TELESCOPE CONTROL SOFTWARE

Slides:



Advertisements
Similar presentations
Training Course: Task List. Agenda Overview of the Task List Screen Icons across the top Making Appointments Viewing Appointments & Filters Working Your.
Advertisements

3.60 CEREC Connect Lab Import
1. Objective 1 Overview of the Linux Desktop  X Server  Controls Graphical Interface  Manages Input Devices  Transmits Input actions to the client.
PC Encryption installation progress/password screen Includes comments from: Encryption team Sarah Deane Tony Stieber Selected people who took part in the.
Internal staff release only X-Call V2.0 - Installation for Emis LV & PCS Jayex Technology Limited X-Call Version 2.0 March 2010 v
Internal staff release only X-Touch V 3.63 Installation Guide for Emis LV & PCS Jayex Technology Limited March 2010.
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
DNR-322L & DNR-326.
KX-NS1000 Initial Set Up For step by step : 16 May,
Microsoft Windows Vista Chapter 6 Customizing Your Computer Using the Control Panel.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Downloading and Installing AutoCAD Architecture 2015 This is a 4 step process 1.Register with the Autodesk Student Community 2.Downloading the software.
Installation on Windows Vista/Windows 7 NOTE: Installation on Windows Vista can differ depending on the version of Windows installed​ ​ In most computers.
Operating Systems Day 1. Booting a Computer 1.Switch on the UPS electricity supply - green light electricity failure - red light charging – orange light.
1. 2 LXU800 User’s Manual 1.Installation – Windows XP UI Features Introduction Data Connection & Disconnection.
A walkthrough of the SageQuest Mobile Control Online & ESC integration.
HCare access on an iPad hCare access is the remote access to PGH. The steps for installing vary from the Mac somewhat. This will guide you. Installation.
Digital Logic and State Machine Design Installing Xilinx WebPACK 12.4 CS 2204 Digital Hardware.
Thrive Installation.
Configuring the MagicInfo Pro Display
Copyright 2007, Information Builders. Slide 1 Maintain & JavaScript: Two Great Tools that Work Great Together Mark Derwin and Mark Rawls Information Builders.
Introduction to the WebBoard Terry Dennis. The WebBoard - Our Connection The WebBoard URL is
Be active! Cell phones ON! Take care of yourself!
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
Installing and Using Active Directory Written by Marc Zacharko.
FIELD PREDICTION SOFTWARE © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange
P. 1 The Use Of Freeware To Teach Astronomy Dr H F Chau Associate Professor Department of Physics, HKU.
TELESCOPE CONTROL SOFTWARE © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange
C2PU TELESCOPES © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange
Explore GNOME The easy way, using a live CD By Carl Weisheit.
SNG via Webinar. Where’s Webinar??  Double click Aflac 2000 folder  Highlight “SNGWebCommunicator”  Right Click and “Send To - Desktop”
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
CNC Motion BenchMill 6000 Machining Center
Introduction to Notes Sui for Teachers.
Introduction to Notes Sui for Students.
For help or more information, please contact the P&W SRM team at ;
Author: Mr. Richard Crisler
Development Environment
VirtualDoxx Training Guide for USDA NRCS
WORKSHOP 1 introduction
Customer Log-In One-Stop Service Tracking (OSST) System
WikID installation/training
The first change to your project files that is needed is to change the device to the correct FPGA. This is done by going to the Assignments tab on the.
1.0 COMPUTER NAME & WORKGROUP SETTING
Bomgar Remote support software
BASICS FOR ASTRONOMICAL OBSERVATIONS
New Mexico Emergency Operations Center (NMEOC) Basic ETeam Training
THE LHIRES-III SPECTROGRAPH
FTS 2 (Failure Tracking System) System Test Process Flow
Windows Operating Systems (Cont.)
Version 02, 15/08/2017 A SOFTWARE FOR STAR FIELD PREDICTION AND TARGET OBSERVABILITY ASSESSMENT Conférence présentée à PARSEC, le 1er octobre Jean-Pierre.
How To Use As Another Account On Gmail
What is QuickBooks File Doctor The demands of the industry have taken a great leap with advancement in the technology. This advancement has caused various.
GTS WebSocket General Guide
Multi-host Internet Access Portal (MIAP) Enhancement Guide
Epic Access.
LGC Website, Software updates, Documentation, and Videos
WEB SERVICES FOR SOLAR SYSTEM
C2PU TELESCOPES Version 02, 28/08/2016 Jean-Pierre Rivet CNRS, OCA,
C2PU IN A NUT SHELL Version 03, 05/02/2017 Jean-Pierre Rivet
Windows xp PART 1 DR.WAFAA SHRIEF.
Windows 7                      .
Lesson Two: Customizing Task Lists to Display Tasks
STELLAR OCCULTATIONS Version 01, 14/10/2016
AGILENT TECHNOLOGIES RESTRICTED
C2PU TELESCOPES Version 02, 28/08/2016 Jean-Pierre Rivet CNRS, OCA,
KIDS IEP & DATA MANAGEMENT TRAINING
University of Warith AL-Anbiya’a
Wings 2.0 Business Flow Reference
Windows Operating System
Presentation transcript:

