Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
Saturday 1.3 e32 Overnight Morning
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
LHC Operation Week 38 Coordination G.Arduini, R.Bailey
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Mike Lamont, Jorg Wenninger
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Tuesday
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Operation Week 41 Coordination G.Arduini, M. Lamont Aim for the week Peak luminosities > 1032 cm-2 s-1

Statistics Mon 11/10 at 07:00 to Mon 18/10 07:00 Major stops: Set-up with beam: 56 % Stable beams: 21 % Set-up without beam: 10 % Faults: 13 % Delivered luminosity: ~ 7.8 pb-1 Total luminosity delivered so far: ~23.8 pb-1 Major stops: Access for injection loss investigations, MKI, LBDS

Overview Injection loss issues with us for most of the week Tue 12/10 > 1.3 1032 cm-2 s-1 but only for 1 minute  fill with XS emittances and XL beam-beam tune spread Thu 14/10 1032 cm-2 s-1 in stable beams with 248 bunches/beam Fri 16/10 VdM scan for the experiments completed Increased number of bunches from 248 to 312 Sun 17/10 Quench test at 3.5 TeV Peak Luminosity of 1.48 1032 cm-2 s-1 dumped by UFO after 0.5 h just above threshold Injection loss issues with us for most of the week

@end of coast (from Lumi scan) [mm] Collisions Fill # bunch N bunch [1011 p] eH/V B1 @inj [mm] eH/V B2 Lpeak [1032 cm-2s-1] eH/V @coll. from lumi Stable beams [h] Lint [pb-1] Reason for dump @end of coast (from Lumi scan) [mm] 1408 248 1.02 - 0.94 2.5 9.5 >2.4 Prog. 3.8/3.9 1410 256 1.04 1.5/1.3 1.4/1.6 1.3 1.8 BLM on MQW 1418 1.7/1.6 2.1/2.2 1.03 2.4 8.5 PC IT.R1 1422 16 0.78 2.4/2.6 2.6/3.2 0.018 3.9 5.5 0.03 LBDS 1424 312 1.13 2.0/1.9 2.2/2.4 1.35 2.6 1 0.4 UFO LHCb BCM 1427 0.89 2.0/1.8 0.86 2.3 3.2/3.1 1430 1.15 1.48 0.6 0.3 UFO Pt.4 Typical emittances in collision 2.5 mm Studies on XS emittances to be continued..

Fill #1410 Lifetime dip to ~1 hour recovering to 5 hours BLM 83 s running sum triggered the beam dump on MQW (threshold lower by a factor 10 as compared to similar magnets in the same region)  corrected afterwards  to be continued Luminosities compatible with emittances of ~1.8 mm for a beam-beam tune shift of approximately >0.02 (for bunches seeing 3 collisions) h

Fill #1410 Separation bump Beam loss Still cleaning beam dump The LHC beams will cross each other and experience perturbations as a result of the beam-beam effect at the interaction points, which can result in emittance growth and halo creation. The beam-beam force is approximately linear for small offsets and highly non-linear for larger offsets with peaks in growth close to 0.3 and 1.5 σ separation S. M. White, H. Burkhardt, S. Fartoukh, T. Pieloni Still cleaning beam dump M. Lamont On set of losses at: 6.4 sigma Peak losses at: 1.4 sigma

LHC protons 2010: mission accomplished

Stable beams #1430 3.6x1013 p/beam in collision (~20 MJ/beam) L0>1.3x1032 cm-2 s-1  Emittance in collision 2.4 um Damped by UFO event after 0.5 hour (~250 nb-1). UFO event on beam 1 close to BSRT in point 4 (just above threshold)

VdM scans (15/10) 3-4h delay due to pt 8 trip. Terminated prematurely by LBDS interlock (MKB fake vacuum reading)  not the first time!!  Redundancy to be added? Completed all VDM Still to do: length scale calibrations in IP5 and IP2 can be done in physics longitudinal scan tests can be done in physics, but better test once in a low intensity fill ? CMS scans LHCb scans ALICE scans M. Ferro-Luzzi

B. Dehning, J. Wenninger et al. Quench test (17/10) Quench test: Beam intensity: B1: 2.38x1010 p (eH/V=6/7 mm) B2: 2.05x1010 p (eH/V=11/13 mm) bump at MQ14.R2 vertical positive (B2) Total loss ~1x1010 p in 7.3 s Losses about a factor 10 below the threshold values (see plot). The thresholds were increased by a factor 3 before test. QPS thresholds exceeded on MQ14.R2 Preliminary conclusion: BLM thresholds should be decreased by a factor 3 (or more) to avoid QPS triggers  to be analyzed in detail B. Dehning, J. Wenninger et al.

