Identify the key elements in the development process that help maintain a balance between the physical capacity of a beach resort and the economic needs.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
Site Selection for a commercial aquaculture facility (ponds)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Louisiana Coastal Erosion. The problem LA contains approximately 40% of the nation's wetlands and experiences 80% of the nation's coastal wetland loss.
Marine Habitats and Communities. Main Concepts – Marine Habitats  Physical environment where community of organisms live is called a habitat.  Combination.
Chapter 05 Natural Resources and Environmental Sustainability McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16 The Dynamic Ocean
MBA (Trimester) Term V Module Title : Project Finance and Management
Lec 20, Ch.11: Transportation Planning Process (objectives)
Winthrop awx/index.jsp?c= | &sf=18750&ds=ArcWeb: GlobeXplorer.Deluxe_Tiles.Worl d|ArcWeb:TA.Streets_VectorsF.
Essential reading:  T. Skračić, Waypoint – English Textbook for Maritime Students, Faculty of Maritime Studies, Split 2010, Units  T. Trappe &
COROZAL LPWG Municipal Development Plan Presentation of draft chapters 1, 2 and 3 2 nd National Workshop Belmopan, December
Project Planning and Capital Budgeting
Chapter 9 Resort Operations: The Importance of Recreational Amenities
Lecture 4 Transport Network and Flows. Mobility, Space and Place Transport is the vector by which movement and mobility is facilitated. It represents.
5.1 Understand the process and value of conducting a feasibility analysis for your business Key Terms: Industry Target customers Competitive grid Prototype.
Henning Roedel Civil and Environmental Engineering Department Stanford University November 25, 2008.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Author name here for Edited books chapter 5 Facility Site and Design 5 chapter.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
Local Response to Climate Change: Swinomish Case Study Swinomish Indian Tribal Community.
Federal and State Coastal Zone Management Laws Introduction to Coastal Management.
City of Chelan J.A. Brennan Associates, PLLC in association with Reid Middleton | Coast & Harbor Engineering The Watershed Company | Shannon & Wilson Nelson.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
The Coast 1. The Sea 2 Wind Waves The Sea 3 TidesCurrents 1.Long-Shore 2.Cross-Shore.
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
CHAPTER FOUR BEACH RESORTS AND DESTINATION RESORT MARINAS: THE IMPACT OF DEVELOPMENT ON OPERATIONS Copyright © 2012 John Wiley & Sons, Inc. Photograph.
Dr. Mohamed Riyazh Khan DoMS
Bay Club Marina Reconstruction Coastal Commission Hearing December 15, 2010; Agenda Item W16b These materials have been provided to the Coastal Commission.
Chapter 05 Natural Resources and Environmental Sustainability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Learning the Basics of Recreation Facilities 3 chapter.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
Redevelopment in the Resort Housing District To the Sanibel- Captiva Chamber of Commerce Nov. 29, 2011 Prepared by: Planning Department.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Learning the Basics of Recreation Facilities
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Mountain Resorts, RV & Water-based Resorts
OPERATIONS MANAGEMENT STRATEGY 1. PRODUCT CHOICE 2. PROCESS CHOICE 3. FACILITIES CHOICE 4. QUALITY CHOICE.
CHAPTER TWO MOUNTAIN BASED RESORTS: THE IMPACT OF DEVELOPMENT ON OPERATIONS Copyright © 2012 John Wiley & Sons, Inc. Photograph Courtesy of SuperStock.
AIRPORT SURVEYS.
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
CHAPTER 5 TECHNICAL ANALYSIS.
DRAFT Delta Recreation Master Strategy: Aquatic Resources Focus
Warmup 10/9/12 Which type of traditional energy source do you think is best? Why? Give at least 3 reasons.
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Managing Coastlines.
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
COASTAL MANAGEMENT What is the impact of people on coasts?
Chapter 5 Planning.
Crafting a Business Plan and Building a Solid Strategic Plan
CHAPTER SEVEN: THE MENU
Capacity Planning For Products and Services
Capacity Planning For Products and Services
5.2 Why must we preserve the coast?
Why do sea levels change globally???
Crafting a Business Plan and Building a Solid Strategic Plan
Planning Commission.
Comments on the National Environmental Management: Integrated Coastal Management Amendment Bill Adv Gary Birch 23 July 2013.
Production and Operations Management
Breaches.
Capacity Planning For Products and Services
Presentation transcript:

Chapter 4 Beach Resorts and Destination Resort Marinas: The Impact of Development on Operations

Identify the key elements in the development process that help maintain a balance between the physical capacity of a beach resort and the economic needs of the developer. Six aspects must be taken into consideration when developing a beach resort.