TELESCOPE CONTROL SOFTWARE Version 04, 15/08/2017 TELESCOPE CONTROL SOFTWARE Conférence présentée à PARSEC, le 1er octobre 2005. Jean-Pierre Rivet CNRS, OCA, Dept. Lagrange jean-pierre.rivet@oca.eu © C2PU, Observatoire de la Cote d’Azur, Université de Nice Sophia-Antipolis

Launching the TCS TCS: Telescope Control System (or Software) On the Telescope control computer’s desktop, double left-click on the TCS software icon: Unless otherwise specified, always use the icon with the highest version number (here: 76). 12/11/2018 C2PU-Team, Observatoire de Nice

Launching the TCS TCS: Telescope Control System (or Software) A banner pops up, asking for permission to switch the power boards on: Answer “Yes” for a normal observation run, or “No” for a debugging session. 12/11/2018 C2PU-Team, Observatoire de Nice

GUI: Graphic User Interface The TCS GUI GUI: Graphic User Interface 12/11/2018

GUI: Graphic User Interface The TCS GUI GUI: Graphic User Interface Hardware control Date / Time Slit control Telescope’s coordinates Dome control Focalization Tracking modes Telescope’s keypad Meteo conditions Prime focus filters Target infos Threads infos Service zone 12/11/2018

C2PU-Team, Observatoire de Nice The date / time zone UTC Julian date Date (Local Time) Time (Local Time) UTC time True Local Sidereal Time 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The keypad zone Hour angle  slow Declination > 0 Hour angle  fast Declination  fast Hour angle < 0 Declination  slow Declination  slow Hour angle > 0 Declination  fast Hour angle  fast Declination < 0 Hour angle  slow 12/11/2018 C2PU-Team, Observatoire de Nice

The telescope’s coordinates zone Right ascension (hh:mm:ss.s) Declination (+dd°mm’ss.s’’) Hour angle (hh:mm:ss.s) Airmass Azimuth (ddd°mm’ss’’) Elevation (dd°mm’ss’’) 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The slit control zone Stop any ongoing process Start the dome’s slit opening process Start the dome’s slit closing process 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The dome control zone Dome rotation East Start automatic mode Dome rotation Stop Set dome in park position Dome rotation West Synchronize dome’s encoder (requires privilege) Validate azimuth correction (*) Dome’s azimuth (*) Corrected target azimuth (*) (*) more on that later... 12/11/2018 C2PU-Team, Observatoire de Nice

Azimuth correction Auxiliary instrument Optical axes offset Main Far from meridian, the dome azimuth must be corrected for the optical axis offset 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The focus zone Focus  Focus index Focus  12/11/2018 C2PU-Team, Observatoire de Nice

