John Amann ILC Mechanical Engineering 10/31/06

Slides:



Advertisements
Similar presentations
01/07/2008HCAL Main Meeting- Mechanical Integration1 ILD HCAL Mechanical Integration HCAL Main Meeting Kirsten Kschioneck, DESY.
Advertisements

11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
ENG M 501 Production and Operations Management Exam #3 Summary April 2009 John Doucette Dept. of Mechanical Engineering University of Alberta
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Progress on the Coupling Coil & Focus Coil Interface Engineering
Introduction to Computer Engineering by Richard E. Haskell 8086 Memory Module M14.1 Sections 9.3.
Push Pull Considerations
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
PD5: Detector Integration / Machine Detector Interface T. Markiewicz/SLAC 15 May 2014 SiD Meeting / AWLC Fermilab Summary.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Agenda : CLIC Civil Engineering and Services (CES) WG.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Date Event Global Design Effort 1 Platform Moved on Hillman Rollers, Deformations John W. Amann ILC – Mechanical Engineering 9/12/07 IREng07.
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
1 Engine Mechanical Labs R. Bortignon. 2 Repair Information – essential! locate model number!
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
Using Tangent The angle formed by a horizontal line and a line of sight to an object above the horizontal line. You can use the angle of elevation as.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Second Grade Word List Second Grade Sight Words. 224.
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
Integration Open Questions (some urgent questions only … ) ◊Position of the couplers ? ◊Will there be a separate cryoline? ◊Architecture of the RF power:
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
S-BPM Support Issues to be discussed with LAPP and KNU
TDR guideline discussion on Cavity Integration
SM18 RF M7 Bunker Project Status 14th July 2017
Conventional Facilities and Siting Global Group (ARCFS)
Design of the Injection Can
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Another Difference Among Animals and Things By Mr. Guillen
ILC Interaction Region and Machine Detector Interface
Progress and Issues with VTS Upgrade
Summary of WG2 :CFS for staging
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Latest ILC tunnel cross section May 2017
Operating SRF systems reliably in a “dirty” accelerator
SiD Muon Yoke Structure - Deformation Studies -
Design Concept Update – Platform Moved on Hillman Rollers
Detector hall in mountain regions
Journal of Vision. 2017;17(12):21. doi: / Figure Legend:
Radiation Physics requirements for the IR
Ron Settles MPI-Munich
ATF Extraction Septa Magnetic Modeling with ANSYS
Dee1 View from back of back plate
Andrei Seryi Materials for discussion TILC-08
The Skeleton Dance.
Review Day M2 Unit 1C: Day 8.
Game review By ?.
Push-pull cryo configuration C
Presentation transcript:

John Amann ILC Mechanical Engineering 10/31/06 BDS Design Studies John Amann ILC Mechanical Engineering 10/31/06

Symmetrical Pac Man Line of Sight Gap Needs Overlap Overlap Seals Gap Gap Sealing Recess for Detector Gap Sealing Recess for Tunnel Mouth Amann 10/24/06

Realistic GLD Model Amann 10/24/06

Symmetrical Pac Man Amann 10/24/06

Vertical Opening Symmetrical Pac Man Amann 10/24/06

FD Cryostat/Pac Man Interference Cryostat Ports QFEX2BS FD Cryostat Amann 10/24/06

Work in Progress…… Design of cryostat/beam line breaking point. Crab cavity model. Air caster modules for GLD feet. Re-design Pac Man to accommodate cryostat connections and seal all gaps. Amann 10/24/06