Development Process Sea Site attractiveness is determined by: air temperature, amount of wind and sun, water temperatures, currents, tides and waves, ecology, pollution, clarity of water, and possible attractions. Seashore Consists of the surface under the water, extending out to a depth of 6 feet. Should consist of course sand or sand and pea gravel

Development Process Beach Slope of the beach should be between 2% and 10%, with 5% being the ideal Back beach Offers views to both the sea and inland Protection of degradation is a major concern as developers consider future improvements

Development Process Coastal Stretch Consists of the beach environment between 0.5 and 3 miles from the back beach Developers must consider where to place service facilities and access roads Surrounding Countryside Natural attractions, the extent of development, surrounding infrastructure, and the opportunity for excursions all need to be considered

Development Process Site Development In selecting a site for beach development, these elements warrant particular attention: Access to a permanent or transient seasonal population Access to major roads Minimum water temperatures in the upper 60’s during the swimming season Warm, sunny conditions before and during the season to warm the water and attract swimmers and sunbathers. Water quality needs to be analyzed before and after development as swimmers will add to the existing bacterial count.

Define the main factors affecting the attractiveness of a site for a beach resort. A variety of factors related to the sea affect the attractiveness of the site: Air Temperature There is a high correlation between swimming/beach use and maximum air temperature Amount and Intensity of the Wind and Sun A weak inverse relationship exists between swimming/beach use and wind A straight-line correlation exists between sunshine hours and swimming/beach use

Site Attractiveness Water Temperature Currents, Tides, Waves Ecology Including their direction, strength and seasonality Ecology Including seaweed and fish Pollution Clarity of water Possible Attractions Islands, coral, and conditions for water recreation

Explain the role of general Explain the role of general design principles in site planning for a marina. The process for developing a marina consists of five steps: Analyze the market Taking into account the area’s economy, analyze both demand and competitive supply to give a preliminary assessment of current market conditions.

Design Principles Develop a market strategy and marina concept Determine the services to be offered, define the size and mix of boats, specify the number of wet slips and dry storage areas, identify funding sources, calculate fees, and estimate cash flow. Identify the site Identify a preferred site by compiling and mapping data, scrutinizing development factors, and selecting several alternative sites. Note state and federal policies controlling proposed uses of the sites and select the superior site.

Design Principles Perform feasibility analysis and preliminary design Conduct an in-depth financial feasibility study, including an analysis of cash flow Address local zoning and building permits Design and develop the marina Create detailed construction photos, file for and obtain permits, secure local approvals, obtain construction bids and loans, and exercise the option on the land.

Describe the five developmental criteria that improve guest convenience, safety, and security. Proximity to a population base Accessibility by a main road artery Sufficient water in the marina basin for development Sufficient water depth and surface for the proposed activities

Developmental Criteria A minimum of 8 feet below low-water depth is ideal Natural protection from winds, storms, and flooding A stable shoreline Good southerly exposure

Developmental Criteria Good water quality A healthy flow of water through the marina helps wash pollutants away, while too strong a flow may make the marina unstable for boat storage. Aesthetically pleasing quality surroundings Reasonable fluctuation in water levels High water levels constitute a safety threat Freedom from ice

Analyze the interdependencies between the four principles that guide marina design. The geography determines the engineering The engineering determines the profile The profile determines the layout The layout determines the architecture

The geography determines the engineering Major costs in building a marina come from: dredging, locks, bulkheads, breakwaters and piles Dredging: Dredging changes the bottom profile of the basin to allow deeper-draft boats to dock in the marina Locks: Locks may be the answer where a site is otherwise inaccessible. They are necessary where the tidal range is greater than 12 feet or where there is a major change in elevation between the basin and open water.

The geography determines the engineering Bulkheads: A bulkhead is “a retaining wall that is backed with solid fill and erected along the water to extend the upland out to the bulkhead line; serves as protection against tidal or watercourse erection of land Breakwaters: Breakwaters are used to shield the marina from wave action. Potential wave action is simulated by engineers to determine the extent of breakwaters needed. Piles: Support fixed piers and bulkheads and anchor floating piers

The engineering determines the profile The four basic marina types are offshore, recessed, built-in and landlocked Offshore: Requires minimum bulkhead wall, land take, and dredging, and can therefore be the least expensive type to build Recessed: When conditions on the sea bottom do not allow for an offshore layout, a recessed marina may be the economical option

The engineering determines the profile Built-In: Offers the advantages of an uninterrupted shoreline, a large land-water interface, and considerable enclosure Landlocked: Costliest and safest type of marina Offers maximum enclosure and minimum interruption of shoreline, yet requires maximum bulkhead wall and dredging

The profile determines the layout The best basin shape is rectangular, which allows for the greatest density of boats with the easiest maneuvering The basic choice in mooring layout is whether to have fixed or floating piers The layout is determined by the site constraints as well as the demands of the expected market

The layout determines the architecture Architects must take into account the circulation pattern, the social interests of the boaters, and the need for support facilities. Users can be divided into social and service traffic and by destination Boaters place few demands on facilities and are willing to put up with maintenance

The layout determines the architecture To attract non-boaters, marinas must increase attractiveness and provide more recreational opportunities A variety of support facilities will be needed, depending on the type of marina development, including toilets/showers, boat service center, boat launching equipment, boat sewage disposal and water take-on, fire­fight­ing equipment, and boat storage facilities.

The End!