The prime focus filter zone The F/3.2 coma-corrected prime focus of the Omicron@C2PU telescope has a built-in 6-slots computer-controlled filter loader: No filter Filter 1 Filter 2 Filter 3 Filter 4 Filter 5 Filter 6 NOTA: the 6 filters have to be chosen once for all at the beginning of the training period, among the following list of available filters: SDSS (Sloan) g’, r’, i’ or z’ Astro-photographic (Baader) R, G, B, or Luminance H (BW=5nm) O-III (BW=8.5nm) 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The tracking mode zone Telescope is halted Telescope is locked on its target Hour angle offset (’’) Tracking type Declination offset (’’) 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice The target zone Target’s apparent EOD coordinates Target’s defined by: Azimutal cords. Name Equatorial cords. or object name Right Ascension Declination Select from a scroll list Hour angle Azimuth Solar System planets Elevation Airmass Asteroids, comets Visual magnitude Set telescope in park position Slew to target Synchronize encoders Satellites 12/11/2018 C2PU-Team, Observatoire de Nice

Enter azimuthal coordinates Define the target by its azimuth and elevation Enter azimuth NOTA: input formats: type 180 for 180° 00’ 00’’ type 145 12 for 145° 12’ 00’’ type 110 21 34 for 110° 21’ 34’ type 91.5 for 91° 30’ 00’’ Enter elevation 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Enter equatorial coordinates Method 1: Define the target by its name Enter target’s identifier (ex: M31, Aldebaran, HD209458, NGC7635, 4UCAC556-032452 ...) Then left-click on the button “Find objects coordinates” The software launches automatically a request to a WEB stellar database (SIMBAD database at CDS). 12/11/2018 C2PU-Team, Observatoire de Nice

Enter equatorial coordinates Method 1: Define the target by its name The target’s name and equatorial coordinates should appear within seconds. 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Enter equatorial coordinates Method 1: Define the target by its name Should an error message pop up, then: check internet connectivity check spelling and syntax of the object’s identifier (connect to http://simbad.u-strasbg.fr/simbad/sim-fid and try to enter the identifier) contact a local staff member and try Method 2. 12/11/2018 C2PU-Team, Observatoire de Nice

Enter equatorial coordinates Method 2: Define the target by its equatorial coordinates Select the type of coordinates Enter target’s name Enter target’s equatorial coordinates 12/11/2018 ... then left click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Enter equatorial coordinates Method 2: Define the target by its equatorial coordinates PERMITTED FORMATS: for right ascension (default unit: hours) 12 32 23 for 12h 32m 23s 12 32 for 12h 32m 00s 12 for 12h 00m 00s 14.50 for 14h 30m 00s 30.5 d for 30.5 degrees (02h 30m 00s) for declination (default units: degrees) 20 54 36 for +20° 54’ 36’’ +20 54 36 for +20° 54’ 36’’ 20 54 for +20° 54’ 00’’ 20 for +20° 00’ 00’’ 20.5 for +20° 30’ 00’’ 20.5d for +20° 30’ 00’’ 12/11/2018 C2PU-Team, Observatoire de Nice

Choose from a list of targets Displays a list of “popular” targets Left-click on the desired line 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Solar System major objects Displays a list of Solar System planets Left-click on the desired object 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Solar System minor objects Define the target (asteroid, comet) by its identifier Enter object’s name (ex: Toutatis, 868, 2012DA14...) Select the type of object Then left-click on the button “Find objects coordinates” The software launches a request to a WEB ephemeris server (IMCCE). 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Solar System minor objects Define the target (asteroid, comet) by its identifier Should an error message pop up, then: check internet connectivity check spelling and syntax of the object’s identifier contact a local staff member. 12/11/2018 C2PU-Team, Observatoire de Nice

