Reliability Valuation in AEP Texas

Slides:



Advertisements
Similar presentations
Keeping the Lights On A road map for taking electric reliability to the next level Presented by Dan ONeill to the EEI Customer Operations Executive Workshop.
Advertisements

APS Underground Distribution Cable Replacement Project
Trends in North American UVM Trends in North American Utility Vegetation Management (UVM) William Porter Principal Author of CN Utility Consulting Utility.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE.
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Microgrids and Infrastructure Resiliency RPI Microgrid Workshop Stuart Nachmias October 10, 2013.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
1 Distribution Automation Survey Presented at SWEDE Conference 2005 By Kevin Clark.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
1 March 1, 2007 Report An Overview October 30, 2006 – Staff Workshop.
Distribution Management System Implementation at Florida Power & Light
Electric Distribution Reliability OIR R Workshop May , 2015.
1 The Utility Breaker Tim Heard DDC Engineer AEP Texas SWEDE 2006.
NaDIA p-10 No Defect Is Acceptable Robotic Optical Inspection for Mechanical Assembly.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Rulemaking PacifiCorp Responses to ALJ Ruling May 26, 2015.
CL&P Distribution Capital Investment Program
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
4/22/2017 WHAT IS THERMOGRAPHY?
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
2. Terms and definitions1 # Voltage Sags and Interruptions.
STAYING IN THE VIRTUOUS CYCLE
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
Compare this model to your example & explanation sentences Secondly, these animals can cost a lot of money (2). Feeding a tiger, crocodile, or python is.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Outage Communication – Improving the Flow of Information Presented at the EEI Transmission, Distribution, and Metering Conference Tucson, Arizona October.
Automated Capacitor Control Program at TXU Electric Delivery SWEDE May 1, 2006.
Advanced Outage Avoidance Strategy
1 10% Worst Performing Circuits Reliability Program SWEDE Conference San Antonio, TX May 10, 2007 Kenton M. Brannan, P.E.
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
Highway Reactive Maintenance Darren Coffin-Smith May 2014.
2014 Hurricane Season Preparation Informal Meeting for Electric Utilities with Florida Public Service Commission Staff March 26, 2014.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Web’s Weekly Roundup & Limited Risk Reversals: Open Q&A November 7, 2015 Presenter: Web Begole.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
1 Managing Distribution System Reliability at Southern California Edison Robert Tucker Thach “Nicholas” Duong Roger Lee OIR R Workshop May 26.
FOR OVER 100 YEARS…LIFE. POWERED BY EDISON. Southern California Edison Presentation to City of Palos Verdes Estates December 13, 2011 Marvin Jackmon, Regional.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Pepco Best Practices Study. 2 Best Practice Superior performance within an activity, regardless of industry, leadership, management, or operational approaches,
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
Utility Needs and Smart Grid for Major Storm Events
Predictive-Based Maintenance Strategy
Slide #2 Kim Weaver Rocky Mount Public Utilities
Optimizing Circuit Performance Through Data Collection
35kV Assessment SWEDE 2007 May 10, 2007.
An-Najah National University
2016 Employee Incentive Plan Results
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Mobile workforce management solution
Software Quality Engineering
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Progress Energy Florida 2006 Hurricane Preparedness Florida PSC Internal Affairs Meeting June 5, 2006.
2007 Hurricane Season Preparedness Briefing
Grid Modernization Smart Grid NW – GridFWD
Reliability Valuation
Distribution Circuit Reliability Tool
SCE’s 2019 Wildfire Mitigation Plan
Presentation transcript:

Reliability Valuation in AEP Texas A Study on Cost Vs Returns

Introduction Study performed in 2009 Regression analysis What is a reliability program? Does it move the needle? Reduction vs prevention 2009 – we’ve implemented a lot of changes to the reliability programs since then Regression analysis – compared dollars spent in the past vs reliability improvement on those outage types Does it move the needle? - Do we see real SAIDI or SAIFI benefits? Reduction vs. prevention? - Does it make an outage smaller (sectionalizing) or does it prevent it to begin with (forestry)

Caveats Analysis – Correlation or Causation? Diminishing Returns Some outages mis-labeled Diminishing Returns Some programs very O&M heavy Results specific to AEP Texas The good ol’ disclaimer… Just because numbers went down, we can’t be entirely sure the investment is what drove that Some programs can only go so far before you saturate your system or before you run out of things to do GOOD OL’ DISCLAIMER – Past performance does not guarantee future results

Results Explanation Projection Dollars per customer minutes out Percent capital

Strong Performers D-Line inspection and repair: Lightning mitigation: $1.00/CMI, 24% capital Lightning mitigation: $1.03/CMI, 100% capital Sectionalizing: $1.70/CMI, 99% capital Station animal guards: $4.71/CMI, 80% capital

More Strong Performers Replacing older relays $5.42/CMI, 100% capital Installing station SCADA $5.67/CMI, 95% capital Feeder ties/upgrades $8.50/CMI, 95% capital

Weaker Than Expected Wire replacement: Performance-based forestry $33.98/CMI, 95% capital O&M savings from OT work Performance-based forestry $48.64/CMI, 24% capital Pole replacement: $495.05/CMI, 78% capital Safety Possibly skewed Performance-based means targeting areas that have already had tree problems (non-proactive.)

Other Notable Findings Cycle-based forestry $15.70/CMI, 18% capital Hybrid forestry $27.55/CMI, 18% capital System hardening – not much data in 2009 Distribution Automation – almost no data in 2009 Cycle-based forestry – purely trimming circuits on a cycle. Hybrid – some cycle, some performance-based.

Conclusion No plans to repeat the study at AEP SAIDI and SAIFI not the only drivers Customer satisfaction Overtime O&M reduction Safety Don’t skimp on inspections!