8E11) Gain modulation function for prepare ramp set to 2012 values RF: Phase loop for nominal proton intensity. Acquisition will saturate above 1.7E11. Pilots below 1E10 are unlikely to be measured.