Solar System minor objects Define the target (asteroid, comet) by its identifier The target’s name and equatorial coordinates should appear within seconds. Select the type of tracking: Sidereal: telescope locks on the initial position of the (moving) object Differential: telescope locks on the object itself (proper motion taken into account) Half-speed: telescope follows the object, but with half is proper motion speed. 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Earth’s artificial satellites Editor for NORAD’s TLE (Two Lines Elements) Satellite selector TLE file browser Tracking mode selector Clear all Validate the choices Exit without validation 12/11/2018 C2PU-Team, Observatoire de Nice

Option 1: cut-and-paste TLEs TLEs here 12/11/2018 C2PU-Team, Observatoire de Nice

Option 1: cut-and-paste TLEs Left-click here to update the satellite list 12/11/2018 C2PU-Team, Observatoire de Nice

Option 1: cut-and-paste TLEs Left-click on the wanted satellite to select it 12/11/2018 C2PU-Team, Observatoire de Nice

Option 1: cut-and-paste TLEs Choose the tracking mode ... ... then left-click here to validate, ... or here to dismiss. 12/11/2018 C2PU-Team, Observatoire de Nice

Option 2: get TLEs from a file Left-click here to open the file browser 12/11/2018 C2PU-Team, Observatoire de Nice

Option 2: get TLEs from a file Navigate and select the wanted TLE file 12/11/2018 C2PU-Team, Observatoire de Nice

Option 2: get TLEs from a file Select the satellite ... Choose the tracking mode ... ... then left-click here to validate, ... or here to dismiss. 12/11/2018 C2PU-Team, Observatoire de Nice

Check target’s observability The target’s name and apparent, refracted EOD equatorial coordinates are displayed in the target zone CHECK that the target is in the observable zone ! 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice Observable zone Elevation: h > 18° Declination: < 60° Hour angle: -6h < H < +6h 12/11/2018 C2PU-Team, Observatoire de Nice

Go to target ! Left-click on the “Go to target” button A confirmation banner pops up ... 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

Interrupt the telescope’s slew The “Go to target” thread indicator turns green If you need to interrupt the telescope’s slew process, left-click on the “Go to target” thread indicator, which should turn red within seconds: 12/11/2018 C2PU-Team, Observatoire de Nice

Start the automatic dome control TO BE DONE ONLY IF AN AUXILLIARY OFF-AXIS OPTICAL INSTRUMENT IS USED !!!! Left-click here to validate the azimuth correction for shifted optics The corrected azimuth appears here The azimuth correction requires some geometrical parameters (auxiliary instrument optical axis offset). They should be entered in a configuration file by an authorized staff member only. 12/11/2018 C2PU-Team, Observatoire de Nice

Start the automatic dome control Left-click on the “Auto” button The dome’s slit should slew automatically and stop in front of the instrument’s aperture. The dome’s position is corrected automatically when needed. 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice Manual dome control NEVER use this button ! (authorized staff only) If needed, left-click on the “Auto” button to come back to manual mode Left-click on these buttons to move the dome 12/11/2018 C2PU-Team, Observatoire de Nice

To end the observations STEP 1: park the mount Left-click on the “Mount park” button A confirmation banner pops up ... 12/11/2018 ... then left-click on OK to validate, or on Cancel to dismiss C2PU-Team, Observatoire de Nice

To end the observations STEP 2: park the dome If needed, left-click on the “Auto” button to come back to manual mode ... ... then left-click on the “Park” button 12/11/2018 C2PU-Team, Observatoire de Nice

To end the observations STEP 3: close the dome Left-click on the “Close” button... ... then wait until the “STOP” button becomes disabled (grayed) 12/11/2018 C2PU-Team, Observatoire de Nice

To end the observations STEP 4: shutdown the TCS software Left-click on the “EXIT” button The TCS shutdown process last some 20 seconds. When the GUI disappears, the shutdown process is completed. 12/11/2018 C2PU-Team, Observatoire de Nice

To end the observations If a confirmation pop-up window appears: ... left-click on “OK” 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice END 12/11/2018 C2PU-Team, Observatoire de Nice

C2PU-Team, Observatoire de Nice END 12/11/2018 C2PU-Team, Observatoire de Nice