Possible new targets 6 May 2016 – ISO Meeting to decide if Product Implementation Guide (IG) can be published or must go to 2nd Ballot Assuming 2nd Ballot.

Slides:



Advertisements
Similar presentations
Training Guide. `
Advertisements

The ISO EXPRESS and Binary Data Project January 2005.
Electronic Submission of Medical Documentation (esMD) AoR L2 Harmonization July 3, 2013.
Electronic Submission of Medical Documentation (esMD) AoR L2 Harmonization July 17 th, 2013.
The ISO EXPRESS and Binary Data Project Last Modified: June 2005 Following ISO SC4 Valencia Meetings.
1 Austin, TX November 11 th, 2004 TX SET Update. 2 TX SET Version – 2.0A – 2.1 Discussion Topic.
1. 2 TX SET Version Release Schedule RMS Assignment /Action Item Form Discussion Topic.
Electronic Submission of Medical Documentation (esMD) AoR L2 Harmonization July 31 st, 2013.
From ODF pre-1.2 to ODF 1.2 Rob Weir Co-Chair OASIS ODF TC
Structured Data Capture (SDC) Community Meeting August 18, 2016.
FIM4R and FIM IG coordination C.M. Zwölf, H. Short
2nd Project Meeting Berlin, 1 December 2000
Task Group API 19SS Sand Screens
XLIFF 2.x release cadence
Kathy Luther Vice President
EUROPEAID/121737/D/SV/RO - Training in Project Cycle Management, Procurement and Contracting of Pre-Accession Projects and Management of EU Structural.
Line of Development 1 (LoD1)
SOA FHIR Action Items Creating SOA labeling standard/name space/naming convention for FHIR Operations.
SOA FHIR Action Items Creating SOA labeling standard/name space/naming convention for FHIR Operations. The expectation is that SOA FHIR services will be.
WG Technical Editor’s Report
WG Technical Editor’s Report
Opener: What is plagiarism? What do you know about MLA citation?
Task Group API 19SS Sand Screens
Status Report November 2007
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
FHIR Implementation Guide for Data Exchange for Quality Measures

How to develop a program




Yearly Maintenance Process (for existing messages)
صرع بر اساس راهنمای ارزیابی و درمان اختلالات سلامت روان
Disclaimer The content in these slides represents the anticipated/targeted dates of incorporation or update of the standards used in the annual update.



Welcome address Ole Damsgaard, Joint Secretariat
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Over the course of the film, much will be said about the technology needed to get to and live on Mars. You must identify 5 technologies that are real today.

doc.: IEEE /364r0 Mika Kasslin Liaison to
ПОЛИТИКА ПО КАЧЕСТВОТО НА МУ – ПЛЕВЕН
IPAT and Transition to BIRS Symposium Article Opportunities – 2018

American History Unit: 1950s to Present Topic: Review

February 19 March 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: RFID-SG Closing Report for Orlando,
ISO TC67/SC4 Annual Meeting
on propulsion of OBD2 gtr

Mathematics Domain California Preschool Learning Foundations Volume 1

IEEE P Working Group for Wireless Personal Area Networks


New EU Target Market Model & SEM HLD Consultation Workshop
АВЛИГАТАЙ ТЭМЦЭХ ҮНДЭСНИЙ ХӨТӨЛБӨР /танилцуулга/
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017



© 2018 The Hartford. Classification: Internally Controlled



ISO 13485:2003 Requirements that overlap with ISO 9001
IEEE ah Timeline Projection
Presentation transcript:

Possible new targets 6 May 2016 – ISO Meeting to decide if Product Implementation Guide (IG) can be published or must go to 2nd Ballot Assuming 2nd Ballot needed – targets are: 1Q 2017 – ISO Product IG publication 2Q 2017 – EU Iteration 1 Product IG publication 2Q 2018 – EU Iteration 1 Product Submission Start 4Q 2018 – EU Iteration 1Product Submission Required EU Product Submissions Required ISO Product IG Published Q1 2017 Q4 2018 EU Product Iteration 1 IG Published ISO Meeting EU Product Submissions Start 2016 5/6/2016 Q2 2017 Q2 2018 2016 May Today Sep 2017 May Sep 2018 May Sep 2018