The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.

Slides:



Advertisements
Similar presentations
Financing Wind Transactions Financing Wind Power The Future of Energy IPED Conference July 25-27, 2007.
Advertisements

Anntonette Alberti, JD Tetra Tech IPED Financing Wind Power
Community Wind Development
Version /13/ Video Lottery Terminal legislation included a 1.5 percent set aside of revenue to benefit small, minority- and women- owned.
Evaluating Standards for Site Certification Presented to: American Public Power Association Presented by: Robert M. Ady, President Ady International Company.
City of North Liberty North Liberty Area Development Corporation University of Iowa Community Credit Union Economic Development Partnership Project October.
POTOMAC WIND ENERGY Presents: Small Wind Turbines for residential and business use. May 2008.
Sustainable Landscapes Using Waste Sustainably Michael D. Pavelek II Greater Lebanon Refuse Authority.
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
SkyPower Corp. PRESENTATION.
Wind Farm Legal Issues ROGER A. McEOWEN
EverPower Eastern Projects Buckeye Wind Project Champaign & Logan Counties, Ohio 100 MW Highland Wind Project Krayn, Pennsylvania 115 MW The Allegany.
Wildlife Considerations in Financing Wind Power Albuquerque, New Mexico July 2007 Penny Jennings Eckert, Ph.D.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
Site Selection Robi Robichaud National Renewable Energy Laboratory August 31 st 2010 August 31 st 2010.
Financing Renewable Energy Projects: Issues and Opportunities Peter Y. Flynn Bostonia Partners July, 2013.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
WHY NOT RESIDENCIAL: Unpredictable wind speeds for each individual home Despite cost savings, solar still wins due to other variables Per unit offset.
Developing Wind Energy in Indiana: A Case Study of Benton County Ian Van Lieu April 25 th, 2008.
1 Renewable Energy in the Northwest: Wind Energy Presented By Stephen C. Hall STOEL RIVES LLP Journal of Environmental Law and Litigation Symposium University.
Energizing Michigan Energizing Michigan WIND ENERGY EDUCATIONAL PROGRAM FOR FARMERS AND LANDOWNERS Professor Stephen B. Harsh Department of Agricultural.
Wind Contracts A Farmer's Perspective Colette McLean Essex County.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
BIOENERGY SYMPOSIUM 2013 ANAEROBIC DIGESTION Regulations Ollie Frazier, P.E., MBA.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Wind Power– Can it make sense in Michigan ? Tom Hewson Energy Ventures Analysis Inc Arlington Virginia March 2003.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
 Fifth Third Bank | All Rights Reserved Vessel Financing Choices for Ferry Operators.
Presented by: Gerald W. Braun, Director Business Development June 17, 1998 A Business Unit of Amoco/Enron Solar Financing of Renewables: Considerations.
Small Farm Profitability: Is Wind Energy the Answer? 1
Wind Turbine Lease Considerations for Landowners Dwight Aakre Ron Haugen February 2010.
Negotiating Wind Park Easements and Analyzing Comparable Sales presented by Justin Bierschwale Bierschwale Appraisals PO Box College Street Junction,
Oil and Wind Energy: North Dakota Update Dr. Cole Gustafson Feb. 9, 2011.
1 Utility Ownership of Wind Power: Why it makes sense now American Wind Energy Association May 17, 2005 Eric Markell Senior Vice President Energy Resources.
Chapter 6 Own a Home or Car.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Financing: Notes and Mortgages
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Overview of Legal Issues in Renewable Energy Projects Renewable Energy Summit 2009 Ainsley Heffernan Partner, Beauchamps Solicitors. Dundalk, 21 st January.
Overcoming Barriers Expanding the Market for Small Wind Energy Systems Small Wind 102: Economics Making the numbers work Small Wind 103: Siting Issues.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
12/5/2003Global Energy Concepts, LLC1 of 11 Characteristics of Financeable Wind Energy Projects Northwest Power and Conservation Council Workshop on Wind.
DOE OFFICE OF INDIAN ENERGY Step 5: Project Operations & Maintenance (O&M) 1.
OUC’s EV Roadmap Near Term Planning Activities Develop a flexible framework and visionary roadmap Collect actionable information Business models Charging.
DALLAS BAR ASSOCIATION ENERGY LAW SECTION REVIEW OF OIL & GAS LAW XXIII SEPTEMBER 11-12, 2008 Lisa Chavarria Stahl, Bernal & Davies, LLP Austin, Texas.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
Chapter 3 Financial Management Part 2 BCN 4772 Summer 2007.
Wind, Wind Power and Vestas Implementation of Wind Power.
1 Invenergy. Harnessing the Wind Transmission System Typical Wind Park Electrical Transmission System.
Third-Party Solar Financing Options in New Hampshire 1.
Engineering, Policy, Finance
Every state in the nation benefits from wind energy.
Presented to ABA RADER Committee/Columbia Law School's Environmental Law Society Symposium INTRODUCTION TO RENEWABLE ENERGY DEVELOPMENT Becky.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Berkshire Wind: Joint Action By Communities with Common Goals Presented by: David Tuohey, Director of Communications & External Affairs Massachusetts Municipal.
Planning and Realisation of Wind Farms
Wind Energy in Iowa Lori McDaniel
Barriers and Challenges to Developing Renewable Energy Projects
Community Wind Development
Costs and Economics of Construction
Development of Solar PV Projects on Brownfields
Distributed Solar Energy California´s Experience
Engineering, Policy, Finance
Renewable Energy Project Investments
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced ACCESS to transmission lines (proximity and carrying capacity)