Injection issues - summary Un-captured beam from SPS Thursday-Friday night Swept across TDI by injection kick – dumped by LHCb Tracked down to 800 MHz in SPS Obstruction in MSI at IP2 leading to losses at B1 injection Deterioration observed in 2 occasions: Fri 08/10 and & Sat 16/10 Capture losses in LHC Very dependent on longitudinal beam quality from the injection (150 ns is not good in that respect) Very (too?) low tolerances in LHC – general issue with fast losses at 450 GeV – dumping beam after the event

Injection losses Thu-Fri night Thorough verification of the beam quality in the SPS started in the night and continued during the morning (T. Bohl): found 800 MHz RF frequently not locking to reference (given by main RF system)  source of noise, blow-up and uncaptured beam even at SPS flat-top  corrected  need for remote monitoring of the RF frequency and/or alarms when not correct Increased the LHCb BCM threshold by factor 3 SPS 800 MHz RF not OK SPS 800 MHz RF not locking SPS 800 MHz RF OK

Injection losses B1 Radiation survey and X-ray (Tue 12/10) have evidenced a clear aperture restriction at the transition between the injection septa MSIB/MSIA due to a non-conformity in the mounting of the interconnection Circulating beam Injected beam J-M. Dalin

Injection losses B1 Wed 13/10 aperture scans of problematic region in injection septa L2 TL steering and associated correction in LHC High losses High losses old old 4 mm Vertical +1 mm Horizontal new new No losses No losses C. Bracco, B. Goddard et al.

MSI interconnection repair MSI solution is not stable: deteriorating with time Preparing to intervene on the interconnection (3-4 days): Inject Neon open and fix: removal of the inserts and RF fingers (to be reinstalled later during Christmas stop) pump, bake, pump And move technical stop to Tues-Wed-Thurs next week

Plan for the day Loss Maps measurements until 11:00 11:00 – 15:00 Abort gap cleaning 15:00 – 20:00 RF studies Physics overnight, if problems at injection Plan B with studies.

List of Studies Periodic loss maps Orbit shift versus TCT check: collide 1 bunch and check the TCT center change as compared to predicted orbit change. All in one ramp, squeeze, collide - 1 shift Plus test of 'dynamic' references for the OFB (varying Xing.separation bump): injection, then test of ramp + first part of squeeze IR aperture at 3.5 TeV 50 ns – pilot runs After 3-4 fills with ~400 bunches Push beam-beam tune shift with 150 ns one test already performed with #1410 Beta* measurement in IP8

List of Studies Injection and Dump: RF: RF noise measurements Abort gap cleaning tests B1/B2 at 450 GeV and 3.5 TeV [2 shifts] Injection gap cleaning deployment tests, 450 GeV, B1/B2 [1 shift] High intensity 32b injection for B2 - filling and P6 interlock checks for 350 and 400b schemes [4h] MKI8.B2 fine timing adjustment (1st bunch in train always gets too large a kick), and also synchronisation checks [2 h] 50 ns bunch train injection for B2 [1 shift?] Studies SPS-LHC emittance preservation at injection, and growth on flat bottom [1 shift] Asynch dump tests 3.5 TeV for B1/B2, to check stablity [1 ramp] RF: RF noise measurements

List of Studies BI: Check the linearity of the fast BCT’s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions – started… Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT PLL studies during ramp continued JJG: for all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. One shift

Massi’s desiderata 50 pb-1 total (24 delivered so far) 9 fills@3 pb-1 ~ 9 good days Alice – fill without dipole/solenoid Totem – dedicated fill Totem – 90 m optics LHCb – switch polarity – plus test ramp (combine with BI plus map)

Access Requests Verification of the flange alignment between MSIB and MSIA  2 hours TE/VSC Verification MSI transition in point 8  ½ day (Radiography) IR1 solenoid (for e-cloud suppression) controls Intervention on DCBCT  P. Odier (2 hours) ALICE pixel cooling: 8 h