Detector R&D Lab. @ KoRIA In-Kwon Yoo (Pusan Nat’l University) HIM-KIAS 2011-09.

Slides:



Advertisements
Similar presentations
TYPE TEXT HERE On July 4, 2012, scientists at CERN announced the discovery of an essential part of the Standard Model of particle physics: the Higgs.
Advertisements

Progress on ACORDE (ALICE Cosmic ray detector) Ildefonso León for ACORDE-ALICE group.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
High Energy Physics Theory: Bigi, Delgado, Kolda –1 postdoc –5 students Experiment: Hildreth, Jessop, Lannon LoSecco, Ruchti, Wayne –3 research professors.
1. 2 CERN European Organization for Nuclear Research Founded in 1954 by 12 countries – Norway one of them Today: 20 member states, around 2500 staff –
Radiological Aspects of ILC Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
R. Cherkaoui March 2010 EU-MED 3 Brussels High-performance networking in the context of the ATLAS particle physics experiment Prof. Rajaa Cherkaoui.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Measurement of Gas Bremsstrahlung at the Pohang Light Source Hyosang Lee Seoul National University, Q2C Pusan National University, HANUL HNP2011.
A Plan to Construct a Rare Isotope Accelerator Facility KoRIA S. W. Hong Sungkyunkwan University (SKKU) On behalf of Conceptual Design Project Team S.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Petersburg Nuclear Physics Institute. Petersburg Nuclear Physics Institute was founded in 1954 as a part of Physical-Technical Institute of the Academy.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
11/18/2016 Test beam studies of the W-Si tracking calorimeter for the PHENIX forward upgrade Y. Kwon, Yonsei Univ., PHENIX.
Large Hadron Collider BY: DARSHAN MISTRY, ALEX GUMBRELL, CHRISTINE AUCIELLO, PATRICK DUNGOG.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
ATTRACT is a proposal for an EU-funded R&D programme for sensor, imaging and related computing devlopment Its purpose is to demonstrate the value of European.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Korea-ALICE Activity Report In-Kwon Yoo Pusan National University for KoALICE In-Kwon Yoo Pusan National University for KoALICE.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Physics whit ACORDE (ALICE Cosmic ray detector) Arturo Fernández for ACORDE-ALICE group.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
1 RHIC NSRL LINAC Booster AGS Tandems STAR 6:00 o’clock PHENIX 8:00 o’clock 10:00 o’clock Polarized Jet Target 12:00 o’clock RF 4:00 o’clock (AnDY, CeC)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
K2K and JHF-nu muon monitor Jun Kameda (KEK) 1. K2K muon monitor 2. JHF-ν muon monitor 3. Summary International workshop on Neutrino Beam Instrumentation,
The Laboratori Nazionali di Frascati of the Istituto Nazionale di Fisica Nucleare 1.
The Status of the CBM Experiment
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Major Nuclear and Radiation Physics experimental facilities in
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Outlook by the Physics Coordinator
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Hosting Orsay Walid KAABI
Testbeam plans for LEP instrumentation
IHEP group Shashlyk activity towards TDR
K2K and JHF-nu muon monitor
Status of the beta-beam study
Veksler and Baldin Laboratory
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
of secondary light ion beams
of secondary light ion beams
ILC/CLIC e+ generation working group
GlueX Electronics Review Jefferson Lab July 23-24, 2003
CERN The world’s largest Particle Physics Research Center in Geneva
CMS Goal of the experiment
LHCb VErtex LOcator For precision measurements of CP-violation at CERN (GENEVE) HALF of DETECTOR Si strip detector Read-out electronics Secondary vacuum.
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
LHCb VErtex LOcator ENGINEERING DEPARTMENT
2003 test beam with 25 ns bunched muons
CEA the French Atomic Energy Commission
Pakistan Institute of Engineering and Applied Sciences (PIEAS)
Particle Malaysia A Roadmap 2014 Wan Ahmad Tajuddin Wan Abdullah NCPP.
Measurement of KL  p0nn decay
The Laboratori Nazionali di Frascati of the
Presentation transcript:

Detector R&D Lab. @ KoRIA In-Kwon Yoo (Pusan Nat’l University) HIM-KIAS 2011-09

Outline Motivation Requirements Infrastructure Estimates Beam lines Peripherals Infrastructure Gas/Electronic/Mechanic facility Cooling/Vacuum system Organization Estimates Survey of needs IKY for HIM 2011-09 2018-11-12