Site selection Evidence of significant wind resource Preferably privately owned remote land Proximity to transmission lines => 69 kV (up to 25 miles for good site and => 135 kV). Note possibility of future transmission lines. Reasonable road access Few environmental concerns Receptive community

Land Term: expected life of the turbine (early 20 to 30 yr, 10 yr option; later 30 to 50 yr, multiple 10 yr options) Rights: wind rights, ingress/egress rights, transmission right of way for wind farm Owner compensation: percentage of revenue, per turbine, or combination Assignable: financing requirement Indemnification Reclamation provision Bond to remove wind turbines at end of project Wind energy easements, legal issues

Wind resource assessment Lease, $/acre, 1 to 5 years, or flat fee. Corollary data: wind maps (national, state, other), NWS data, Other Install meteorological tower(s), hub height or at least 50 m Collect 10 min or hour wind speed and direction data, 1-2 yr, minimum one year Quality report on meteorology Output projections for several turbine types Landowner receives data, meteorology report, and output projections if developer does not exercise option for installation of project.

Environmental Cursory review for endangered species Biological resources Wildlife habitat Loss of vegetation Avian studies Raptors Migratory birds Review with interested parties: Audubon, federal, state, local Required studies and reports Bats Archaeological sites Noise Visual Soil erosion and water quality Solid and hazardous wastes Active compliance monitoring

Economic modeling Output projections Turbine costs Turbine installation Roads, substations, transmission Communication and control Taxes: sales, income, property (depreciation schedule), tax abatement O&M estimates Finance assumptions: production tax credit, accelerated depreciation, equity rate of return, incentives (local, state), debt rate and term (coverage ratios), dept/equity ratio Other: insurance, legal

Interconnection studies Interconnection request, electric reliability council Capacity limitation Load flow analysis Voltage controls System protection

Permits Local, state, federal Public involvement at early stage Public land, private land Land use permit Building permit

Sale of energy/power Energy/power purchase agreement Long term contract with utility Green power market Market, avoided cost Renewable energy credits Future income, emission trading Kilowatt hour: real or nominal levelized Capacity: kilowatts Term Credit worthy buyer Facility sales agreement Turn key price, complete project

Financing Source of equity; rate of return 15-18% Source of debt Market rates Term of debt Assignable documents Third party due diligence

Turbine purchase Power curve (output projection) Turbine cost Turn-key construction cost Warranties; equipment and maintenance Construction financing Past history of manufacturer Availability of turbines, date

Construction (turn-key) Roads Water and gravel Turbine foundations (excavation, concrete) Interconnection to utility (substations, transformers, wire) Turbine assembly and erection (cranes) Commissioning Environmental restoration Reduce road width? Grass Control of noxious weeds Assembly area

Maintenance Fixed cost per turbine per year Availability warranties Penalties for non-performance Types of costs Labor Management Insurance, taxes Maintenance equipment; cranes, vehicles, other Parts on hand Non-recurring costs: major repairs Roads, maintenance and access for landowner