TGn Closing Report – July ‘05

Slides:



Advertisements
Similar presentations
TGu Timeline Date: Authors: March 2006 March 2006
Advertisements

Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
TGn PSMP Ad-hoc July 2007 Date: Authors: July 2007
IEEE WG Status Report – July 2005
TGn LB97 Frame Format Ad Hoc
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
TGn LB97 Frame Format Ad Hoc
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
3GPP liaison report July 2006
Motions Date: Authors: January 2006
TGn PSMP ad hoc Agenda – September 14 ‘06
TGp Closing Report Date: Authors: May 2007 Month Year
November Opening Report
TGu Timeline Date: Authors: March 2006 March 2006
TGn Sync Simulation Results – Goodput versus PHY overhead
TGp Closing Report Date: Authors: March 2006 Month Year
SEE-Mesh / Wi-Mesh Proposals Merger Report
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
TGu Closing Report Date: Authors: September 2005
ADS Study Group Mid-week Report
TGu Timeline Date: Authors: July 2005 July 2005
Joint Wireless Groups Architecture AdHoc
Selection Procedure Recommendation
TGu Closing Report Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGn Closing Report – May ‘05
TGn Closing Report – November 05
Attendance for November 2006
TGn PSMP Adhoc Group Dallas Opening report
TGu-changes-from-d0-01-to-d0-02
September Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
Joint Wireless Groups Architecture AdHoc
PHY Ad Hoc September Opening Report
TGn PSMP Adhoc Group Dallas Opening report
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
Agenda for Discussion on Green Field in TGn
[ Policies and Procedure Summary]
May 2005 CAPWAP AHC Closing Report
TGn Closing Report - January
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
TGn Proposed Draft Revision Notice
[ Policies and Procedure Summary]
PHY Motions for LB84 Comment Resolution
Agenda and minutes TGn PHY ad hoc
September 2012 Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
TGu Timeline Date: Authors: January 2005 January 2005
PHY Ad Hoc September Opening Report
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
PSMP Adhoc Oct TGn Adhoc
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
November 2014 Opening Report
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
Selection Procedure Recommendation
Presentation transcript:

TGn Closing Report – July ‘05 doc.: IEEE 802.11-05/0760r0 July 2005 TGn Closing Report – July ‘05 Date: 2005-07-16 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Bruce Kraemer, Conexant Bruce Kraemer, Conexant

Plans for July Reuse Agenda for January as a place holder for now doc.: IEEE 802.11-05/0760r0 May 2005 Plans for July Reuse Agenda for January as a place holder for now Which in rough outline form will be: Now to July Update technical proposals posted by 10 days prior to July meeting Email questions Single Stream adhoc teleconferences every 2 weeks beginning June 6 In Session July 18-22 Proposal presentations Q&A Elimination vote Bruce Kraemer, Conexant Bruce Kraemer, Conexant

July 2005 Motion: Moved: Because the TGn selection process allows proposals to ask for time to complete mergers prior to consideration, M&T&W are granted time to complete a merged Joint Proposal (JP) that will replace the current three remaining TGn proposals. The time line is: July 2005: Provide time this week (ref 5557R0 Bruce’s opening report) for these groups to go work on this effort. Sept 2005 JP draft will be provided to TGn; Q&A sessions on JP to that time. November 2005: JP replaces current 3 proposals; Confirmation vote on JP. Vote: 195/2/3 Bruce Kraemer, Conexant

X Jul 20 Jul 21 TGn - January Schedule Jul 18 Jul 19 July 2005 Recess Time Monday Tuesday Wednesday Thursday 8:00-10:00 X Recess 10:30-12:30 1:30-3:30 UCLA Presentation Proposal Updates Single stream CA status Merger Status 4:00-6:00 Opening, Agenda Minutes, CA & SS status Single Stream (if needed) Sept plans Utah Presentation 7:30-9:30 Bruce Kraemer, Conexant

Motion on adding FR10 and FR11 July 2005 Motion on adding FR10 and FR11 Motion: adopt new revision of document 11-03-0813-13-000n-functional-requirements containing the following changes: addition of FR10 and FR11. FR10: Existence of single spatial stream transmission modes Requirement: Proposal shall define single spatial stream transmission modes that provide at least one mode of operation that supports a maximum throughput of at least 50 Mbps in a 20MHz channel as measured at the MAC data SAP. FR11: Interoperability with single spatial stream non AP stations A .11n AP or STA shall interoperate with a single spatial stream entity defined as a non-AP STA that complies with the .11n proposal with the exception of only supporting single spatial stream transmission modes as required by FR10. Vote: 110/0/7 Bruce Kraemer, Conexant

September Agenda Plan Between now and September July 2005 doc.: IEEE 802.11-05/0760r0 July 2005 September Agenda Plan Between now and September No teleconference calls for SS or CA will be needed Partial merged proposal draft posted to server & announced on reflector by Monday Sept 12 Question submission via email Thursday Sept 15 Responses will be presented beginning Monday Sept 19 September Meeting Plan (Monday = September 19) Merged proposal Presentation & Discussion Coexistence Assurance status update Review Document linkage for changed FR Formulate and Consider WFA liaison request Bruce Kraemer, Conexant Bruce Kraemer, Conexant

Technical Proposal Documents July 2005 Technical Proposal Documents Submissions 05-0416 r2 Garth Hillman “TGn May Minutes” 05-0550 r2 Single stream ad hoc telecon minutes 05-0149 r5 WWiSE Proposal 05-0735 r0 MitMot Proposal Update Presentation 05-0737 r0 WWiSE Complete Proposal Presentation 04-1372 r5 MITMOT TGn Complete Proposal Detailed Description 04-0891 r7 TGnSync Proposal “PHY results” 04-0888 r13 TGnSync Proposal “Presentation” 04-0889 r7 TGnSync Proposal “Technical Specification” 04-0893 r6 TGnSync Proposal “MAC1 simulation results” 04-0894 r6 TGnSync Proposal “MAC2 simulation results”s 04-0895 r6 TGnSync Proposal “MAC simulation results” 04-0889 r5 TGnSync Proposal “Technical Specification” 04-0892 r7 TGnSync Proposal “MAC Results” 05-0415 r1 Security aspects of MAC aggregation Bruce Kraemer, Conexant

New Documents posted during July ’05 meeting Submissions 05-0688 r0 TGn Sync, WWiSE, MitMot Opening Report 05-0786 r0 TGn Sync, WWiSE, MitMot Closing Report 05-0706 r0 Single Stream ad hoc minutes of July 18 05-0559 r5 Single Stream ad hoc group 05-0701r2 Experiments with an 11n radio test bed 05-0790 r1 Soft Detector for 802.11n 05-0557 r1 TGn Opening Report 05-0665 r0 TGn July Minutes 05-0760 r0 TGn Closing Report Bruce Kraemer, Conexant

July 2005 End of Closing Report Bruce Kraemer, Conexant