Motivations No dedicated beam line for Detector Tests e-beam at PAL : I~mA..A with d~>10cm, ~<100MeV..1GeV (at beam dump) No beam profiler n-source from reactor/target : no defined flux No spectrometer for specific p-selection No fundamental infrastructure for Detector R&D No (Primitive) mechanic / electronic shop for repair No pool for fundamental modules No dedicated job position (no well-trained manpower) No link to industrial application No specific enterprise Potential : Medical instruments etc. IKY for HIM 2011-09 2018-11-12

Requirements Beam lines Beam line peripherals Primary beam line with p@610MeV, 660pmA - U@200MeV, 8pmA Secondary beam line with proper target Neutron production at beam dump Beam line peripherals Magnets : Quadro-, Hexa-pole Spectrometer : p-selection at downstream of target Target system Beam profiler Trigger system IKY for HIM 2011-09 2018-11-12

CERN-PS Beam Lines IKY for HIM 2011-09 2018-11-12

CERN-PS Beam Magnets IKY for HIM 2011-09 2018-11-12

CERN-PS : Detector Bench, Cables IKY for HIM 2011-09 2018-11-12

CERN-PS : BPD, Beam Profiler IKY for HIM 2011-09 2018-11-12

CERN-PS : Trigger System IKY for HIM 2011-09 2018-11-12

Infrastructure I Gas facility Electronics Mechanics Gas Warehouse Gas Providing/purging/recirculation system Monitoring/control system Electronics Cable bins from experimental to counting area Grounding / HV/HA system Electronic modules : library, repair shop Mechanics Material warehouse Mechanic shop : repair, construction Self-working room : Cutting, Drilling, Milling etc. IKY for HIM 2011-09 2018-11-12

Infrastructure II Cooling Facility Vacuum facility Computing facility Liquid-helium/nitrogen generator Gas/Liquid circulation system Monitoring/control system (for distribution) Vacuum facility Various vacuum level controller Valves, docking system Chamber heating/evacuation system Computing facility IT administration Storage (backup) / Network / Printing center etc. IKY for HIM 2011-09 2018-11-12

e.g. CERN-Gas Purifier System IKY for HIM 2011-09 2018-11-12

e.g. CERN-Monochrometer IKY for HIM 2011-09 2018-11-12

Organization (e.g. GSI) IKY for HIM 2011-09 2018-11-12

Technical Div. Esitimates Manpower : ~ 10 Experts + Trainee + 20 Technician Accelerator R&D Lab. Beam Line Design Expert Detector R&D Lab. GAS / Electronics / Vacuum / Mechanical / Safety IT Lab. Budgets Setup budget ~ 10BKRW Beam line 2 x 1B = 2BKRW Facilities 5 x 1B = 5BKRW Annual M&O budget ~ 2BKRW/yr Labor cost : 1B Materials / Travel / Training : 1B IKY for HIM 2011-09 2018-11-12

Education and Training Detector Training Course Public / Experts Industrial Linking IKY for HIM 2011-09 2018-11-12

Survey of needs Particle physics Nuclear physics Astrophysics KIRAMS Radiation Technology Industry GSI / CERN / BNL / Fermi Lab / SLAC / KEK etc. IKY for HIM 2011-09 2018-11-12

International Front-Ends 2010 2020 2030 2040 2050 LHC : pp, PbPb etc. 2010 2020 2030 2040 2050 LHC : pp, PbPb etc. CMS Detector Upgrade etc. Muon Results ALICE Detector Upgarde etc. Hadron Results ILC (new) New Detectors CDR, TDR, R&D, Construction New Physics Results International Collaboration New Concept of Detectors for New Physics Korean Facility Detector Upgrade & New Detector low-, mid-, high-Energy AA (RI) results LAMPs Detector CDR, TDR, Construction RI, UU Results : Cosmic Nuclear Synthesis Neutron-rich RI Drip line Symmetry Energy KoRIA CDR, TDR, Construction KoRIA Upgrade : Tevatron Magnets etc. Accelerator Industry IKY for HIM 2011-09 2018-11-12 KoRIA : UU, RI etc.