ScotRail Alliance Performance Improvement Alliance

Slides:



Advertisements
Similar presentations
Winter Service 2011/2012 Kevin Campbell/ Bob Ogg Boundary Issues/ Communications.
Advertisements

Region 9 Healthcare Coalition Ebola Symposium April 23 rd, 2015.
Out of school hours care Contract management plan information session.
 PRASA’s Strategy identified short, medium and long-term interventions to improve rail services in the country.  PRASA identified operational interventions.
London Metropolitan University Business Continuity Management Seminar Friday June 27 th 2008 The Henry Thomas Room LUNCH.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 8 - Contractual Relationships.
Diabetes Programme Progress Report Dr Charles Gostling, Joint Diabetes Clinical Director October 2013.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Indonesian Timetabling Conference Introducing Timetabling and Train Control where there a Multiple Operators 31 May 2011.
NOT PROTECTIVELY MARKED Bill Lyons Head of Resilience Scottish Environment Protection Agency.
Business Continuity Program Orientation (insert presentation date) (This presentation is a template that requires adjustments to meet your needs)
St John Project Transport to the Medical Home 20,000 Days Campaign Learning Session March 2013 Project Manager: Jo Goodfellow.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure To develop contingency plans for managing unplanned incidents John Edwards.
Aberdeen City Briefing 13 th May Project Scope – Phase 1 Transport Scotland’s specification for delivery by Mar 2019: Half hourly service between.
March 2012 Flood event – Community Engagement. Todays discussion 1.Summary of the event 2.Impact on the community 3.Opportunities for engagement 4.Key.
/ Reducing Risk of Collision within T3 possessions: 5/15mph Brief London North Western.
NHS England Emergency Preparedness, Resilience and Response (EPRR) Business Continuity exercise Staffing – reduced availability
Healthier Together Joint Committee Wednesday 15 th June 2016.
PRESENTATION TO PUBLIC SECTOR RISK MANAGEMENT FORUM PRESENTED ON BEHALF OF GOVERNMENT CONTINUITY FORUM BY: MR JUSTICE NEPFUMBADA.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
NatWest Strathclyde University Branch Closure
ROLE of a Continuous Improvement LEADER
Implementation of integrated care pathways – the basics
Taught Postgraduate Program Review
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
ISO 14001: 2004 Environmental Management Review Presentation
Current Plant Performance
Successful Integration is a result of good governance – getting the wiring right Integrated care as an aspiration is simple, and simplest if one begins.
Quality Improvement Group
SA&S-Fortnightly Status Report – Overview Period Ending 3rd May 2017
SNOD – Specialist Requesters
NHS GG&C Police Custody Healthcare
Elaine Wyllie Executive Director of Joint Commissioning
ROLE of a BLACK BELT CANDIDATE
ASOSAI Working Group On Environmental Auditing
STRATEGIES FOR fire & EMS Efficiencies
Fire Protection and Prevention in Ontario First Nations
North Somerset Zero Suicide Steering Group
Key Information Summary (KIS)
Suicide Prevention Coalitions: The Backbone of Community Prevention
America’s First National Critical Infrastructure Exercise
FTPE Performance Recovery
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
Network Rail South East Route Performance for NTF 22 October 2014
Helpful Hints for action to prevent elder abuse
IUC / NHS 111 Workforce Blueprint
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Cybersecurity Special Public Meeting/Commission Workshop for Natural Gas Utilities September 27, 2018.
CQC: The new approach to inspection
NHS 24 Winter Planning 2011/ 2012 Managing the Risk
National Ambulance Service (NAS) Martin Dunne Director NAS
Coordinate Operations Standard
ScotRail - Ill Passenger Policy
9-1-1 Implementation NWT Association of Communities 2017 Annual General Meeting This topic is about the GNWT’s effort to implement a territory-wide Basic.
Commissioner Feedback for SLAM CQC Inspection in September 2015
Audit to improve consistency & reduce variation
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
TECHNOLOGY ASSESSMENT
Deferral of Retrospective Updates Functionality
Karen Hawkins Associate Director of Commissioning & Delivery
Ebola Facts October 15, 2014.
Taught Postgraduate Program Review
Living With & Beyond Cancer: SWAG Breast SSG Update
Xoserve IX Refresh Customer Update 04/04/2019.
DPI Must Win Route Best Practice Sharing Updates – Feb17.
Operational site management principles
Laboratories Oversight Board 14th March 2019
Operational site management principles
Departmental Assurance Survey
Presentation transcript:

