Contractor Safety Forum Workshop

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

(Project Name) Site Safety Orientation. Family of Companies.
OSHA’s Voluntary Protection Program (VPP) Job Hazard Analysis Mishap reporting 1 This class is only intended to familiarize you with the programs in place.
Excavation Safety for Workers Specifically for Type C Soils Submitted by Dr Les LaFountain with Project Navigator, Ltd., June 2008.
Contractor Coordination. Agenda Training Objectives Definitions Law and Regulatory Requirements Responsibilities Implementation Scenarios.
High Pressure Injection 06/10/ Prelude To Incident A Miner was assisting his partner was the operator of the Mclean Bolter. The Miner was new.
Abbreviations COP Code of Practise FOP
Safety and Health Programs
This material was developed by Compacion Foundation Inc and The Hispanic Contractors Association de Tejas under Susan Harwood Grant Number SH SH0.
Safety and Health Programs
Permit to Work Procedure Document Number: KOC.SA.004
Risk Management (Safe Work Method Statements)
The most precious commodity in your organisation?
Review Quiz 1. OHS Legislation 4. Incident Response Introduction 2. Hazards & Controls 3. OHS Communication EASY GUIDES Australia.
Safety & Health Programs.
Safety and Health Program Section B of the Forest Activities Code.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
© North Slope Training Cooperative—revised All rights reserved. Alaska Safety Handbooks Course Number NSTC-04 Revised 11–2010.
Management Commitment to Safety The management of DeBusk Services Group, LLC is dedicated to providing the active leadership and support necessary to develop.
Permit to Work Occupational Health, Safety & Environment Training.
Job Safety Analysis.
MNM Fatal & 17 Machinery Accident Machinery Accident July 19, 2007 (Alaska) July 19, 2007 (Alaska) Gold Operation Gold Operation Contactor Iron.
EXCAVATION AND TRENCHING
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
Employee Safety Awareness Training. Welcome and Objectives Welcome to this web-based training about workplace safety. This course will:  Provide information.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
Chicago Area Facilities (CAF) Control of Work Policy.
Dangers Posed by Vehicle Loading Cranes Demonstrate the Need for Proper Crane Training.
Trainer Contact Information Wes Horton, CET, STS – – –

We always have time to work safely
Hazard Recognition: Watch Out for Dangers
Focus on What's Important
another pair of goggles
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Site Safety.
Confined Space-Hazards and
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Injury: Fall from height
Safety Accountabilities
Hazard Recognition: Watch Out for Dangers
Quarry Operator and Contractor Code of Conduct
QNJAC Contractors Sub-Committee
Risk management - HIRAC awareness presentation
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
U.S.D.A. FOREST SERVICE REGION 6
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
Smart Employment Solutions is the trusted name in Apprenticeships and Traineeships across Brisbane and Gold Coast. For advice and options call us on 07.
New Employee Orientation
OHS Staff Introduction Training
Plant Person Segregation
Safety is part of our culture at Halliburton
SAFETY LEADERSHIP FOR FRONTLINE SUPERVISORS
Please read this before using presentation
Confined Space-Hazards and
MODULE 2 UNIT 2 Incident Command Allow 60 minutes for this section.
What Is Workplace Violence?
Safety & Health Programs
Safety & Health Programs
Click to start.
Vendor Management The Safety Qualification Package and You!
SAFETY STANDARDS FINAL JEOPARDY
Please read this before using presentation
Confined space.
Observers of the Month July 2013 Restricted.
Safety & Health Programs
Vehicles to Keep Safe Distance at all times
RISK ASSESSMENT.
ENVIRONMENTAL, HEALTH & SAFETY POLICY
Effective Construction Safety Management
Presentation transcript:

Contractor Safety Forum Workshop May 15, 2018 Lion’s Hall Chalk River UNRESTRICTED / ILLIMITÉE UNRESTRICTED / ILLIMITÉ

Reminder of findings from Stantec Direct Causes • Using equipment improperly - Operating the mini-excavator outside the safe operation limits listed in the manufacturer’s operations manual, while having the boom and bucket in an elevated position, created an unstable and unsafe condition. • Procedure and practice not followed/Improper position for task - Entering into the workzone of mobile equipment without following the controls established by the team, and noted in Stantec’s Safe Work Practice 216 – Working Near Mobile Equipment. Root Causes • Planning the work – The worksite was not initially prepared or kept in a state to keep the slope within the safe operating limits of the mini-excavator. There was no evidence of a formal worksite arrangement or layout. This could include exclusion zones, break/rest areas, and retreat areas. This meant that some personal belongings and job materials were left in the path of travel when the mini-excavator operator began backfilling. • Situational awareness – Machine stability was not recognized as a hazard by the mini-excavator operator, or by anyone on site. Personnel did not recognize the potential of the machine to tip given the site conditions. • Communication – The communication plan, which included approaching from the left side and making eye-contact with the operator, was not followed when entering the workzone. You should leave this slide up on the screen so that the group can refer to it. UNRESTRICTED / ILLIMITÉE

Some Questions About Incident: I wasn’t sure who was coming to this meeting and didn’t want to insult any company that knows what a HIRAC plan is about. You might want to remind folks: Hazard Identification (HI) – list the hazards Risk Assessment (RA) – how often, how serious etc. Control (C) – apply controls Question #1 - Although the print out we received doesn’t mention the role of a HIRAC, I wanted to make sure that folks understand an HIRAC is the start. Questions #2 & #3 – I wanted to get the folks to reflect/share who is involved in the HIRAC (is it just OSH folks, engineers). It should include the people that are doing the work and a number of SME’s. Also that there needs to be someone that is accountable to review and sign off. Question #4 – A HIRAC is only as good as it is practically used to create work plans. Probe the group in how they take HIRAC info. and create work plans. Question #5 – reflect on the Statec incident and ask if their work plans get practical with work lay outs that give direction and expectations on how the worksite should look and be maintained What is the role of a Hazard Identification, Risk Assessment and Control (HIRAC) this incident or similar incidents? Who creates/contributes to your HIRAC plans? Who reviews your HIRAC plans? In your business, how do you use information from a HIRAC plan, to plan your work? In your work plans, do you include work site lay outs that include: exclusion zones, break/rest areas, and retreat areas UNRESTRICTED / ILLIMITÉE

Translating Written Plans to Field Practice This questions is added to probe in the area of how you get practical in the field. Perhaps you can bring out some principles of compliance based vs. risk based field practice. If you get no responses you can suggest things like: Plan of the week Plan of the day Supervisor training that includes their own competence to be able to manage employees performing the work Hazard recognition training/”over training” employees to recognize hazards Focus on competence of employees not just training Continual and planned field checks of high risk work: Confined space Working at Heights Heavy Equipment Digging, trenching, coring and cutting Equipment stability in excavation Hot work Can you share your best practices to make sure that the HIRAC and work plans are followed in the field: UNRESTRICTED / ILLIMITÉE