ScotRail Alliance Performance Improvement Alliance

ScotRail Performance Since April 2011

Background Performance Performance overall has declined from Period 1/16 (April 2016) Queen Street Tunnel Closure (EGIP Works) Conductor Dispute (Extension of single manning agreement) Timetable changes as a result of Queen Street re-opening. Franchise required us to Produce Improvement Plan September 2016 (Period 6/16) PPM MAA at this point was 89.6%. Improvement Plan development completed, and improvement activity started October 2016 (Period 7/16) In the last 8 periods, the MAA has increase by 0.8% to 90.4%. on each of the last 7 periods, we have beaten the performance in the corresponding period the previous year. Positive engagement plan maintained with Transport Scotland and the Office of Road and Rail throughout. Formally moved out of Improvement Plan level at the end of Period 12/17 (March 2017)

ScotRail PPM by Period

Improvement Process – Monitoring Progress All Alliance Approach Improvement Process Weekly Review of Improvement Plans – Operations, Fleet, Infrastructure. Separate review with each Director and their team to review progress against Action Plans, identify requirement for additional action plans, along with completed, due 7/28 days and out of date actions. Performance Improvement Plan Score Card To inform ScotRail Exec Directors and Alliance Managing Director of progress against planned progress of actions across the ScotRail Alliance, advice on overdue Actions and dates to recover against plan. Performance Control Room – All Delivery Department Directors Attend Review the previous week's performance. Review of Improvement actions, Identification of Further Improvement Actions required, Identification of joint Alliance Improvement Actions. Performance Executive Review - All Delivery Department Directors Attend High Level review of Performance, High level review of performance Risks, and mitigation in place. Review of performance and progress of improvements by Directorate. Process audited by NS Audit, and deemed satisfactory, with positive comments on good practice highlighted on continuous improvement, commitment and ownership and stakeholder communication and engagement.

Performance Improvement Plan Tracker

Improvement Plans – Key Themes Go – Look – See Exercise to identify/clarify what issues require to be addressed. Discreet incremental changes to our timetable (North Electric and Argyle lines). Revised maintenance and protection during peaks for High Impact Areas Disciplined Operations Performance Days. Social Media Campaigns. Depot Performance Plans Granularity – 1-2-1 with worst performing Drivers – Unexplained Delay/Driver Error. Lineside Equipment Cases Addition Rules of The Route Access to facilitate Infrastructure Enhancements Pneumatic Point Replacement Glasgow Central Enhancement to Remote Condition Monitoring. Cable Replacement for example at Hilton Junction 30 km of cable renewed. Implementation of signalling system relay testing across the network. Fleet modifications – Coupler and CCTV Renewal on 334’s, Radiator Change on 158’s

Improvement Process – Conference Calls Alliance approach to Service Recovery. 10:30 Conference Calls Each weekday – Director/Senior level attendance from across the alliance. To review performance during the Morning Peak. Review the immediate recovery and improvement actions for any Infrastructure, Fleet and Operations issues during the Morning Peak. Critical review of Customer Information/Communications as a result of any perturbation of Service. Review the action being taken to recover an on time service, look forward to any risks presented as a result of weather or possessions. to review the high impact trains and short formed services ensuring adequate mitigation has been taken. 15:30 Conference Calls each weekday - Director/Senior level attendance from across the alliance. To review performance prior to Evening Peak. Review the immediate recovery and improvement actions for any Infrastructure, Fleet and Operations issues which are ongoing. Critical review of Customer Information/Communications as a result of any perturbation or short formation of Services.

Request for Emergency Services to a Train On becoming aware of an ill/injured passenger that may require an ambulance, train crew must call 999 directly. Passenger to Ambulance as opposed to Ambulance to Passenger As part of the 999 call, key questions about the patient will be asked, all relevant information should be provided to Ambulance Control. Information for SAS control staff   Emergency Call Handler Process through C3/ProQA using relevant Protocol asking all Case Entry and Key Questions and provide all possible and appropriate PDI/PAI’s. If prompted pass to CSD or NHS24 via normal process. Duty Manager/Supervisor Liaise with the ScotRail Control Duty Manager to agree the most suitable station for the responder to rendezvous. Scot Rail contact number: 0141 335 2040, back up 0141 335 3843 ScotRail Control Duty Manager will liaise with the SAS Duty Manager/ Supervisor to agree on the most suitable station for the responder to rendezvous based on the patients clinical need. If clinically appropriate, it may be that an ambulance does not respond and the patient is referred to either NHS24 or SAS clinicians for further triage.